Beijing Subway

Coordinates: 39°54′50″N 116°23′30″E / 39.9138°N 116.3916°E / 39.9138; 116.3916
From Wikipedia, the free encyclopedia

Beijing Subway
Logo of Beijing Subway
Logo of Beijing Subway
A line 13 train leaving Huoying station
A line 13 train leaving Huoying station
Overview
Native name
Chinese name
Simplified Chinese北京ぺきん
Traditional Chinese北京ぺきんてつ
OwnerBeijing Municipal Government
LocaleBeijing & Langfang, Hebei
Transit typeRapid transit
Number of lines27
Number of stations490[1]
Daily ridership10.544 million (2018 daily avg.)[2]
13.7538 million (12 July 2019 record)[3]
Annual ridership3.8484 billion (2018)[2]
Websitebjsubway.com
mtr.bj.cn
bjmoa.cn
Operation
Began operation15 January 1971; 53 years ago (1971-01-15)
Operator(s)
CharacterUnderground, at grade and elevated
Number of vehicles6,173 Revenue Railcars (2019)[4]
Technical
System length836 km (519 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification
System map

The Beijing Subway is the rapid transit system of Beijing Municipality that consists of 27 lines including 22 rapid transit lines, two airport rail links, one maglev line and 2 light rail lines, and 490 stations.[1] The rail network extends 836 km (519 mi)[1] across 12 urban and suburban districts of Beijing and into one district of Langfang in neighboring Hebei province. With 3.8484 billion trips delivered in 2018,[2] an average of 10.544 million trips per day,[2] the Beijing Subway is the world's busiest metro system. Single-day ridership set a record of 13.7538 million on July 12, 2019.[3] Being 836 kilometres (519 mi) in system length, the Beijing Subway is the longest metro system by route length, surpassing the Shanghai Metro in December 2023.

The Beijing Subway opened in 1971 and is the oldest metro system in mainland China and on the mainland of East Asia. Before the system began its rapid expansion in 2002, the subway had only two lines. The existing network still cannot adequately meet the city's mass transit needs. Beijing Subway's extensive expansion plans call for 998.5 km (620.4 mi)[5] of lines serving a projected 18.5 million trips every day when Phase 2 Construction Plan finished (around 2025).[6][7][8] The most recent expansion came into effect on December 30, 2023, with the openings of extensions to Line 11, Line 16, and Line 17.

Fares[edit]

Fare schedules[edit]

Single-ride fare
The Beijing Subway charges single-ride fare according to trip distance for all lines except the two airport express lines.

  • For all lines except the two airport express lines, fares start at ¥3 for a trip up to 6 km in distance, with ¥1 added for the next 6 km, for every 10 km thereafter until the trip distance reaches 32 km, and for every 20 km beyond the first 32 km.[9] A 40 km trip would cost ¥7.
  • The Capital Airport Express has a fixed fare of ¥25 per ride.[10]
  • The Daxing Airport Express is the only line to maintain class-based fares with ordinary class fare varying with distance from ¥10 to ¥35 and business class fare fixed at ¥50 per ride.[11]

Same-station transfers are free on all subway lines except the two Airport Express lines, the Xijiao Line and the Yizhuang T1 Line, which require the purchase of a new fare when transferring to or from those lines.

Fare free riders

Children below 1.3 metres (51 in) in height ride for free when accompanied by a paying adult.[12] Senior citizens over the age of 65, individuals with physical disabilities, retired revolutionary cadres, police and army veterans who had been wounded in action, military personnel and People's Armed Police can ride the subway for free.[13]

Unlimited-rides fare
Since January 20, 2019, riders can purchase unlimited rides fare tickets using the Yitongxing (亿通行つうこう) APP on smartphones, which generates a QR code with effective periods of one to seven days.

Distance-based single-ride fare schedule
Fare Trip distance
¥3 <6 km
¥4 6–12 km
¥5 12–22 km
¥6 22–32 km
¥7 32–52 km
¥8 52–72 km
¥9 72–92 km
¥10 92–112 km
Unlimited-rides fare schedule
Period Price
1 day ¥20
2 days ¥30
3 days ¥40
5 days ¥70
7 days ¥90

Previous fare schedules
On December 28, 2014, the Beijing Subway switched from a fixed-fare schedule to the current distance-based fare schedule for all lines except the Capital Airport Express.[9][11] Prior to the December 28, 2014 fare increase, passengers paid a flat rate of RMB(¥) 2.00 (including unlimited fare-free transfers) for all lines except the Capital Airport Express, which cost ¥25,[14] The flat fare was the lowest among metro systems in China.[15] Before the flat fare schedule was introduced on October 7, 2007, fares ranged from ¥3 to ¥7, depending on the line and number of transfers.

Fare collection[edit]

Each station has two to fifteen ticket vending machines.[16] Ticket vending machines on all lines can add credit to Yikatong cards.[17] Single-ride tickets take the form of an RFID-enabled flexible plastic card.

Discounts for Yikatong card users
Monthly
expenditure
Net expenditure
after credit rebate
Net discount
¥50 ¥50 0%
¥100 ¥100 0%
¥150 ¥140 6.67%
¥200 ¥165 17.5%
¥250 ¥190 24%
¥300 ¥215 28.3%
¥350 ¥240 31.4%
¥400 ¥265 33.75%
¥450 ¥315 30%
¥500 ¥365 27%

Passengers must insert the ticket or scan the card at the gate both before entering and exiting the station. The subway's fare collection gates accept single-ride tickets and the Yikatong fare card. Passengers can purchase tickets and add credit to Yikatong card at ticket counters or vending machines in every station. The Yikatong, also known as Beijing Municipal Administration & Communication Card (BMAC), is an integrated circuit card that stores credit for the subway, urban and suburban buses and e-money for other purchases.[18] The Yikatong card itself must be purchased at the ticket counter. To enter a station, the Yikatong card must have a minimum balance of ¥3.00.[19] Upon exiting the system, single-ride tickets are inserted into the turnstile, which are reused by the system.

Beijing Subway fare media
A single-ride farecard

To prevent fraud, passengers are required to complete their journeys within four hours upon entering the subway.[13] If the four-hour limit is exceeded, a surcharge of ¥3 is imposed.[20] Each Yikatong card is allowed to be overdrawn once. The overdrawn amount is deducted when credits are added to the card.[21]

Yikatong card users who spend more than ¥100 on subway fare in a calendar month will receive credits to their card the following month.[9] After reaching ¥100 of spending in one calendar month, 20% of any further spending up to ¥150 will be credited. When spending exceeds ¥150, 50% of any further spending up to ¥250 will be credited.[9] Once expenditures exceed ¥400, further spending won't earn any more credits.[9] The credits are designed to ease commuters' burdens of fare increases.[9]

Beginning in June 2017, single-journey tickets could be purchased via a phone app.[22] A May 2018 upgrade allowed entrance via scanning a QR code from the same app.[23]

Since the COVID-19 pandemic, a name and Chinese Resident Identity Card number must be entered when buying single-ride tickets for contact tracing purposes. This measure has been criticized for increasing the time spent buying tickets.[24] This is no longer the case as of December 2022.

Lines in operation[edit]

Beijing Subway lines generally follow the checkerboard layout of the city. Most lines through the urban core (outlined by the Line 10 loop) run parallel or perpendicular to each other and intersect at right angles.

Schematic map of Beijing Subway lines in operation. (Not to scale)
Line Name Code Terminals
(District)
Opened
[25]
Newest
Ext.
Length
km
Stations
(# above ground)
Operator
01 1  &  Batong [a] M1 Pingguoyuan
(Shijingshan)
Universal Resort
(Tongzhou)
1971[b] 2021 50.9 36 (13)[c]
02 2 
loop line
M2 Xizhimen
(Xicheng)
Jishuitan
(Xicheng)
1984 1987 23.1 18
04 4  &  Daxing [d] M4 Anheqiaobei
(Haidian)
Tiangongyuan
(Daxing)
2009 2010[d] 49.4 35 (2)
05 5  M5 Tiantongyuanbei
(Changping)
Songjiazhuang
(Fengtai)
2007 27.6 23 (7)
06 6  M6 Jin'anqiao
(Shijingshan)
Lucheng
(Tongzhou)
2012 2018 53.4[29] 34[c]
07 7  M7 Beijing West railway station
(Fengtai)
Universal Resort
(Tongzhou)
2014 2021 40.3 30
08 8  M8 Zhuxinzhuang
(Changping)
Yinghai
(Daxing)
2008 2021 49.5 34 (3)[c]
09 9  M9 Guojia Tushuguan (National Library)
(Haidian)
Guogongzhuang
(Fengtai)
2011 2012 16.5 13
10 10 
loop line
M10 Bagou
(Haidian)
Chedaogou
(Haidian)
2008 2013 57.1 45
11 11 
M11 Moshikou
(Shijingshan)
Xinshougang (Shougang Park)
(Shijingshan)
2021 2023 2.9 4
13 13  M13 Xizhimen
(Xicheng)
Dongzhimen
(Dongcheng)
2002 2003 40.9 17 (16)
14 14  M14 Zhangguozhuang
(Fengtai)
Shangezhuang
(Chaoyang)
2013 2021 47.3 33 (2)[c]
15 15  M15 Qinghua Donglu Xikou
(Haidian)
Fengbo
(Shunyi)
2010 2014 41.4 20 (4)
16 16  M16 Bei'anhe
(Haidian)
Wanpingcheng
(Fengtai)
2016 2023 48.9[30] 29[c]
17 17  (North) M17 Future Science City North
(Changping)
Workers' Stadium
(Chaoyang)
2023 24.9[30] 9[c]
17 17  (South) Shilihe
(Chaoyang)
Jiahuihu
(Tongzhou)
2021 15.8[31] 7
 19  M19 Mudanyuan
(Haidian)
Xingong
(Fengtai)
2021 20.9[31] 10[1]
 Yizhuang  M24 Songjiazhuang
(Fengtai)
Yizhuang railway station
(Tongzhou)
2010 2018 23.3 14 (8)
 Fangshan  M25 North Dongguantounan
(Fengtai)
Yancundong
(Fangshan)
2010 2020 31.8 16 (10)
 Yanfang  M25 South Yancundong
(Fangshan)
Yanshan
(Fangshan)
2017 14.4 9 (9)
 S1 
Maglev
M26 Pingguoyuan
(Shijingshan)
Shichang
(Mentougou)
2017 2021 10.2[32] 8 (8)
 Changping  M27 Changping Xishankou
(Changping)
Xitucheng
(Haidian)
2010 2023 43.2 18 (6)[c]
 Capital Airport  M34[33] Beixinqiao
(Dongcheng)
2 Hao Hangzhanlou (Terminal 2) (Chaoyang)
3 Hao Hangzhanlou (Terminal 3) (Shunyi)
2008 2021 29.9 5 (1)
 Daxing Airport  M35[34] Caoqiao
(Fengtai)
Daxing Jichang (Daxing Airport) (Guangyang, Langfang)
2019 41.36 3
 Xijiao 
LRT
M29 Bagou
(Haidian)
Fragrant Hills
(Haidian)
2017 8.8 6 (6)
 Yizhuang T1 
LRT
Quzhuang
(Daxing)
Dinghaiyuan
(Tongzhou)
2020 11.9 14 (14)
Total 836[1] 490[1] (109)
A Line 2 train
Line 1 platform at Tian'anmen East Station
Ticket entry gates at Yuanmingyuan Park station

Lines through the urban core[edit]

The urban core of Beijing is roughly outlined by the Line 10 loop, which runs underneath or just beyond the 3rd Ring Road. Each of the following lines provides extensive service within the Line 10 loop. All have connections to seven or more lines. Lines 1, 4, 5, 6, 8, and 19 also run through the Line 2 loop, marking the old Ming-Qing era city of Beijing.

Lines serving outlying suburbs[edit]

Each of the following lines provides service predominantly to one or more of the suburbs beyond the 5th Ring Road. Lines 15, S1 along with the Changping, Daxing, Yanfang lines extend beyond the 6th Ring Road.

