A Robust Planning Model for Offshore Microgrid Considering Tidal Power and Desalination
Authors:
Zhimeng Wang,
Ang Xuan,
Xinwei Shen,
Yunfei Du,
Hongbin Sun
Abstract:
Increasing attention has been paid to resources on islands, thus microgrids on islands need to be invested. Different from onshore microgrids, offshore microgrids (OM) are usually abundant in ocean renewable energy (ORE), such as offshore wind, tidal power generation (TPG), etc. Moreover, some special loads such as seawater desalination unit (SDU) should be included. In this sense, this paper prop…
▽ More
Increasing attention has been paid to resources on islands, thus microgrids on islands need to be invested. Different from onshore microgrids, offshore microgrids (OM) are usually abundant in ocean renewable energy (ORE), such as offshore wind, tidal power generation (TPG), etc. Moreover, some special loads such as seawater desalination unit (SDU) should be included. In this sense, this paper proposes a planning method for OM to minimize the investment cost while the ORE's fluctuation could be accommodated with robustness. First, a deterministic planning model (DPM) is formulated for the OM with TPG and SDU. A robust planning model (RPM) is then developed considering the uncertainties from both TPG and load demand. The Column-and-constraint generation (C&CG) algorithm is then employed to solve the RPM, producing planning results for the OM that is robust against the worst scenario. Results of the case studies show that the investment and operation decisions of the proposed model are robust, and TPG shows good complementarity with the other RESs.
△ Less
Submitted 11 August, 2023;
originally announced August 2023.
-
Two-stage Planning for Electricity-Gas Coupled Integrated Energy System with CCUS Considering Carbon Tax and Price Uncertainty
Authors:
Ang Xuan,
Xinwei Shen,
Qinglai Guo,
Hongbin Sun
Abstract:
In this article, we propose two-stage planning models for Electricity-Gas Coupled Integrated Energy System (EGC-IES), in which traditional thermal power plants (TTPPs) are considered to be retrofitted into carbon capture power plants (CCPPs), with power to gas (PtG) coupling CCPPs to gas system. The sizing and siting of carbon capture, utilisation and storage (CCUS)/PtG facilities, as well as the…
▽ More
In this article, we propose two-stage planning models for Electricity-Gas Coupled Integrated Energy System (EGC-IES), in which traditional thermal power plants (TTPPs) are considered to be retrofitted into carbon capture power plants (CCPPs), with power to gas (PtG) coupling CCPPs to gas system. The sizing and siting of carbon capture, utilisation and storage (CCUS)/PtG facilities, as well as the operation cost of TTPPs/CCPPs/gas sources/PtG, are all considered in the proposed model, including penalty on carbon emissions and revenue of CCUS. With changing policy on climate change and carbon emission regulation, the uncertainties of carbon price and carbon tax are also analysed and considered in the proposed planning model. The stochastic planning, and robust planning methods are introduced to verify mutually through economic and carbon indices. The proposed methods' effectiveness in reducing carbon emissions, increasing profit of CCUS from EGC-IES are demonstrated through various cases and discussions.
△ Less
Submitted 21 July, 2021; v1 submitted 19 July, 2021;
originally announced July 2021.
-
Alternating Direction Method of Multiplier-Based Distributed Planning Model for Natural Gas, Electricity Network, and Regional Integrated Energy Systems
Authors:
Ang Xuan,
Yang Qiu,
Yang Liu,
Xin Sun
Abstract:
Regional integrated energy system coupling with multienergy devices, energy storage devices, and renewable energy devices has been regarded as one of the most promising solutions for future energy systems. Planning for existing natural gas and electricity network expansion, regional integrated energy system locations, or system equipment types and capacities are urgent problems in infrastructure d…
▽ More
Regional integrated energy system coupling with multienergy devices, energy storage devices, and renewable energy devices has been regarded as one of the most promising solutions for future energy systems. Planning for existing natural gas and electricity network expansion, regional integrated energy system locations, or system equipment types and capacities are urgent problems in infrastructure development. This article employs a joint planning model to address these; however, the joint planning model ignores the potential ownerships by three agents, for which investment decisions are generally made by different investors. In this work, the joint planning model is decomposed into three distributed planning subproblems related to the corresponding stakeholders, and the alternating direction method of multipliers is adopted to solve the tripartite distributed planning problem. The effectiveness of the planning model is verified on an updated version of the Institute of Electrical and Electronics Engineers (IEEE) 24-bus electric system, the Belgian 20-node natural gas system, and three assumed integrated energy systems. Simulation results illustrate that a distributed planning model is more sensitive to individual load differences, which is precisely the defect of the joint planning model. Moreover, the algorithm performance considering rates of convergence and the impacts of penalty parameters is further analyzed
△ Less
Submitted 29 June, 2021;
originally announced June 2021.
-
A Conditional Value-at-Risk Based Planning Model for Integrated Energy System with Energy Storage and Renewables
Authors:
Ang Xuan,
Xinwei Shen,
Qinglai Guo,
Hongbin Sun
Abstract:
Owing to the potential higher energy supply efficiency and operation flexibility, integrated energy system (IES), which usually includes electric power, gas and heating/cooling systems, is considered as one of the primary forms of energy carrier in the future. However, with the increasing complexity of multiple energy devices and systems integration, IES planning is facing a significant challenge…
▽ More
Owing to the potential higher energy supply efficiency and operation flexibility, integrated energy system (IES), which usually includes electric power, gas and heating/cooling systems, is considered as one of the primary forms of energy carrier in the future. However, with the increasing complexity of multiple energy devices and systems integration, IES planning is facing a significant challenge in terms of risk assessment. To this end, an energy hub (EH) planning model considering renewable energy sources (RES) and energy storage system (ESS) integration is proposed in this paper, in which the risk is measured by Conditional Value-at-Risk (CVaR). The proposed IES planning model includes two stages: 1) investment planning on equipment types and capacity (e.g., energy converters, distributed RES and ESS) and 2) optimizing the potential risk loss in operation scenarios along with confidence level and risk preference. The problem solving is accelerated by Benders Decomposition and Improved Backward Scenario Reduction Method. The numerical results illustrate the effectiveness of proposed method in balancing the potential operation risk and investment cost. Moreover, the effectiveness of reducing potential operation risk by introducing ESS and RES are also verified.
△ Less
Submitted 22 April, 2021;
originally announced April 2021.