(Translated by https://www.hiragana.jp/)
Electrodeionization Plants
The Wayback Machine - https://web.archive.org/web/20160317105321/http://www.lenntech.es/sistemas/electrodeionization-plants.htm
Lenntech <!-- PLUGIN:LANGUAGE:water_treatment_and_purification --> Lenntech <!-- PLUGIN:LANGUAGE:water_treatment_and_purification -->

Electrodeionization Plants

EDI skid 145 m3/h



   

Plug and play, skid mounted
demi water system:
Softener, RO and EDI


Lenntech engineers design and build tailor-made EDI plants.

Our EDI plants are built with conventional plate-and-frame arrangement EDI modules up to 145 m3/h, to produce demi or ultra-pure water from RO permeate or IX demi-plants.

Feed water max conductivity 40 µS/cm
Feed water max hardness < 1 ppm
Demi / ultra pure water quality 8-18 MΩおめが
Recovery 90-95%


Our EDI plants include:
- Feed pump (optional)
- EDI modules
- Resistivity probe
- Electrical valves and fittings
- Instrumentation
- Control panel

In additions to the EDI trains, Lenntech can also built "all in one" turn key demi water systems. These systems include the pre-treatment, Reverse Osmosis and EDI-modules.

All components can be operated with a single controller


What is EDI?

Electrodeionization (EDI) modules

Sobre Lenntech

Lenntech BV
Rotterdamseweg 402 M
2629 HH Delft

tel: +31 152 755 704
fax: +31 152 616 289
e-mail: info@lenntech.com


Copyright © 1998-2016 Lenntech B.V. All rights reserved