Future expansion[edit]

Phase II[edit]

According to the Phase 2 construction plan approved by the NDRC in 2015, the length of Beijing Subway will reach 998.5 km (620.4 mi)[35] when the Phase 2 construction finished.[35] By then, public transit will comprise 60% of all trips. Of those, the subway will comprise 62%.[35] The adjustment of the Phase 2 construction plan was approved by the NDRC on December 5, 2019.[36] Which altered and expanded some projects in the Phase 2 construction plan. Including adjusting alignments of Line 22 and Line 28 and additional projects such as the Daxing Airport Line north extension, the west section of Line 11 and transforming Line 13 into two lines, 13A and 13B.[37]

A map showing Beijing subway lines currently in operation (solid lines) and subway lines approved by the NDRC (dashed lines). The map is not drawn to scale.
Future Expansion (Phase 2)
Planned
opening
Line Phase & Section Terminals
(District)
Route Description Construction
since
Length
(km)
Stations Status Refs
2024  1  Renovation on Fushouling station Pingguoyuan
(Shijingshan)
Fushouling
(Shijingshan)
2020 1.6 2 Under construction [38]
 3  Phase I Dongsi Shitiao
(Dongcheng)
Dongbabei
(Chaoyang)
2017 15.6 10 [39][40]
 12  Sijiqingqiao
(Haidian)
Dongbabei
(Chaoyang)
Following the North Third Ring Road 2015 29.6 20 [41][42]
2025  17  Middle section of Phase I Workers' Stadium
(Chaoyang)
Shilihe
(Chaoyang)
2015 7.6 4
 22  (Pinggu) Dongdaqiao
(Chaoyang)
Pinggu
(Pinggu)
2021 81.2 21 [43]
 13A  Line 13 split project Chegongzhuang
(Xicheng)
Tiantongyuandong
(Changping)
2021[44] 31.2 (19.8 new) 18 [45][44]
 13B  Dongzhimen
(Dongcheng)
Malianwa
(Haidian)
2021[44] 32.2 (9.2 new) 15
 Daxing Airport  North extension Lize Shangwuqu
(Fengtai)
Caoqiao
(Fengtai)
2020 3.5 1 [46]
2026  6  South ext. of Phase II Lucheng
(Tongzhou)
Dongxiaoyingnan
(Tongzhou)
2022 2.1 1 [47][48]
2029  28  (CBD line) Dongdaqiao
(Chaoyang)
Guangqudonglu
(Chaoyang)
Runs through the Central Business District 2021[49] 8.9[50] 9 [50][49]
Total 213.5 101

Phase III (2022–2027)[edit]

According to the information released in July 2022, the "Beijing Rail Transit Phase III Construction Plan" includes 11 construction projects: Line 1 Branch, Line 7 Phase 3, Line 11 Phase 2, Line 15 Phase 2, Line 17 Phase 2 (Branch), Line 19 Phase 2, Line 20 Phase 1, Fangshan line (Line 25) Phase 3 (also known as Lijin Line), Line M101 Phase 1, Line S6 (New Town Link Line) Phase 1, and the connecting line between Yizhuang line, Line 5 and Line 10.[51]

Future Expansion (Phase 3)
Line Terminals Planned Opening Length
in km
Station Source
 1 
Branch
Bajiao Amusement Park Qinglonghudong 2027 19.9 9 [51]
 7 
Phase 3
Beijing West railway station Wanshousi 6.4 4
 11 
Phase 2
Xinshougang (Shougang Park) Yangqiao 23.8 17
 15 
Phase 2
Fengbo Nancai 3.5 1
 17 
Branch
Tiantongyuandong Beiqijia 8.9 2
 19 
North
Mudanyuan Shengminggu 17.6 6
 19 
North Branch
Shangqingqiaonan Qinghe railway station 6.8 1
 19 
South
Xingong Haizijiao 12.6 6
 19 
South Branch
New Media Industry Base Biomedical Base West 17.4 7
 20 
Phase 1
Guanzhuangluxikou Linhe 19 4
 Fangshan 
Phase 3
Dongguantounan Lingjing Hutong 10.9 8
 M101 
Phase 1
Shangwuyuan Zhangjiawandong 2027 18.1 14
 S6 
Phase 1
Terminal 3 Daxing Xincheng 64.4 9
 Yizhuang - 5 - 10 
(Connecting line)
Connecting Xiaocun, Chengshousi, and Songjiazhuang. 1.1 0
Total 230.4 88

Owner and operators[edit]

The Beijing Subway is owned by the Beijing Municipal People's Government through the Beijing Infrastructure Investment Co., LTD, (北京ぺきんもと础设ほどこせとう资有げん公司こうし or BIIC), a wholly owned subsidiary of the Beijing State-owned Assets Supervision and Administration Commission (北京ぺきん人民じんみん政府せいふ国有こくゆう资产监督管理かんり员会 or Beijing SASAC), the municipal government's asset holding entity.

The Beijing Subway was originally developed and controlled by the Central Government. The subway's construction and planning was headed by a special committee of the State Council. In February 1970, Premier Zhou Enlai handed management of the subway to the People's Liberation Army, which formed the PLA Rail Engineering Corp Beijing Subway Management Bureau.[52] In November 1975, by order of the State Council and Central Military Commission the bureau was placed under the authority of Beijing Municipal Transportation Department.

On April 20, 1981, the bureau became the Beijing Subway Company, which was a subsidiary of the Beijing Public Transportation Company.[53]

In July 2001, the Beijing Municipal Government reorganized the subway company into the Beijing Subway Group Company Ltd., a wholly city-owned holding company, which assumed ownership of all of the subway's assets.[53] In November 2003, the assets of the Beijing Subway Group Company were transferred to the newly created BIIC.

The Beijing Subway has five operators:

  1. The main operator is the wholly state-owned Beijing Mass Transit Railway Operation Corp. (北京ぺきん铁运营有げん公司こうし or Beijing Subway OpCo), which was formed in the reorganization of the original Beijing Subway Group Company in 2001, and operates 15 lines: Lines 1, 2, 5–10, 13, 15, Batong line, Changping line, Fangshan line, Yizhuang line and S1 line.[54]
  2. The Beijing MTR Corp. (北京ぺきんきょうこう铁有げん公司こうし or Beijing MTR), a public–private joint venture formed in 2005 by and among Beijing Capital Group, a state company under Beijing SASAC (with 49% equity ownership), MTR Corporation of Hong Kong (49%), and BIIC (2%),[55] and operates four lines: Lines 4, 14, 16 and Line 17 and Daxing line.[56][57]
  3. The Beijing Metro Operation Administration Corp., Ltd. [zh][58] (北京ぺきん轨道交通こうつう运营管理かんり有限ゆうげん公司こうし or BJMOA[59]), a subsidiary of Beijing Metro Construction Administration Corporation Ltd. (北京ぺきん轨道交通こうつうけん管理かんり有限ゆうげん公司こうし or BJMCA) also under Beijing SASAC, became the third company to obtain operation rights for the Beijing Subway in 2015. The BJMOA operates the Yanfang line, Daxing Airport Express, and Line 19.[60][61][62] Its corporate parent, BJMCA, is a general contractor for Beijing Subway construction.[63]
  4. The Beijing Public Transit Tramway Co., Ltd. (北京ぺきんこう交有轨电车有げん公司こうし), formed in 2017, is a wholly owned subsidiary of Beijing Public Transport Corporation (北京ぺきん公共こうきょう交通こうつうひかえまたあつまり团)有限ゆうげん公司こうし or BPTC) that operates the Xijiao line.[64] Its corporate parent, BPTC, is the city's main public bus operator.
  5. The Beijing City Metro Ltd. [zh] (北京ぺきんきょうじょう铁有げん公司こうし), also branded as "Capital Metro" (きょうしろ铁) in their official logo,[65] operates the Capital Airport Express.[66] Beijing City Metro Ltd. is a joint venture established on February 15, 2016, between Beijing Subway OpCo (51%) and BII Railway Transportation Technology Holdings Company Limited (49%)(きょうとう轨道交通こうつう科技かぎひかえまた有限ゆうげん公司こうし), a Hong Kong listed company (1522.HK) controlled by BIIC.[67] On March 27, 2017, Beijing City Metro Ltd. acquired a 30-year right to operate the Capital Airport Express and sections of the Dongzhimen subway station.[68]

Rolling stock[edit]

All subway train sets run on 1,435 millimetres (56.5 in) standard gauge rail, except the maglev trains on Line S1, which run on a maglev track.[69] Beijing Subway operates Type B trains on most lines. However, due to increasing congestion on the network, high capacity Type A trains are increasingly being used. Additionally, Type D trains are being used in express subway lines.

Until 2003 nearly all trains were manufactured by the Changchun Railway Vehicles Company Ltd., now a subsidiary of the China CNR Corporation.[70] The newest Line 1 trains and those on Lines 4, 8, Batong, Changping and Daxing are made by Qingdao Sifang Locomotive & Rolling Stock Co., a subsidiary of China South Locomotive and Rolling Stock Industry Corp.[71][72] Line S1's maglev trains were produced by CRRC Tangshan.

The Beijing Subway Rolling Stock Equipment Co. Ltd., a wholly owned subsidiary of the Beijing Mass Transit Railway Operation Corp. Ltd., provides local assemblage, maintenance and repair services.

Subway rolling stock are maintained at depots such as the Wuliqiao Depot for Line 6.

Automated lines[edit]

There will be 6 fully automated lines at the level of GoA4, including 4 lines in operation (the Yanfang line, Line 17 and Line 19 and the Daxing Airport Express) and 2 lines under construction (Line 3 and Line 12), using domestically developed communications-based train control systems.[73]

History[edit]

Schema showing the development of the Beijing Subway from 1971 to 2018

1953–1965: origins[edit]

The subway was proposed in September 1953 by the city's planning committee and experts from the Soviet Union.[74] After the end of the Korean War, Chinese leaders turned their attention to domestic reconstruction. They were keen to expand Beijing's mass transit capacity but also valued the subway as an asset for civil defense. They studied the use of the Moscow Metro to protect civilians, move troops and headquarter military command posts during the Battle of Moscow, and planned the Beijing Subway for both civilian and military use.[74]

At that time, the Chinese lacked expertise in building subways and drew heavily on Soviet and East German technical assistance. In 1954, a delegation of Soviet engineers, including some who had built the Moscow Metro, was invited to plan the subway in Beijing.[74] From 1953 to 1960, several thousand Chinese university students were sent to the Soviet Union to study subway construction.[74] An early plan unveiled in 1957 called for one ring route and six other lines with 114 stations and 172 km (107 mi) of track.[74] Two routes vied for the first to be built. One ran east–west from Wukesong to Hongmiao, underneath Changan Avenue. The other ran north–south from the Summer Palace to Zhongshan Park, via Xizhimen and Xisi. The former was chosen due to more favorable geological foundation and greater number of government bureaus served. The second route would not be built until construction on Line 4 began forty years later.

The original proposal called for deep subway tunnels that can better serve military functions.[75] Between Gongzhufen and Muxidi, shafts as deep as 120 m (390 ft) were being dug.[75] The world's deepest subway station at the time in the Kyiv Metro was only 100 m (330 ft) deep.[75] But Beijing's high water table and high pressure head of ground water which complicated construction and posed risk of leakage, and along with the inconvenience of transporting passengers long distances from the surface, led the authorities to abandon the deep tunnel plan in May 1960 in favor of cut-and-cover shallow tunnels some 20 m (66 ft) below the surface.[75]

The deterioration of relations between China and Soviet Union disrupted subway planning. Soviet experts began to leave in 1960, and were completely withdrawn by 1963.[76] In 1961, the entire project was halted temporarily due to severe hardships caused by the Great Leap Forward. Eventually, planning work resumed. The route of the initial line was shifted westward to create an underground conduit to move personnel from the heart of the capital to the Western Hills. On February 4, 1965, Chairman Mao Zedong personally approved the project.[77]

1965–1981: the slow beginning[edit]

Yuquanlu Station, Opened on August 5, 1971. The first phase of the Beijing subway project groundbreaking ceremony was held west of Yuquanlu Road.
Many areas of Beijing's city walls were torn down during the construction of the subway. The route of the initial subway line was slightly altered to save the Qianmen gate.

Construction began on July 1, 1965, at a groundbreaking ceremony attended by several national leaders including Zhu De, Deng Xiaoping, and Beijing mayor Peng Zhen.[78] The most controversial outcome of the initial subway line was the demolition of the Beijing's historic inner city wall to make way for the subway. Construction plans for the subway from Fuxingmen to the Beijing Railway Station called for the removal of the wall, as well as the gates and archery towers at Hepingmen, Qianmen, and Chongwenmen. Leading architect Liang Sicheng argued for protecting the wall as a landmark of the ancient capital. Chairman Mao favored demolishing the wall over demolishing homes. In the end, Premier Zhou Enlai managed to preserve several walls and gates, such as the Qianmen gate and its arrow tower by slightly altering the course of the subway.[79]

Plans of the Beijing Subway network
1965 Plan
1973 Plan
1983 Plan
1993 Plan

The initial line was completed and began trial operations in time to mark the 20th anniversary of the founding of the People's Republic on October 1, 1969.[77][80] It ran 21 km (13 mi) from Gucheng to the Beijing Railway Station and had 16 stations.[77] This line forms parts of present-day Lines 1 and 2. It was the first subway to be built in China, and predates the metros of Hong Kong, Seoul, Singapore, San Francisco, and Washington, D.C., but technical problems would plague the project for the next decade.

Satellite image of the construction of initial line shot by US spy satellite Corona KH-4B on 20 September 1967.
Entrance to the Fushouling station, once designated terminus of Line 1 but never opened to the public.
Entrance to the Wukesong station on Line 1

Initially, the subway hosted guest visits.[77] On November 11, 1969, an electrical fire killed three people, injured over 100 and destroyed two cars.[77] Premier Zhou Enlai placed the subway under the control of the People's Liberation Army in early 1970, but reliability problems persisted.[77]

On January 15, 1971, the initial line began operation on a trial basis between the Beijing railway station and Gongzhufen.[81] Single ride fare was set at ¥0.10 and only members of the public with credential letters from their work units could purchase tickets.[81] The line was 10.7 km (6.6 mi) in length, had 10 stations and operated more than 60 train trips per day with a minimum wait time of 14 minutes.[81] On August 15, the initial line was extended to Yuquan Lu and had 13 stations over 15.6 km (9.7 mi).[81] On November 7, the line was extended again, to Gucheng Lu, and had 16 stations over 22.87 km (14.21 mi).[81] The number of trains per day rose to 100. Overall, the line delivered 8.28 million rides in 1971, averaging 28,000 riders per day.[81]

From 1971 to 1975, the subway was shut down for 398 days for political reasons.[f] On December 27, 1972, the riders no longer needed to present credential letters to purchase tickets.[81] In 1972, the subway delivered 15 million rides and averaged 41,000 riders per day.[81] In 1973, the line was extended to Pingguoyuan and reached 23.6 km (14.7 mi) in length with 17 stations and 132 train trips per day.[81] The line delivered 11 million rides in 1973, averaging 54,000 riders per day.[81]

Despite its return to civilian control in 1976, the subway remained prone to closures due to fires, flooding, and accidents. Annual ridership grew from 22.2 million in 1976 and 28.4 million in 1977 to 30.9 million in 1978, and 55.2 million in 1980.[81]

1981–2000: two lines for two decades[edit]

On April 20, 1981, the Beijing Subway Company, then a subsidiary of the Beijing Public Transportation Company, was organized to take over subway operations.[83] On September 15, 1981, the initial line passed its final inspections, and was handed over to the Beijing Subway Company, ending a decade of trial operations.[83] It had 19 stations and ran 27.6 kilometres (17.1 miles) from Fushouling in the Western Hills to the Beijing railway station.[83] Investment in the project totaled ¥706 million. Annual ridership rose from 64.7 million in 1981 and 72.5 million in 1982 to 82 million in 1983.[83]

Paper tickets for Lines 1 & 2

On September 20, 1984, a second line was opened to the public.[83] This horseshoe-shaped line was created from the eastern half of the initial line and corresponds to the southern half of the present-day Line 2.[83] It ran 16.1 km (10.0 mi) from Fuxingmen to Jianguomen with 16 stations.[83] Ridership reached 105 million in 1985.[83]

Entrance to the Wangfujing Station on Line 1. The Wangfujing station opened in 1999 as part of Line 1's eastward extension from Fuxingmen.

On December 28, 1987, the two existing lines were reconfigured into Lines 1, which ran from Pingguoyuan to Fuxingmen and Line 2, in its current loop, tracing the Ming city wall.[83] Fares doubled to ¥0.20 for single-line rides and ¥0.30 for rides with transfers.[83] Ridership reached 307 million in 1988.[83] The subway was closed from June 3–4, 1989 during the suppression of the Tiananmen Square demonstrations. In 1990, the subway carried more than one million riders per day for the first time, as total ridership reached 381 million.[83] After a fare hike to ¥0.50 in 1991, annual ridership declined slightly to 371 million.

On January 26, 1991, planning began on the eastward extension of Line 1 under Chang'an Avenue from Fuxingmen.[84] The project was funded by a 19.2 billion yen low-interest development assistance loan from Japan.[84] Construction began on the eastern extension on June 24, 1992, and the Xidan station opened on December 12, 1992.[84] The remaining extension to Sihuidong was completed on September 28, 1999.[85] National leaders Wen Jiabao, Jia Qinglin, Yu Zhengsheng and mayor Liu Qi were on hand to mark the occasion.[85] The full-length of Line 1 became operational on June 28, 2000.[86]

Despite little track expansion in the early 1990s, ridership grew rapidly to reach a record high of 558 million in 1995, but fell to 444 million the next year when fares rose from ¥0.50 to ¥2.00. After fares rose again to ¥3.00 in 2000, annual ridership fell to 434 million from 481 million in 1999.[86]

2001–2008: planning for the Olympics[edit]

In the summer of 2001, the city won the bid to host the 2008 Summer Olympics and accelerated plans to expand the subway. From 2002 to 2008, the city planned to invest ¥63.8 billion (US$7.69 billion) in subway projects and build an ambitious "three ring, four horizontal, five vertical and seven radial" subway network.[87] Work on Line 5 had already begun on September 25, 2000.[88] Land clearing for Lines 4 and 10 began in November 2003 and construction commenced by the end of the year.[89] Most new subway construction projects were funded by loans from the Big Four state banks. Line 4 was funded by the Beijing MTR Corporation, a joint-venture with the Hong Kong MTR.[90] To achieve plans for 19 lines and 561 km (349 mi) by 2015, the city planned to invest a total of ¥200 billion ($29.2 billion).[91]

The next additions to the subway were surface commuter lines that linked to the north and east of the city. Line 13, a half loop that links the northern suburbs, first opened on the western half from Huilongguan to Xizhimen on September 28, 2002 and the entire line became operational on January 28, 2003.[92] Batong line, built as an extension to Line 1 to Tongzhou District, was opened as a separate line on December 27, 2003.[93] Work on these two lines had begun respectively in December 1999 and 2000.[94] Ridership hit 607 million in 2004.

Line 5 came into operation on October 7, 2007. It was the city's first north–south line, extending from Songjiazhuang in the south to Tiantongyuan in the north. On the same day, subway fares were reduced from between ¥3 and ¥7 per trip, depending on the line and number of transfers, to a single flat fare of ¥2 with unlimited transfers. The lower fare policy caused the Beijing Subway to run a deficit of ¥600 million in 2007, which was expected to widen to ¥1 billion in 2008.[91] The Beijing municipal government covered these deficits to encourage mass transit use, and reduce traffic congestion and air pollution. On a total of 655 million rides delivered in 2007, the government's subsidy averaged ¥0.92 per ride.[95]

As part of the urban re-development for the 2008 Olympics, the subway system was significantly expanded.[96]: 137 In the summer of 2008, in anticipation of the Summer Olympic Games, three new lines—Line 10 (Phase 1), Line 8 (Phase 1) and the Capital Airport Express—opened on July 19.[97] The use of paper tickets, hand checked by clerks for 38 years, was discontinued and replaced by electronic tickets that are scanned by automatic fare collection machines upon entry and exit of the subway. Stations are outfitted with touch screen vending machines that sell single-ride tickets and multiple-ride Yikatong fare cards. The subway operated throughout the night from Aug. 8-9, 2008 to accommodate the Opening Ceremonies of the Olympic Games, and is extending evening operations of all lines by one to three hours (to 1-2 a.m.) through the duration of the Games.[98] The subway set a daily ridership record of 4.92 million on August 22, 2008, the day of the Games' closing ceremony.[99] In 2008, total ridership rose by 75% to 1.2 billion.[100]

2008–present: rapid expansion[edit]

After the Chinese government announced a ¥4 trillion economic stimulus package in November 2008, the Beijing urban planning commission further expedited subway building plans, especially for elevated lines to suburban districts that are cheaper to build. In December 2008, the commission moved completion dates of the Yizhuang and Daxing Lines to 2010 from 2012, finalized the route of the Fangshan Line, and unveiled the Changping and Xijiao Lines.[101]

Line 4 started operation on September 28, 2009, bringing subway service to much of western Beijing.[102] It is managed by the MTR Corporation through a joint venture with the city. In 2009, the subway delivered 1.457 billion rides,[103] 19.24% of mass transit trips in Beijing.[104]

In 2010, Beijing's worsening traffic congestion prompted city planners to move the construction of several lines from the 13th Five Year Plan to the 12th Five Year Plan. This meant Lines 8 (Phase III), Line 3, Line 12, Line 16, the Yanfang line, as well as additional lines to Changping District and Tiantongyuan were to begin construction before 2015.[105] Previously, Lines 3, 12 and 16 were being planned for the more distant future.[106][107] On December 30, 2010, five suburban lines: Lines 15 (Phase I from Wangjingxi to Houshayu except Wangjing East station), Changping, Fangshan (except Guogongzhuang station), Yizhuang (except Yizhuang railway station), and Daxing, commenced operation.[108] The addition of 108 km (67 mi) of track, a nearly 50% increase, made the subway the fourth longest metro in the world. One year later, on December 31, 2011, the subway surpassed the New York City Subway to become the third longest metro in revenue track length with the extension of Line 8 north from the Forest Park South Gate to Huilongguan Dongdajie, the opening of Line 9 in southwest Beijing from Beijing West railway station to Guogongzhuang (except Fengtai Dongdajie, which opened on October 12, 2012), the extension of the Fangshan Line to Guogongzhuang, and the extension of Line 15 from Houshayu to Fengbo in central Shunyi.[109] In the same year, the Beijing government unveiled an ambitious expansion plan envisioning the subway network to reach a track density of 0.51 km per km2 (0.82 mi per sq. mi.) inside the Fifth Ring Road where residents would on average have to walk 1 km (0.62 mi) to the nearest subway station.[110] Ridership reached 2.18 billion in 2011.

Beijing Television interviewed subway officials on December 30, 2012, when over 40 new stations were opened, and the subway temporarily surpassed the Shanghai Metro to be the longest in the world, only to be surpassed by Shanghai again a year later.

In February 2012, the city government confirmed that Lines Line 3, Line 12, Line 17, and Line 19 were under planning as part of Phase II expansion.[111] Retroactively implying that the original three ring, four horizontal, five vertical and seven radial plan was part of Phase I expansion. Line 17 was planned to run north–south, parallel and to the east of Line 5, from Future Science Park North to Yizhuang Zhanqianqu South.[112] Line 19 was planned to run north–south, from Mudanyuan to Xin'gong.[113]

Beijing Subway network during the 2008 Summer and 2022 Winter Olympic Games

On December 30, 2012, Line 6 (Phase I from Haidian Wuluju to Caofang), the extension of Line 8 from Beitucheng south to Gulou Dajie (except Andeli Beijie), the remainder of Line 9 (except Military Museum station) and the remainder of the Line 10 loop (except the Xiju-Shoujingmao section and Jiaomen East station) entered service. The addition of 69.8 km (43 mi) of track increased the network length to 442 km (275 mi) and allowed the subway to overtake the Shanghai Metro, for several months, as the world's longest metro.[114] The subway delivered 2.46 billion rides in 2012.[115]

On May 5, 2013, the Line 10 loop was completed with the opening of the Xiju-Shoujingmao section and the Jiaomen East Station.[116] The 57 km (35 mi) loop line became the longest underground subway loop in the world.[116] On the same day, the first section of Line 14 from Zhangguozhuang to Xiju also entered operation, ahead of the opening of the Ninth China International Garden Expo in Fengtai District.[116] The subway's total length reached 456 km (283 mi).[116] On December 28, 2013, two sections were added to Line 8, which extended the line north to Zhuxinzhuang and south to Nanluoguxiang.[117] In 2013, the subway delivered 3.209 billion rides, an increase of 30% from the year before.[118]

On December 28, 2014, the subway network expanded by 62.2 km (38.6 mi) to 18 lines and 527 km (327 mi) with the opening of Line 7, the eastern extension of line 6 (from Caofang to Lucheng), the eastern section of line 14 (from Jintai Lu to Shangezhuang), and the western extension of line 15 (from Wangjingxi to Qinghua Donglu Xikou).[119][120] At the same time, the ¥2 flat-rate fare was replaced with a variable-rate fare (a minimum of ¥3), to cover operation costs.[121] In 2014, the subway delivered 3.387 billion rides, an increase of 5.68% from the year before.[122] Average daily and weekday ridership also set new highs of 9.2786 million and 10.0876 million, respectively.[123]

From 2007 to 2014, the cost of subway construction in Beijing rose sharply from ¥0.571 billion per km to ¥1.007 billion per km.[124][125] The cost includes land acquisition, compensation to relocate residents and firms, actual construction costs and equipment purchase. In 2014, city budgeted ¥15.5 billion for subway construction, and the remainder of subway building costs was financed by the Beijing Infrastructure Investment Co. LTD, a city-owned investment firm.[124]

In 2014, Beijing planning authorities assessed mass transit monorail lines for areas of the city in which subway construction or operation is difficult.[126] Straddle beam monorail trains have lower transport capacity and operating speed (60 km/h or 37 mph) than conventional subways, but are quieter to operate, have smaller turning radius and better climbing capability, and cost only one-third to one-half of subways to build.[126][127] According to the initial environmental assessment report by the Chinese Academy of Rail Sciences, the Yuquanlu Line was planned to have 21 stations over 25 km (16 mi) in western Beijing.[128] The line was to begin construction in 2014 and would take two years to complete.[126] The Dongsihuan Line (named for the Eastern Fourth Ring Road it was to follow) was planned to have 21 stations over 33.7 km (20.9 mi).[129][127]

In early 2015, plans for both monorail lines were shelved indefinitely, due to low capacity and resident opposition.[130] The Yuquanlu Line remains on the city's future transportation plan, and it will be built as a conventional underground subway line. The Dongsihuan Line was replaced by the East extension of Line 7.[131]

On December 26, 2015, the subway network expanded to 554 km (344 mi) with the opening of the section of Line 14 from Beijing South railway station to Jintai Lu (11 stations; 16.6 km (10.3 mi)), Phase II of the Changping line from Nanshao to Changping Xishankou (5 stations; 10.6 km or 6.6 mi), Andelibeijie station on Line 8, and Datunlu East station on Line 15.[132] Ridership in 2015 fell by 4% to 3.25 billion due to a fare increase from a flat fare back to a distance based fare.[122]

With the near completion of the three ring, four horizontal, five vertical and seven radial subway network, work began on Phase II expansion projects. These new extensions and lines will be operational in 2019~2021.[133] On December 9, 2016, construction started on 126 km (78 mi) of new line with the southern extension of Batong Line, the southern extension of Changping line, the Pinggu line, phase one of the New Airport line, and Line 3 Phase I breaking ground.[134] The northern section of Line 16 opened on December 31, 2016. Ridership reached a new high of 3.66 billion.[135] On December 30, 2017, a one-station extension of Fangshan Line (Suzhuang – Yancun East), Yanfang line (Yancun Dong - Yanshan), Xijiao line (Bagou - Fragrant Hills) and S1 line (Shichang – Jin'anqiao) were opened. On December 30, 2018, the western extension of Line 6 (Jin'anqiao – Haidian Wuluju), the South section of Line 8 (Zhushikou – Yinghai), a one-station extension on Line 8 North section (Nanluoguxiang – National Art Museum), a one-station extension on Yizhuang line (Ciqu – Yizhuang Railway Station) were opened. On September 26, 2019, the Daxing Airport Express (Phase 1) (Caoqiao - Daxing Airport)was opened.[136] On December 28, 2019, the eastern extension of Line 7 (Jiaohuachang-Huazhuang) and the southern extension of Batong line (Tuqiao-Huazhuang) were opened.[137]

Recording of announcement on Line 4 train requiring all passengers to wear masks on March 23, 2020.

On January 24, 2020, the day after a lockdown was declared in the city of Wuhan to contain the outbreak of COVID-19 in China, the Beijing Subway began testing body temperature of passengers at the 55 subway stations including the three main railway stations and capital Airport.[138] Temperature checks expanded to all subway stations by January 27.[139]

On April 4, 2020, at 10:00am, Beijing Subway trains joined in China's national mourning of lives lost in the COVID-19 pandemic, by stopping for three minutes and sounding their horns three times, as conductors and passengers stood in silence.[140] To control the spread of COVID-19, certain Line 6 trains were outfitted with smart surveillance cameras that can detect passengers not wearing masks.[141]

New wayfinding to Line 13

In May 2020, the Beijing Subway began to pilot a new style of wayfinding on Line 13 and Airport Express. However, since then the new designs were not rolled out to other lines or even new lines that opened afterward.[142]

On December 31, 2020, the middle section of Line 16 (Xi Yuan-Ganjia Kou), the northern section of the Fangshan line (Guogongzhuang-Dongguantou Nan(S)), and the Yizhuang T1 line tram were opened.[143]

On August 26, 2021, Line 7 and Batong line extended to Universal Resort station.[144] On August 29, 2021, through operation of Line 1 and Batong line started.[26] On December 31, 2021, the initial sections of Line 11(Jin'anqiao - Shougang Park), Line 17 (Shilihe - Jiahuihu), Line 19(Mudanyuan - Xingong); extensions of Capital Airport Express(Dongzhimen - Beixinqiao), Changping line(Xierqi - Qinghe Railway Station), Line S1(Jin'anqiao - Pingguoyuan), Line 16(Ganjiakou - Yuyantan Park East Gate); and the central sections of Line 8(Zhushikou - National Art Museum) and Line 14(Beijing South Railway Station - Xiju) were opened.[145] With the completion of the central sections of Line 8 and 14 along with the final section of Line S1 marks the completion of the three ring, four horizontal, five vertical and seven radial subway network plan (retroactively named Phase I expansion).

On July 30, 2022, stations Beitaipngzhuang, Ping'anli, Taipingqiao, Jingfengmen of Line 19 were opened.[146] On December 31, 2022, the extension of Line 16 (Yuyantan Park East Gate - Yushuzhuang) was opened.[147]

On January 18, 2023, in the morning and evening peak hours of the workday, the cross-line operation of Fangshan Line and Line 9 began.[148] On February 4, 2023, the extension of Changping Line (Qinghe Railway Station - Xitucheng) was opened.[149]

Ridership[edit]

Average Daily Ridership
YearRiders±%
197122,685—    
197241,066+81.0%
197331,151−24.1%
197431,014−0.4%
197553,233+71.6%
197660,792+14.2%
197777,699+27.8%
197884,740+9.1%
1979131,096+54.7%
1980150,847+15.1%
1981177,151+17.4%
1982198,712+12.2%
1983224,630+13.0%
YearRiders±%
1984281,530+25.3%
1985382,548+35.9%
1986432,301+13.0%
1987526,767+21.9%
1988838,743+59.2%
1989850,740+1.4%
19901,045,973+22.9%
19911,016,082−2.9%
19921,169,699+15.1%
19931,345,479+15.0%
19941,460,164+8.5%
19951,528,822+4.7%
19961,213,497−20.6%
YearRiders±%
19971,219,342+0.5%
19981,265,753+3.8%
19991,317,808+4.1%
20001,185,792−10.0%
20011,284,932+8.4%
20021,312,329+2.1%
20031,293,151−1.5%
20041,658,470+28.3%
20051,857,534+12.0%
20062,106,575+13.4%
20071,794,521−14.8%
20083,278,689+82.7%
20093,991,781+21.7%
YearRiders±%
20105,041,096+26.3%
20115,972,603+18.5%
20126,721,311+12.5%
20138,791,781+30.8%
20149,278,600+5.5%
20158,904,109−4.0%
20169,998,000+12.3%
201710,350,411+3.5%
201810,543,608+1.9%
201910,821,500+2.6%
20206,273,973−42.0%
20218,383,500+33.6%
Source: 北京ぺきん大事だいじ记回顾 1965-2006 • 北京ぺきん2010ねん暨"じゅういち"国民こくみん经济社会しゃかい发展统计こう • 北京ぺきん2011ねん国民こくみん经济社会しゃかい发展统计こう • 北京ぺきん2012ねん国民こくみん经济社会しゃかい发展统计こう • 北京ぺきん2013ねん国民こくみん经济社会しゃかい发展统计こう • [150] • 北京ぺきん2015ねん暨"じゅう"时期国民こくみん经济社会しゃかい发展统计こう • [135] • [151] • [2]

Facilities[edit]

Accessibility[edit]

Left: Space for wheelchair inside Daxing Airport Express.
Right: A foldable wheelchair lift inside Exit A of the Dongdan station. Most stations built after 2007 have elevators. Older stations have been outfitted with wheelchair lifts. Tactile paving is found throughout stations.
Wheelchair space in Beijing Subway

Each station is equipped with ramps, lifts, or elevators to facilitate wheelchair access.[152][153] Newer model train cars now provide space to accommodate wheelchairs.[154] Automated audio announcements for incoming trains are available in all lines. On all lines, station names are announced in Mandarin Chinese and English. Under subway regulations, riders with mobility limitations may obtain assistance from subway staff to enter and exit stations and trains, and visually impaired riders may bring assistance devices and guide dogs into the subway.[155]

Cellular network coverage[edit]

Mobile phones can currently be used throughout the network. In 2014, Beijing Subway started upgrading cellular networks in the Beijing subway to 4G.[156] In 2016, the entire subway network has 4G coverage.[157] Since 2019, 5G coverage is being rolled out across the network.[158][159]

Commercial facilities[edit]

In the 1990s a number of fast food and convenience stores operated in the Beijing Subway.[160] In 2002, fourteen Wumart convenience stores opened in various Line 2 stations.[161]

After witnessing the Daegu subway fire in February 2003, the Beijing Subway gradually removed the 80 newsstands and fast food restaurants across 39 stations in Line 1 and Line 2.[162] The popular underground mall at Xidan station was closed. This is in contrast other systems in China which added more station commerce as they started to rapidly expand their networks.[162] Since the implementation of this policy new lines did not have any station commerce upon opening.

Passengers consistently complained that the lack of station commerce in the Beijing Subway is inconvenient. In the early 2010s, Beijing Subway started reversing some of these policies. Vending machines selling drinks and snacks has gradually introduced inside stations since 2013. Later machines with of common items such as flowers, earphones, masks, etc. were also introduced.[160] In 2013, China Resources Vanguard and FamilyMart expressed interest in opening convenience stores in the Beijing Subway but this never materialized.[163]

On July 25, 2021, Lawson opened a store in the paid area of Hepingli Beijie Station.

The survey report on passenger satisfaction in subway services since 2018 shows that more than 70% of passengers want convenience stores in subway stations, especially for various hot and cold drinks, ready-to-eat food, and bento meals.[160] In December 2020, "the deployment of 130 convenient service facilities at subway stations" was listed as a key project for the Beijing municipal government.[164] On 25 July 2021, Beijing Subway selected three stations, Hepingli Beijie station of Line 5, Qingnian Lu station of Line 6, and Caishikou station of Line 7, to carry out a pilot program of opening convenience stores.[165] Since December 2021, a rapid rollout of station commerce began on a large scale across the network with a variety of commercial establishments such as bookstores, pharmacies, flower shops and specialty vendors being constructed inside stations.[166]

Information hotline and app[edit]

The Beijing Subway telephone hotline was initiated on the eve of the 2008 Summer Olympic Games to provide traveler information, receive complaints and suggestions, and file lost and found reports.[167] The hotline combined the nine public service telephones of various subway departments.[168] On December 29, 2013, the hotline number was switched from (010)-6834-5678 to (010)-96165 for abbreviated dialing.[169] In December 2014, the hotline began offering fare information, as the subway switched to distance-based fare.[10] The hotline has staffed service from 5 am to midnight and has automated service during unstaffed hours.[167]

The Beijing Subway has an official mobile application and a number of third-party apps.

English station names[edit]

According to the related rules released in 2006, all the place names, common names and proper names of subway stations and bus stops should use uppercase Hanyu Pinyin. For example, Nanlishi Lu Station should be written as NANLISHILU Station. However, names of venues can use English translation, such as Military Museum.

According to the translation standard released in December 2017, station names of rail transit and public transport have to follow the laws.

Since December 2018, Beijing Subway has changed the format of names of the new subway stations every year. On the subway map of December 2018, the station names used Roman script, and it gave consideration to English writing habit and pronunciation. The format changed to verbatim in December 2019, where the positions (East, South, West and North) were written in Hanyu Pinyin and an English abbreviation was added to them.

Station sign at Xinshougang (Shougang Park) station. (January 2022)

Since 31 December 2021, Beijing Subway has started using new station name format. The Pinyin "Zhan" is used instead of English word "Station" on the light box at the subway entrance. This caused a strong disagreement.[170] Citizens criticized it, making comments like "Chinese do not need to read and foreigners cannot read it". Some of the landmark named stations uses Chinese name, Hanyu Pinyin and English translation. Station names ending with positions no longer add English abbreviation. Some of the stations that used English translation names (such as Shahe Univ. Park, Life Science Park and Liangxiang Univ. Town) changed to Hanyu Pinyin only (The new station names are Shahe Gaojiaoyuan, Shengming Kexueyuan and Liangxiang Daxuecheng).

System upgrades[edit]

Capacity[edit]

A crowded transfer corridor on Line 10.

With new lines drawing more riders to the network, the subway has experienced severe overcrowding, especially during the rush hour.[171] Since 2015, significant sections of Lines 1, 4 – Daxing, 5, 10,[172] 13, Batong and Changping are officially over capacity during rush hour.[173][174] By 2019, Lines 1, 2, 4, 5, 6 and 10 all have daily weekday ridership's of over 1 million passengers a day each.[175] In short term response, the subway upgraded electrical, signal and yard equipment to increase the frequency of trains to add additional capacity. Peak headways have been reduced to 1 min. 43 sec. on Line 4;[176] 1 min. 45 sec. on Lines 1/Batong,[177] 5,[178] 9,[177] and 10;[179] 2 min. on Lines 2,[180] 6,[178] 13[178] and Changping;[181] 2 min. and 35 sec. on Line 15;[178][181] 3 min. 30 sec. on Line 8;[182] and 15 min. on the Airport Express.[183] The Beijing Subway is investigating the feasibility of reducing headways of Line 10 down to 1 min 40 seconds.[184]

Lines 13 and Batong have converted 4-car to 6-car trains.[185][186] Lines 6[187] and 7 have longer platforms that can accommodate 8-car type B trains,[188] while lines 14, 16, 17 and 19 use higher capacity wide-body type A trains (all mentioned except Line 14 use eight-car trains).[citation needed] New lines that cross the city center such as Line 3 and Line 12, now under construction, will also adopt high capacity 8-car type A trains with a 70 percent increase in capacity over older lines using 6 car type B.[187][189] When completed these lines are expected to greatly relieve overcrowding in the existing network.

The articulated cars of Line 5 trains have greater carrying capacity.

Despite these efforts, during the morning rush hour, conductors at line terminals and other busy stations must routinely restrict the number of passengers who can board each train to prevent the train from becoming too crowded for passengers waiting at other stations down the line.[190] Some of these stations have built queuing lines outside the stations to manage the flow of waiting passengers.[191] As of August 31, 2011, 25 stations mainly on Lines 1, 5, 13, and Batong have imposed such restrictions.[192] By January 7, 2013, 41 stations on Lines 1, 2, 5, 13, Batong, and Changping had instituted passenger flow restrictions during the morning rush hour.[193] The number of stations with passenger flow restrictions reached 110 in January 2019, affecting all lines except Lines 15, 16, Fangshan, Yanfang and S1.[194] Lines 4, 5, 10 and 13 strategically run several empty train runs during rush hour bound for specific stations help clear busy station queues.[178] Counter peak flow express trains started operating on Line 15, Changping and Batong to minimize line runtimes and allow the existing fleet size to serve more passengers during peak periods.[178] Additionally, investigations are being carried out on Line 15 and Yizhuang for upgrading to 120 km/h operations.[195]

Transfers[edit]

At Wangjing West, an interchange station for Lines 13 and 15, passengers transferring between the two lines must pass through a lengthy transfer corridor that includes a pedestrian footbridge.

Interchange stations that permit transfers across two or more subway lines receive heavy traffic passenger flow. The older interchange stations are known for lengthy transfer corridors and slow transfers during peak hours. The average transfer distance at older interchange stations is 128 m (420 ft)[196] The transfer between Lines 2 and 13 at Xizhimen once required 15 minutes to complete during rush hours.[197] In 2011, this station was rebuilt to reduce the transfer distance to about 170 m (560 ft) long.[198][199] There are plans to rebuild other interchange stations such as Dongzhimen.[196]

In newer interchange stations, which are designed to permit more efficient transfers, the average transfer distance is 63 m (207 ft).[196] Many of the newer interchange stations including Guogongzhuang (Lines 9 and Fangshan), Nanluoguxiang (Lines 8 and 6), Zhuxinzhuang (Changping and Line 8), Beijing West railway station (Lines 9 and 7), National Library (Lines 9 and 4), Yancun East (Fangshan Line and Yanfang Line) feature cross platform transfers.[200] Nevertheless, longer transfer corridors must still be used when the alignment of the lines do not permit cross-platform transfer.[201] The transfer corridors between Lines 1 and 9 at the Military Museum, which opened on December 23, 2013, are 160 m (520 ft) in one direction and just under 300 m (980 ft) in the other.[202]

Safety[edit]

Security check[edit]

Since the 2008 Olympics, security checks of riders and bags have become mandatory on the Beijing Subway.

To ensure public safety during the 2008 Summer Olympic and Paralympic Games, the subway initiated a three-month heightened security program from June 29 to September 20, 2008. Riders were subject to searches of their persons and belongings at all stations by security inspectors using metal detectors, X-ray machines and sniffer dogs. Items banned from public transportation such as "guns, ammunition, knives, explosives, flammable and radioactive materials, and toxic chemicals" were subject to confiscation.[203] The security program was reinstituted during the 2009 New Year Holiday[204] and has since been made permanent through regulations enacted in February 2009.[205]

Accidents and incidents[edit]

The subway was plagued by numerous accidents in its early years, including a fire in 1969 that killed six people and injured over 200.[206] But its operations have improved dramatically and there have been few reported accidents in recent years. Most of the reported fatalities on the subway are the result of suicides.[207] Authorities have responded by installing doors on platforms of newer lines.

  • On October 8, 2003, the collapse of steel beams at the construction site of Line 5's Chongwenmen station killed three workers and injured one.[208]
  • On March 29, 2007, the construction site at the Suzhoujie station on Line 10 collapsed, burying six workers.
  • On June 6, 2008, prior to the opening of Line 10, a worker was crushed to death inside an escalator in Zhichunlu station when an intern turned on the moving staircase.[209]
  • On July 14, 2010, two workers were killed and eight were injured at the construction site of Line 15's Shunyi station when the steel support structure collapsed on them.[210]
  • On September 17, 2010, Line 9 tunnels under construction beneath Yuyuantan Lake were flooded, killing one worker.[211] A city official who oversaw waterworks contracts at the site was convicted of corruption and given a death sentence with reprieve.[211]
  • On June 1, 2011, one worker was killed when a section of Line 6 under construction in Xicheng District near Ping'anli collapsed.[212]
  • On July 5, 2011, an escalator collapsed at Beijing Zoo Station, killing one 13-year-old boy and injuring 28.[213]
  • On July 19, 2012, a man was fatally shot at Hujialou station by a sniper from the Beijing Special Weapons and Tactics Unit after taking a subway worker hostage.[214]
  • On May 4, 2013, a train derailed when it overran a section of track on Line 4. The section was not open to the public and was undergoing testing. There were no injuries.[215]
  • On November 6, 2014, a woman was killed when she tried to board the train at Huixinxijie Nankou station on Beijing Subway's Line 5. She became trapped between the train door and the platform edge door and was crushed to death by the departing train. The accident happened on the second day of APEC China 2014 meetings in the city during which the municipal government has banned cars from the roads on alternate days to ease congestion and reduce pollution during the summit – measures which the capital's transport authorities have estimated would lead to an extra one million passengers on the subway every day.[216]
  • On March 26, 2015, a Yizhuang line train was testing when it derailed around Taihu Depot [zh]. No passengers were on board and the driver faced leg injuries.[217][218][219]
  • On January 1, 2018, a Xijiao line train derailed around Fragrant Hills station. There were no injuries.[220] Fragrant Hills station was temporarily closed until 1 March 2018.[221]
  • On December 14, 2023, two trains on the Changping line collided between Xi'erqi station and Life Science Park station, causing one of the carriages to break apart and injuring over 500 passengers on board.[222][223][224]

Subway culture[edit]

[edit]

The logo of the Beijing Subway contains the subway's abbreviation, B.G.D.

The subway's logo, a capital letter "G" encircling a capital letter "D" with the letter "B" silhouetted inside the letter D, was designed by Zhang Lide, a subway employee, and officially designated in April 1984.[225] The letters B, G, and D form the pinyin abbreviation for "北京ぺきん高速こうそく电车" (pinyin: Běijīng gāosù diànchē; lit. 'Beijing high-speed electric carriage').

Subway Culture Park[edit]

A decommissioned Line 1 car in the Beijing Subway Culture Park

The Beijing Subway Culture Park, located near Xihongmen in Daxing District, opened in 2010 to commemorate the 40-year history of the Beijing Subway.[226] The 19 ha (47 acres) park was built using dirt and debris removed from the construction of the Daxing line and contains old rolling stock, sculpture, and informational displays.[226] Admission to the park is free.

Beijing Suburban Railway[edit]

The Beijing Suburban Railway, a suburban commuter train service, is managed separately from the Beijing Subway. The two systems, although complementary, are not related to each other operationally. Beijing Suburban Railway is operated by the China Railway Beijing Group.

There are 4 suburban railway lines currently in operation: Line S2, Sub-Central line, Huairou–Miyun line and Tongmi line.

Network Map[edit]

Map


See also[edit]

Diagram showing distinct line labels for the Daxing Line and Line 4 with through service.

Notes[edit]

  1. ^ Through operation of Line 1 and Batong line started on August 29, 2021.[26]
  2. ^ The construnction finished in 1969 but was not open to public until 1971
  3. ^ a b c d e f g The following stations haven't been opened and not included in the station count: Pingguoyuan on Line 1; Tongyunmen on Line 6; Dahongmen on Line 8; Taoranqiao, Hongmiao and Gaojiayuan on Line 14; Lize Shangwuqu on Line 16; Wangjingxi on Line 17 North section; Zhufangbei and Jimenqiao on Changping line
  4. ^ a b With the opening of the Daxing Line on December 30, 2010 the Beijing MTR Corporation operates service on Lines 4 and Daxing as follows:[27][28]
    ** A service that covers both lines, from Anheqiaobei, the northern terminus of Line 4, to Tiangongyuan, the southern terminus of the Daxing Line.
    ** A service that covers Line 4 plus one stop on the Daxing Line, from Anheqiaobei to Xingong, the northernmost stop on the Daxing Line. Travelers wishing to proceed further south on the Daxing Line have to switch to a south-bound full-route train.
  5. ^ There is no subway stop at the 12th gate, Deshengmen, between Jishuitan and Gulou Dajie.
  6. ^ From August 12, 1973, to June 30, 1974, and in January 1975, the subway was closed due to defense mobilization.[82] It was closed from September 13 to November 6, 1971, in the aftermath of the Lin Biao incident and on September 18, 1976, after the death of Chairman Mao.[82]

References[edit]

  1. ^ a b c d e f g "铁19ごう线剩あまり4站明试运营!しん宫至牡丹ぼたん园只需半しょう时". July 29, 2022. Archived from the original on July 29, 2022. いたり此,本市もといち城市じょうし轨道交通こうつう运营总里程りてい783公里くり、车站463
  2. ^ a b c d e "2018ねん统计报告". Archived from the original on April 4, 2020. Retrieved April 9, 2019.
  3. ^ a b "北京ぺきん轨道交通こうつうぜんみち网日きゃく运量さい创新だか ちょう1375まんにん". July 13, 2019.
  4. ^ "北京ぺきん2019ねん国民こくみん经济社会しゃかい发展统计こう报".
  5. ^ 未来みらいねん再建さいけん12じょう. September 29, 2015. Archived from the original on March 12, 2016. Retrieved October 2, 2015.
  6. ^ Li Song (まつ). "Beijing's subway is going full bore - China - Chinadaily.com.cn". www.chinadaily.com.cn. Retrieved January 19, 2017.
  7. ^ 北京ぺきん2020ねん轨道交通こうつう线路预计はた达1000公里くり左右さゆう. www.chinanews.com.cn (in Simplified Chinese). December 30, 2010.
  8. ^ Xin, Dingding (July 31, 2012). "Experts fear subway costs could go off the rails". China Daily.
  9. ^ a b c d e f Beijing to Increase Public Transportation Fare Prices Next, CRI 2014-11-27
  10. ^ a b 北京ぺきん铁票价今おこりじょう网查询 きゃく户端15にちおこり (in Simplified Chinese). Xinhua News. December 10, 2014. Archived from the original on December 29, 2014.
  11. ^ a b "北京大ぺきんだい兴国际机场线ひょう价方あん正式せいしき启用 最低さいてい10もと". September 15, 2019. Archived from the original on October 11, 2019.
  12. ^ Lin Ye (林野りんや) (December 17, 2014). 北京ぺきん铁各站公布こうふ最新さいしん里程りていひょう价儿わらわめんひょうだかひさげだか (in Simplified Chinese). The Beijing News.
  13. ^ a b 北京ぺきん铁告别 '两元时代' 车票设四しょう时时げん [Beijing Subway says farewell to the "2 yuan era"; tickets now set to a four-hour limit] (in Simplified Chinese). December 28, 2014.
  14. ^ "Beijing airport express rail on trial run," China Daily July 15, 2008
  15. ^ 杭州こうしゅう铁拟じょうひょう价 "贵"为全国ぜんこくまえさん 市民しみん喊吃けし. Xinhuanet Zhejiang (in Simplified Chinese). Qianjiang Evening News. 20 July 2012. Archived from the original on 23 July 2012. Retrieved 1 May 2013.
  16. ^ CityWeekend: The Official Beijingology Subway AFC Cheat Sheet (Part 3) Archived December 6, 2008, at the Wayback Machine/
  17. ^ The AFC machines are supplied by the following companies: Thales (Lines 1, 2 and Batong), Samsung SDS (Lines 4, 8 and 10), Founder, OMRON (Line 5), Nippon Signal (Lines 13 & Airport Express)
  18. ^ "Beijing MTR website". Mtr.bj.cn. Archived from the original on September 11, 2010. Retrieved January 5, 2011.
  19. ^ 北京ぺきん28にちおこりこう上下じょうげ车均すりあまり不足ふそく3げんきんすわ (in Simplified Chinese). December 20, 2014. Archived from the original on December 29, 2014. Retrieved December 29, 2014.
  20. ^ 北京ぺきん铁票くび设4しょう时时げん 中途ちゅうと换卡はた遭10ばい罚款 (in Simplified Chinese). December 4, 2014.
  21. ^ 北京ぺきん铁调价后"だいこう" こう交增车超"APEC标准 (in Simplified Chinese). 29 December 2014. Archived from the original on 29 December 2014. Retrieved 29 December 2014.
  22. ^ Dong, Liu. "Beijing subway jumps on board mobile payment system". China Daily. Retrieved May 31, 2018.
  23. ^ Liu, Charles (March 27, 2018). "Pay Beijing Metro Fares With Mobile Phone QR Codes Beginning in May". The Beijinger. Retrieved May 31, 2018.
  24. ^ "输入份信いき耗时 自助じじょ购票つくえはいだい铁买ひょう份验证环节请あらため进_北京ぺきん报网". news.bjd.com.cn. Retrieved February 21, 2023.
  25. ^ See "History" section of this article.
  26. ^ a b "四惠四惠东站无须换乘了!北京ぺきん铁1ごう线、八通线本周日跨线运营". Beijing Daily. August 25, 2021. Archived from the original on August 25, 2021. Retrieved August 25, 2021.
  27. ^ 北京ぺきんきょうこう铁有げん公司こうし. Mtr.bj.cn. December 29, 2010. Archived from the original on January 1, 2011. Retrieved January 5, 2011.
  28. ^ "Beijing MTR Corporation Limited". Mtr.bj.cn. September 27, 2010. Archived from the original on October 9, 2011. Retrieved January 5, 2011.
  29. ^ "北京ぺきん:四年内副中心陆续开4じょう铁-しん华网". Archived from the original on December 29, 2018.
  30. ^ a b "三段地铁线路即将开通". December 28, 2023. Archived from the original on December 29, 2023.
  31. ^ a b "北京ぺきん今日きょう开通9じょう铁线(だん) 3じょうぬし线贯どおり南北なんぼく". December 31, 2021.
  32. ^ "北京ぺきんくびじょうちゅう低速ていそく磁浮交通こうつう线路S1线年底部ていぶぶん开通-しん华网". Archived from the original on December 29, 2018.
  33. ^ "北京ぺきんあさ阳区国民こくみん经济社会しゃかい发展だいじゅう四个五年规划和二〇三五年远景目标纲要". March 18, 2021. Archived from the original on March 20, 2021.
  34. ^ 北京ぺきん城市じょうし规划设计研究けんきゅういん 郑猛. "あさ北京ぺきんTODてき发展及几てん思考しこう". Archived from the original on January 21, 2021. Retrieved September 1, 2020.
  35. ^ a b c 国家こっか发展改革かいかく关于北京ぺきん城市じょうし轨道交通こうつうだい二期建设规划(2015~2021ねんてき批复. ちゅう人民じんみん共和きょうわこく国家こっか发展改革かいかく员会 [National Development and Reform Commission]. September 29, 2015. Retrieved October 2, 2015.
  36. ^ 国家こっか发展改革かいかく关于调整北京ぺきん城市じょうし轨道交通こうつうだい二期建设规划方案的批复. ちゅう人民じんみん共和きょうわこく国家こっか发展改革かいかく员会 [National Development and Reform Commission]. December 5, 2019. Archived from the original on December 20, 2019. Retrieved January 2, 2020.
  37. ^ "关于调整北京ぺきん城市じょうし轨道交通こうつうだい二期建设规划方案的批复(发改もと础〔2019〕1904ごう)_政府せいふしんいきこう开_せい务公开-国家こっか发展改革かいかく". zfxxgk.ndrc.gov.cn. Retrieved January 27, 2022.
  38. ^ "今年ことしいし景山かげやまはたけん设多じょう轨道交通こうつう,一号线福寿岭站预计年内竣工". January 5, 2023. Archived from the original on January 5, 2023.
  39. ^ "北京ぺきん重大じゅうだい项目けん设指挥办おおやけしつ". Archived from the original on February 17, 2019. Retrieved March 13, 2019.
  40. ^ "北京ぺきん铁3ごう线一期工程首站封顶". Xinhuanet. Archived from the original on December 17, 2020. Retrieved November 12, 2020.
  41. ^ "けん议加かい推进3,12,16,17ごう线进". November 16, 2021.
  42. ^ "请问北京ぺきん铁12ごう线何时开どおり". June 10, 2021.
  43. ^ "北京ぺきん铁平たに线城ふく中心ちゅうしん5车站明年みょうねん实现开工". December 15, 2020. Archived from the original on December 31, 2020. Retrieved December 15, 2020.
  44. ^ a b c "轨道交通こうつう13ごう线扩のうひさげます工程こうてい启动けん设2车站进场施工しこう". August 9, 2021. Archived from the original on October 23, 2021.
  45. ^ "北京ぺきん轨道交通こうつう13ごう线扩のうひさげます工程こうてい环境かげ响报つげ书" (PDF). October 21, 2021. Archived from the original (PDF) on October 23, 2021.
  46. ^ "北京ぺきん铁11ごう线西だんだい兴机场线きたのべ年内ねんない开工". September 25, 2019.
  47. ^ "6ごう线南のべだん启动けん设 计划于2025ねんそこたてしげるどおり车". August 31, 2022.
  48. ^ "北京ぺきん铁6ごう线みなみのべだん工程こうてい环境かげ响报つげ书(せいもとめ见稿).pdf" (PDF). Archived from the original (PDF) on May 31, 2022. Retrieved September 10, 2022.
  49. ^ a b "北京ぺきん铁28ごう线首站启动建设". July 27, 2021.
  50. ^ a b "铁28ごう线可ぎょうせい研究けんきゅう报告批复,纳入今年ことし北京ぺきん政府せいふ重点じゅうてん工程こうてい". September 10, 2020. Archived from the original on September 11, 2020. Retrieved November 16, 2021.
  51. ^ a b "けん1:北京ぺきん轨道交通こうつうだい三期建设规划(2022-2027ねん)环境かげ响报つげ书(せいもとめ见稿).pdf" (PDF). Archived (PDF) from the original on July 8, 2022. Retrieved July 8, 2022.
  52. ^ "公司こうし1965-1970ねん" (in Chinese). Archived from the original on February 6, 2010. Retrieved March 27, 2010.
  53. ^ a b "公司こうし1981-1990ねん" (in Chinese). Archived from the original on February 6, 2010. Retrieved March 27, 2010.
  54. ^ the Beijing Subway website [1] reported that the total 2015 passenger ridership on the 15 lines under its control was 2.832 billion. Total network ridership including the three Beijing MTR lines were not provided.
  55. ^ website of Beijing MTR Corporation Limited Archived 6 January 2016 at the Wayback Machine
  56. ^ "确定りょう北京ぺきん铁17ごう线,きょうこう公司こうし运营". December 30, 2019. Archived from the original on July 26, 2020. Retrieved December 31, 2019.
  57. ^ "Brief of BJMTR". Beijing MTR website. Archived from the original on January 6, 2016. Retrieved July 6, 2019.
  58. ^ "北京ぺきん轨道交通こうつう运营管理かんり有限ゆうげん公司こうし". Retrieved August 12, 2019.
  59. ^ "だい兴机场线ぶん创产ひんくびあきらしょう2019北京ぺきんじょう轨展". August 1, 2019.
  60. ^ "讯!北京ぺきん轨道运营公司こうし获得北京ぺきん铁19ごう线运营权 (BJMOA Obtains Operation Rights for Beijing Subway Line 19)". 继国庆节ぜん成功せいこうだか水平すいへい开通运营北京大ぺきんだい兴国际机场线きさきまたおさむいたなる交通こうつう书,经市政府せいふ批准ひじゅん公司こうし确定为北京地きょうじ铁19ごう线的运营しょう (Following the successful opening of the Daxing Airport Express before the National Day, a transaction notification was received. With the approval of the municipal government, the BJMOA company was identified as the operator of Line 19)
  61. ^ "公司こうしかい绍". November 27, 2019. 目前もくぜん,负责运营北京ぺきん轨道交通こうつうつばめぼう线、北京大ぺきんだい兴国际机场线 (Currently operates Yanfang line and Daxing Airport Express of Beijing Subway)
  62. ^ "とく许经营主体しゅたい北京ぺきん城市じょうし铁建轨道交通こうつうとう资发てん有限ゆうげん公司こうしとく许经营期さんじゅうねん。运营しょう为"4だい8しょう"联合体がったいちゅう运营专业公司こうし北京ぺきん轨道交通こうつう运营管理かんり有限ゆうげん公司こうし北京ぺきん轨道运营)".
  63. ^ (Chinese) 北京ぺきん轨道交通こうつうけん管理かんり有限ゆうげん公司こうし 公司こうしかい accessed 2019-08-11
  64. ^ (Chinese) 北京ぺきんこう交有轨电车有げん公司こうし Accessed 2019-08-11
  65. ^ "きょうじょう铁 : 欢迎使用しよう きょうじょう铁". Retrieved August 12, 2019.
  66. ^ "Beijing Metro" BII Railway Transportation Technology Holdings Company Limited website
  67. ^ "Company profile" BII Railway Transportation Technology Holdings Company Limited website Accessed 2019-07-06
  68. ^ "Rail transit operation" BII Railway Transportation Technology Holdings Company Limited website Accessed 2019-07-06
  69. ^ 北京ぺきん磁悬浮S1线西段通だんつう过环评 かい造成ぞうせい电磁污染 (in Simplified Chinese). きょう华时报. August 4, 2010. Archived from the original on February 9, 2019. Retrieved February 8, 2019.
  70. ^ The M-series train that appeared on Lines 2 and 13 were made by Japan's Tokyu Car Corporation "东急" Accessed Mar. 28, 2010
  71. ^ 中国ちゅうごくみなみ车中标北京地きょうじ铁大兴线、はちごう线. Ccmetro.com (in Simplified Chinese). 30 July 2009. Archived from the original on 8 July 2011. Retrieved 29 March 2010.
  72. ^ 北京ぺきん铁再添"あお岛造" 最高さいこう运营时速100公里くり (in Simplified Chinese). Xinhua News Shandong. 31 December 2009. Archived from the original on 18 July 2011. Retrieved 29 March 2010.
  73. ^ "北京ぺきん6じょう铁线はた实现无人驾驶 くびさきしょうよう于燕ぼう线--北京ぺきん频道--人民じんみん网". Archived from the original on November 19, 2015. Retrieved March 3, 2019.
  74. ^ a b c d e 北京ぺきん铁诞せい记:しゅう总理しょう筹建铁是为备战 (in Simplified Chinese). Beijing Daily. September 28, 2007. Archived from the original on January 16, 2009.
  75. ^ a b c d 经过はん个世纪 我国わがくに城市じょうし轨道交通こうつう运营里程りていちょう4900公里くり (in Simplified Chinese). People's Daily. October 12, 2019.
  76. ^ News.xinhuanet.com Id. Part 2
  77. ^ a b c d e f 1965 -- 1970ねん 大事だいじ (in Simplified Chinese). Beijing Subway. 24 April 2009. Archived from the original on 29 April 2014. Retrieved 29 April 2014.
  78. ^ The ceremony was not publicized at the time because the project was classified for its national security implications.
  79. ^ 北京ぺきん铁诞せい记:しゅう总理しょう筹建铁是为备战 (in Simplified Chinese). Beijing Daily. September 28, 2008. Archived from the original on January 14, 2009.
  80. ^ The initial line, originally slated for completion by 1968, was delayed by the onset of the Cultural Revolution. The original director of the project, General Yang Yong and much of the city government were purged in 1967. [2] "杨勇しょう传(5)" in "もう泽东瞩目的もくてきちょ名将めいしょう帅(" (2003)
  81. ^ a b c d e f g h i j k 1971 -- 1980ねん 大事だいじ (in Simplified Chinese). Beijing Subway. 24 April 2009. Archived from the original on 29 April 2014. Retrieved 29 April 2014.
  82. ^ a b 公司こうし1971 -- 1980ねん (in Simplified Chinese). Beijing Subway. Archived from the original on December 3, 2007. Retrieved July 21, 2008.
  83. ^ a b c d e f g h i j k l 1981 -- 1990ねん 大事だいじ (in Simplified Chinese). Beijing Subway. 24 April 2009. Archived from the original on 29 April 2014. Retrieved 29 April 2014.
  84. ^ a b c 公司こうし1991 -- 2000ねん (in Simplified Chinese). Beijing Subway. 24 April 2009. Archived from the original on 31 October 2010. Retrieved 31 May 2010. P1:1991-1993
  85. ^ a b 公司こうし1991 -- 2000ねん (in Simplified Chinese). Beijing Subway. 24 April 2009. Archived from the original on 7 July 2011. Retrieved 31 May 2010. P2: 1994-1997
  86. ^ a b 公司こうし1991 -- 2000ねん (in Simplified Chinese). Beijing Subway. 24 April 2009. Archived from the original on 7 July 2011. Retrieved 31 May 2010. P3:1998-2000
  87. ^ 北京ぺきん十条地铁同时建 しょう实现三环四横五纵七放射_网易おく. 2008.163.com. 163.com. Archived from the original on February 10, 2018. Retrieved February 10, 2018.
  88. ^ 1991 – 2000ねん 大事だいじ (in Simplified Chinese). Archived from the original on December 4, 2008. Retrieved July 21, 2008.
  89. ^ 北京ぺきん铁四ごう、十号线年底开工 せい拆迁やめ启动"] Nov. 14, 2003 (in Simplified Chinese).
  90. ^ "H.K. subway operator seeks Beijing projects". International Herald Tribune. March 29, 2009. Retrieved January 5, 2011.
  91. ^ a b いた2015ねん北京ぺきん铁建设静态投资将达2000亿元 (in Simplified Chinese). だいいち财经. 29 October 2008. Archived from the original on 18 July 2011. Retrieved 25 January 2009.
  92. ^ 2001 – 2004ねん 大事だいじ (in Simplified Chinese). Archived from the original on 3 December 2007. Retrieved 21 July 2008.
  93. ^ Id.
  94. ^ 1991 – 2000ねん 大事だいじ (in Simplified Chinese). Archived from the original on December 4, 2008. Retrieved July 21, 2008.
  95. ^ 2007ねん北京ぺきん铁运送乘客じょうきゃく6.55亿人 (in Simplified Chinese). ちゅう广网. January 2, 2008.
  96. ^ Hu, Richard (2023). Reinventing the Chinese City. New York: Columbia University Press. ISBN 978-0-231-21101-7.
  97. ^ "Beijing opens three new subways ahead of Olympics" China Daily July 19, 2008
  98. ^ 北京ぺきん铁今おこりいたり23にちのべ长运营时间. Bjsubway.com. August 13, 2008. Archived from the original on August 17, 2008.
  99. ^ Beijing subway system busy during Olympics Xinhua Aug. 27, 2008
  100. ^ 北京ぺきん铁2008ねん运送乘客じょうきゃく突破とっぱ12亿人 (in Simplified Chinese). Beijing Subway. Archived from the original on March 25, 2009. Retrieved January 3, 2009.
  101. ^ Zhang Nan; Meng Huan (11 December 2008). 西にし郊线どおり香山こうざん两年ない有望ゆうぼう开通 (in Simplified Chinese). Beijing Evening News. Archived from the original on 7 June 2011. Retrieved 7 January 2009.
  102. ^ Line 4 was originally scheduled to be completed by the end of 2007 see (Chinese) Gzuda.gov.cn Archived 2011-07-07 at the Wayback Machine "北京ぺきん铁4ごう10ごう线获审批2007ねんそこ投入とうにゅう运营" September 4, 2004; & Bh.buaa.edu.cn; 北京ぺきん铁4ごう线特许经营案れい Xinhuanet.com "北京ぺきん铁4ごう线今开通 站内设施ふく务全接触せっしょく"
  103. ^ Including 1.372 billion passengers of eight lines operated by Beijing Subway Operating Company, and 52.60 million passengers of Line 4 operated by Beijing MTR Corporation (Chinese)北京ぺきん公司こうし为轨道交どうこうどおりだい发展做好充分じゅうぶんじゅん. Archived from the original on January 10, 2010. Retrieved January 1, 2010.; "北京ぺきん铁4ごう线元旦がんたん间运送乘客じょうきゃくちょう过180まんにん" Jan. 1, 2010
  104. ^ 谁的铁,谁做ぬし (in Simplified Chinese). 财经ぶん摘. March 23, 2010.
  105. ^ 北京ぺきん10じょう铁五年内ねんない开建 远郊进市区しく1しょう时(图) (in Simplified Chinese). Sohu. December 31, 2010.
  106. ^ 北京ぺきん铁15ごう线有望ゆうぼう年内ねんない开工 (in Simplified Chinese). 北京ぺきんしょう报. October 9, 2008. Archived from the original on October 12, 2008. Retrieved October 12, 2008.
  107. ^ 北京ぺきん铁西郊线确定设五站 (in Simplified Chinese). The Beijing News. January 15, 2009. Archived from the original on September 24, 2015. Retrieved January 28, 2009.
  108. ^ "Chinadaily US Edition".
  109. ^ Xu Wei, "Beijing launches three new subway sections" China Daily 2012-01-01
  110. ^ ほん5ねんたてしげる"1—1—2"交通こうつうけん" (in Simplified Chinese). Beijing Municipal People's Government. January 21, 2011. Archived from the original on June 4, 2013. Retrieved August 24, 2012.
  111. ^ 北京ぺきん城市じょうし轨道交通こうつうだい二期建设规划(2015~2021 ねん) (PDF). National Development and Reform Commission (NDRC).
  112. ^ "编制轨道交通こうつうしん一轮建设规划". Beijing Evening News. February 27, 2019. Archived from the original on March 28, 2019.
  113. ^ 北京ぺきん铁19ごう线将设10车站8のう换乘 年内ねんない开建 (in Simplified Chinese). Beijing Daily. August 27, 2015.
  114. ^ "Beijing Subway largest in the world". Voice of Russia. December 30, 2012. Archived from the original on January 21, 2013. Retrieved January 2, 2013.
  115. ^ 北京ぺきん2012ねん国民こくみん经济社会しゃかい发展统计こう. Beijing Stats. February 7, 2013. Archived from the original on October 3, 2013. Retrieved February 18, 2013.
  116. ^ a b c d 北京ぺきん铁10ごう线一けん57公里くり 创地铁之さい. xinhuanet.com (in Simplified Chinese). May 6, 2013. Archived from the original on September 26, 2013.
  117. ^ 京地きょうじ铁8ごう线南北新ほくしん线周ろく开通 中国ちゅうごく术馆站暂缓开どおり. Xinhua News (in Simplified Chinese). Beijing Evening News. December 25, 2013. Archived from the original on January 5, 2014.
  118. ^ Du Yan (もりつばめ) (January 2, 2014). 北京ぺきんいちねん运客ちょう32亿人 どうぞう长近30%. 中国ちゅうごくしん闻网. Retrieved January 2, 2014.
  119. ^ 北京ぺきん:4じょう铁新线开どおり 轨道线路总里ほど达527公里くり. Xinhua News. December 28, 2014. Archived from the original on December 28, 2014. Retrieved December 28, 2014.
  120. ^ 北京ぺきん铁4じょうしん线全景ぜんけい公布こうふ(图) (in Simplified Chinese). December 26, 2014.
  121. ^ 北京ぺきん铁平价时だい终结 はた按里ほどおさむ费(そう语). September 25, 2014.
  122. ^ a b 北京ぺきん2014ねん国民こくみん经济社会しゃかい发展统计こう. 北京ぺきん统计きょく [Beijing Municipal Bureau of Statistics]. 12 February 2014. Archived from the original on 12 March 2016. Retrieved 12 February 2015.
  123. ^ 北京ぺきん2015ねん暨"じゅう"时期国民こくみん经济社会しゃかい发展统计こう. 北京ぺきん统计きょく [Beijing Municipal Bureau of Statistics]. 15 February 2016. Retrieved 18 February 2015.
  124. ^ a b Wei Fangchao (かたちょう) (April 10, 2015). 北京ぺきん铁建设投入とうにゅうやめ达2500亿 ごと公里くり成本なりもとちょう10亿 (in Simplified Chinese). 中国ちゅうごく网.
  125. ^ 发改北京ぺきん铁每公里くりづくり价已ちょう过10亿元 (in Simplified Chinese). 中国ちゅうごくしん闻网. June 30, 2015.
  126. ^ a b c 北京ぺきんくびじょう"空中くうちゅう小火ぼや车"拟今年ことし开工. The Beijing News 2014-02-24.
  127. ^ a b 北京ぺきんけん空中くうちゅう东四环:またがしき单轨 づくり价为铁1/3. 法制ほうせいばん. February 24, 2012.
  128. ^ 北京ぺきん轨道交通こうつうだまいずみ线工ほど环境かげ响评价公众参与さんよだいいち公示こうじ - 中国ちゅうごく铁道科学かがく研究けんきゅういんしん中心ちゅうしん通知つうち公告こうこく正文せいぶん. January 7, 2014.
  129. ^ "总体总包项目". Archived from the original on March 13, 2021.
  130. ^ Beijing canceled air train monorail line construction program Archived May 18, 2015, at the Wayback Machine 2015-02-03
  131. ^ "单轨东四环线方案搁浅 7ごう线将东延いたり环球かげじょう" [Monorail Dongsihuan Line proposal shelved, Line 7 to be extended east to Universal Beijing Resort]. August 25, 2015. Archived from the original on August 31, 2021.
  132. ^ Ding Jing (ちょうしず) (December 26, 2015). 北京ぺきん铁14ごう线中段ちゅうだん昌平しょうへい线二期开通试运营 (in Simplified Chinese). Xinhua News. Archived from the original on January 5, 2016.
  133. ^ くび披露ひろう 北京ぺきん未来みらい5-10ねん这样けん……. news.sina.com.cn. January 26, 2018. Retrieved February 10, 2018.
  134. ^ Jin, Zhang. "Beijing starts building five more subway lines". CRIenglish.com. China Radio International. Retrieved December 14, 2016.[dead link]
  135. ^ a b からだ验北京地きょうじ铁:ぼつゆう"さい挤"ただゆうさらしょう窍门おお. January 20, 2017. Retrieved January 25, 2017.
  136. ^ "铁大兴机场线あかりおこり运营,6じょうつくえ场大ともえ线路どう开通". September 25, 2019.
  137. ^ "北京ぺきん:两条铁新线本しゅうろく试运营". December 26, 2019. Archived from the original on December 26, 2019.
  138. ^ "北京ぺきん道路どうろしょう际客运今おこり全部ぜんぶとま运" 北京ぺきん青年せいねん 2020-01-26
  139. ^ (Chinese) "北京ぺきん铁将ぜんみち网推ぎょう测温 体温たいおんちょう37.3°C就需隔离" 人民じんみん 2020-01-27
  140. ^ (Chinese) "全国ぜんこく哀悼あいとう北京ぺきん铁运行列ぎょうれつ车停车鸣ふえさん 乘客じょうきゃく肃立哀悼あいとう" しんきょう 2020-04-04
  141. ^ Beijing's 'intelligent' metro line able to identify unmasked passengers Xinhua 2020-04-09
  142. ^ "首都しゅとつくえ场线启用しん导向标识 _光明こうみょう网". travel.gmw.cn. Retrieved January 30, 2022.
  143. ^ "明日あしたおこり铁房やま线北のべ、16ごう线中段ちゅうだんかずゆう轨电车T1线开どおり试运营!". December 30, 2020.
  144. ^ "ていりょう北京ぺきん环球かりかく交通こうつう站口明天めいてんどう开通". August 25, 2021. Archived from the original on August 25, 2021.
  145. ^ "かんせん北京ぺきん9だん新地さらち铁今てん开通!线路图、しん站抢さき". December 31, 2021. Retrieved December 31, 2021.
  146. ^ "铁19ごう线剩あまり4站明试运营!しん宫至牡丹ぼたん园只需半しょう时".
  147. ^ "北京ぺきん铁16ごう线南だん明日あした开通并与きただん中段ちゅうだん贯通!".
  148. ^ "今日きょうおこりぼうやま线9ごう线部分列ぶんれつ车在工作こうさく高峰こうほう间实现跨线运ぎょう".
  149. ^ ""学院がくいん铁"昌平しょうへい线南のべどおり车!西にし二旗到西土城仅18ふん钟".
  150. ^ "北京ぺきんもと础设ほどこせとう资有げん公司こうし > 网站くび页".
  151. ^ "2017ねん统计报告 - かずすえ统计 - 轨道交通こうつう". Archived from the original on May 2, 2019. Retrieved April 28, 2018.
  152. ^ Beijing promises integrated subway service for disabled xinhua Aug. 27, 2008
  153. ^ All stations on Line 5 have elevators. Some of the older stations on Lines 1 and 2 have escalators that descend from the station entrances to the ticket counters one level below ground level but do not extend to the platform two levels below. In the summer of 2008, mechanical wheelchair lifts were installed next to staircases in these stations.北京ぺきん铁安そう轮椅ますくだ平台ひらだい(组图) [Beijing Subway installs wheelchair lifts]. Hexun News. Xinhua News. June 20, 2008.
  154. ^ "New Beijing Subway Line 5 is passenger-friendly", Beijing2008 Archived 2008-08-01 at the Wayback Machine Sept. 30, 2007
  155. ^ 北京ぺきん人民じんみん代表だいひょう大会たいかいつね务委员会公告こうこくだい7ごう北京ぺきん轨道交通こうつう运营安全あんぜん条例じょうれい》(2014ねん11月28にちどおり过,2015ねん5がつ1にち施行しこうだい38じょう [Beijing Municipal People's Congress Standing Committee Report No. 7, Beijing Municipal Rail Transportation Safe Operations Ordnance (Enacted 2014-11-28, Effective 2015-05-01) Art. 38] (in Simplified Chinese). Beijing People's Government. Archived from the original on November 13, 2017. Retrieved November 12, 2017.
  156. ^ "北京ぺきんじょう铁线实现4Gぜんくつがえ盖--IT--人民じんみん网". it.people.com.cn. Retrieved January 28, 2022.
  157. ^ "北京ぺきん铁线基本きほん实现4G网络覆盖_财经_腾讯网". finance.qq.com. Retrieved January 28, 2022.
  158. ^ "北京ぺきんやめ开通5Gもと站5.64まん个 网络良好りょうこうくつがえ盖率ちょうきゅうなり-しん华网". www.xinhuanet.com. Retrieved January 28, 2022.
  159. ^ "China now has 5G on the subway and it's super fast". South China Morning Post. May 17, 2019. Retrieved January 28, 2022.
  160. ^ a b c "三座地铁车站引入便利店-しん华网". www.bj.xinhuanet.com. Archived from the original on August 4, 2021. Retrieved January 28, 2022.
  161. ^ "北京ぺきんてき铁站、站即はた开设ぶつ便利べんりてん". www.chinanews.com.cn. Retrieved January 28, 2022.
  162. ^ a b "北京ぺきん铁将さいつぎむかえらいしょう铺时だい_ひさし广网". finance.cnr.cn. Retrieved January 28, 2022.
  163. ^ "华润确认进军北京ぺきんぜん便利べんりてん紧随其后_ひさし广网". finance.cnr.cn. Retrieved January 28, 2022.
  164. ^ 北京ぺきん报客户端 (December 25, 2020). "北京ぺきん2021ねん31けん重要じゅうよう民生みんせい实事项目确定 您关心的しんてきざいれつ". news.sina.com.cn. Retrieved January 28, 2022.
  165. ^ "北京ぺきん铁站ないくび便利べんりてん开业!现场实拍さがせ究竟くっきょう_きょう报网". news.bjd.com.cn. Retrieved January 28, 2022.
  166. ^ "北京ぺきん铁再开便利べんりてん便利べんりてん"あらばく"开花りょう | 界面かいめんしん闻". m.jiemian.com. Retrieved January 28, 2022.
  167. ^ a b 北京ぺきん铁热线25にち开通 解答かいとう8类问题 [Beijing Subway telephone hotline opens on the 25th, intending to answer 8 types of question] (in Simplified Chinese). Beijing Daily. 24 July 2008. Archived from the original on 7 April 2014. Retrieved 5 April 2014.
  168. ^ 北京ぺきん铁开どおりふく务热线可查询铁公交换じょうしんじいき [Beijing Subway opens service hotline to look up Subway to Bus transfers] (in Simplified Chinese). July 24, 2008.
  169. ^ 8ごうしん线通りょう 铁热线改なり96165 (in Simplified Chinese). Beijing Youth Daily. 29 December 2013. Archived from the original on 7 April 2014. Retrieved 5 April 2014.
  170. ^ "网友反映はんえい北京ぺきん铁将"站"译为Zhan妥,かんかた:统一译法". www.thepaper.cn. Retrieved February 10, 2022.
  171. ^ さるどおり铁集团董ごと长学习北京地きょうじ铁应对客りゅうほう (in Simplified Chinese). Xinmin Evening News. March 9, 2010.
  172. ^ あかりおこり北京ぺきん铁10ごう线发车间へだたはた缩短10びょう. news.sohu.com. July 20, 2015.
  173. ^ わが轨道交通こうつう网络运营效果こうかとつ. 北京ぺきん交通こうつう员会. 7 February 2013. Archived from the original on 9 January 2014. Retrieved 15 September 2013.
  174. ^ 北京ぺきん铁1ごう线、5ごう线、10ごう线年そこさいかい两分钟一趟-しん华网. news.xinhuanet.com. Retrieved December 31, 2017.
  175. ^ 孙福あきら, 马毅りん. "纵观北京ぺきんじゅうねんきゃくりゅう变化(2010-2019)". Weixin Official Accounts Platform. Retrieved May 24, 2021.
  176. ^ きん10ねんぞう长2ばい きゃく运量ちょう1000まんにん -- 北京ぺきん轨道交通こうつうけん设凸显"北京ぺきん速度そくど"-しん华网. www.xinhuanet.com. Archived from the original on January 1, 2018. Retrieved December 31, 2017.
  177. ^ a b "北京ぺきん铁1ごう线车辆间隔跑进1ふん45びょう怎么做到てき_れつ车". www.sohu.com. Retrieved June 15, 2022.
  178. ^ a b c d e f "四条地铁线开行大站快车". Beijing Evening News. March 31, 2020. Archived from the original on April 4, 2020.
  179. ^ "10ごう线加入かにゅう"そうちょう"家族かぞく 最小さいしょう运行间隔缩至1ふん45びょう". WeChat Official Accounts Platform. Retrieved April 24, 2020.
  180. ^ 铁2ごう线发车间へだたはた缩短为2ふん. Beijing Subway. April 16, 2009. Retrieved June 14, 2013.
  181. ^ a b "北京ぺきん铁5、6、13、15ごう线采ちょうつねちょうつよし措施 くだてい高峰こうほうれつ车满载率_ひさし广网". m.cnr.cn. Retrieved January 19, 2024.
  182. ^ しもしゅう一起北京地铁8ごう线早高峰こうほうれつ车间隔缩短15びょう] 2014-12-26 (in Simplified Chinese).
  183. ^ 三条さんじょうしん线将开 北京ぺきん铁奥运最だかきゃくりゅうはた达587まん (in Simplified Chinese). Xinhua News. July 17, 2008. Archived from the original on January 13, 2009.
  184. ^ "づくり"だかこうがた铁"10じょう铁线跑进2ふん钟_公告こうこく提示ていじ_首都しゅとまど_北京ぺきん人民じんみん政府せいふ门户网站". www.beijing.gov.cn. Retrieved May 24, 2021.
  185. ^ 13ごう线加挂两节车厢 (in Simplified Chinese). Beijing Youth Daily. Archived from the original on 27 May 2011. Retrieved 16 August 2008. July 21, 2008
  186. ^ 北京ぺきん铁2ごう线全さら换空调车 (in Simplified Chinese). The Beijing News. 8 August 2008. Archived from the original on 10 December 2008. Retrieved 16 August 2008. Aug. 8, 2008
  187. ^ a b 北京ぺきん四条しじょう新地さらち铁线30にち开通 くびまつ车时间确じょう. Xinhua News. 26 December 2012. Archived from the original on 31 December 2012. Retrieved 27 December 2012.
  188. ^ 4じょう铁线はたそうへい蔽门 (in Simplified Chinese). 法制ほうせいばん. 20 January 2010. Archived from the original on 21 July 2011. Retrieved 20 January 2010.
  189. ^ 北京ぺきん铁17ごう线两站率さき开工 一车站将建最长站台-しん华网. news.xinhuanet.com. Archived from the original on October 31, 2016. Retrieved October 31, 2016.
  190. ^ 北京ぺきん铁重てん车站为应对大きゃくりゅう早晚そうばん高峰たかみねすすむげんりゅう" しんきょう] Nov. 11, 2007 (in Simplified Chinese).[permanent dead link]
  191. ^ (Video) 北京ぺきん八通线公布早高峰拥挤度与限流挂钩 (in Simplified Chinese). 中国ちゅうごくしん闻网. September 5, 2011.
  192. ^ 北京ぺきん25个地铁站高峰たかみねつね态限りゅう. ifeng.com, Ifeng news (in Simplified Chinese). August 31, 2011. Archived from the original on January 7, 2018. Retrieved September 10, 2011.
  193. ^ 北京ぺきん41铁站公布こうふつね态限りゅう时间 はたしらげ确到ぶん (in Simplified Chinese). The Beijing News. January 7, 2013. Archived from the original on January 7, 2016.
  194. ^ "北京ぺきん铁4ごう线、だい兴线工作こうさくはや高峰たかみねすすむげんりゅう-せん龙网·中国ちゅうごく首都しゅと网". beijing.qianlong.com. Retrieved January 25, 2019.
  195. ^ "くわだて业动态_北京ぺきん人民じんみん政府せいふ国有こくゆう资产监督管理かんり员会". gzw.beijing.gov.cn. Retrieved May 24, 2021.
  196. ^ a b c くに贸东ちょく门等四大换乘站拟择机改造 换乘ちょう5ふん (in Simplified Chinese). Beijing Municipal People's Government. 7 July 2012. Archived from the original on 11 July 2012. Retrieved 9 July 2012.
  197. ^ 北京ぺきん铁西ちょく门站换13ごう线不さい绕大けん (in Simplified Chinese). CCTV News. August 28, 2009.
  198. ^ "北京ぺきん铁西ちょく门站9がつ24にち启用しん换乘どおりどう" (in Simplified Chinese). Beijing Times. September 23, 2011. Retrieved November 3, 2023.
  199. ^ 24にち铁西ちょく门站地下ちか换乘どおりどう正式せいしき启用 换乘方式ほうしき变化だい (in Simplified Chinese). Beijing Subway. September 22, 2011. Archived from the original on July 7, 2012. Retrieved August 28, 2012.
  200. ^ みなみ锣鼓ちまた铁站そうこうどうたい换乘. baic.gov.cn (in Simplified Chinese). May 17, 2012. Archived from the original on November 27, 2012.
  201. ^ 公主こうしゅ坟地铁站新建しんたけ四个换乘厅 换乘ちょう过100めーとる (in Simplified Chinese). Beijing Municipal People's Government. March 28, 2012. Archived from the original on May 1, 2012. Retrieved August 28, 2012.
  202. ^ 北京ぺきん铁"さい复杂换乘站"开通:よう最少さいしょう7ふん (in Simplified Chinese). Beijing Morning News. December 23, 2013.
  203. ^ "Beijing starts passenger security checks in all subway stations",Chinaview.com.cn June 29, 2008
  204. ^ 元旦がんたん间地铁客りゅうはた达840まん 恢复"逢包必检" (in Simplified Chinese). せん龙网. December 30, 2008. Archived from the original on January 7, 2009. Retrieved January 7, 2009.
  205. ^ "北京ぺきんこばめ接受せつじゅ铁安ぜん检查はた处理" (in Simplified Chinese). Beijing Times. March 18, 2009. Archived from the original on March 3, 2016. Retrieved January 2, 2010.
  206. ^ "Backgrounder: Major metro accidents in China". Archived from the original on February 21, 2014.
  207. ^ For example, 北京ぺきん铁一号线一男子跳轨事故最新情况. July 17, 2009. Archived from the original on July 20, 2009. and 北京ぺきん铁一号线因乘客跳下站台晚点 やめ恢复运营. February 14, 2014.
  208. ^ 北京ぺきん铁五ごう线"10•8"事故じこ (in Simplified Chinese). November 14, 2018. Archived from the original on December 8, 2010. Retrieved July 15, 2010.
  209. ^ 北京ぺきん铁实习生误操作そうさ 一维修工电梯内被挤死 (in Simplified Chinese). 法制ほうせいばん. 21 June 2009. Archived from the original on 7 July 2011. Retrieved 15 July 2010.
  210. ^ "Two killed in Beijing subway construction site accident" Xinhua 2010-07-14
  211. ^ a b 北京ぺきん铁透すい事故じこわたることかん员贪贿近6千万被判死缓 (in Simplified Chinese). Legal Daily. January 30, 2014.
  212. ^ 北京ぺきん铁6ごう线工发生塌方 一工人被埋身亡. 163.com news (in Simplified Chinese). June 1, 2011.
  213. ^ "Xinhuan News - One dead, 28 injured in Beijing subway escalator accident" 2011-07-05
  214. ^ "Beijing Subway Hostage Taker Shot: Armed Standoff At Hujialou Station Ends In Bloodshed". Huffington Post. July 25, 2012.
  215. ^ "Beijing subway train derails during testing of new section of tracks". South China Morning Post. May 3, 2014.
  216. ^ http://www.scmp.com/news/china/article/1634392/beijing-subway-passengers-tried-raise-alarm-accident-victim-was-dragged "South China Morning Post — Beijing subway passengers tried to raise alarm before accident victim was dragged to her death"
  217. ^ "Trial train of Beijing subway derails, no casualties found". Sina News. March 25, 2015. Retrieved August 31, 2020.
  218. ^ "Subway train derails during test run in Beijing". South China Morning Post. March 25, 2015. Retrieved December 9, 2020.
  219. ^ "Subway train on Yizhuang Line derails". people.cn. Retrieved December 9, 2020.
  220. ^ "Multiple Malfunctions Mar Opening of Beijing's New Streetcar Line". Thebeijingner. January 3, 2018. Retrieved December 9, 2020.
  221. ^ "西にし郊线香山こうざん站恢复双こう运营". Beijing Youth Daily. Archived from the original on March 8, 2018. Retrieved December 9, 2020.
  222. ^ "北京ぺきん铁:初步しょほ了解りょうかい昌平しょうへい线为车辆故障こしょう工作こうさくじん员正组织紧急救援きゅうえん疏散". 中央ちゅうおう. December 14, 2023. Retrieved December 14, 2023.
  223. ^ "北京ぺきん铁:北京ぺきん铁昌ひら线突发故障こしょう最新さいしんかい应". 绍兴网. December 14, 2023. Retrieved December 14, 2023.
  224. ^ "昌平しょうへい线列车最きさき两节あずかぜん车在西にし二旗至生命科学园区段发生分离情况,ゆう乘客じょうきゃく受伤". しんなみほろはく. 北京ぺきん铁. December 14, 2023. Retrieved December 14, 2023.
  225. ^ 中国ちゅうごく铁标こころざしはな样迭 铁建设如如荼 (in Simplified Chinese). 中国ちゅうごくけん筑新闻网. June 1, 2012. Archived from the original on June 26, 2013. Retrieved June 4, 2012.
  226. ^ a b Li Zhiyong (October 28, 2010). 北京ぺきんたてしげる首座しゅざ铁主题文化ぶんかこう [Beijing constructs first subway-themed culture park] (in Simplified Chinese). Xinhua News. Archived from the original on October 3, 2013. Retrieved October 3, 2013.

External links[edit]


39°54′50″N 116°23′30″E / 39.9138°N 116.3916°E / 39.9138; 116.3916