Optimization of a Welding Procedure for Making Critical Aluminum Welds on the LBNF Absorber Core Block
Authors:
K. E. Anderson,
A. Deshpande,
V. I. Sidorov,
J. Zahurones
Abstract:
The LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. A weld quality optimization was performed to produce National Aeronautical Standard 1514 Class I quality welds on the aluminum core blocks. This was…
▽ More
The LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. A weld quality optimization was performed to produce National Aeronautical Standard 1514 Class I quality welds on the aluminum core blocks. This was not successful in all cases. An existing Gas Tungsten Arc Welding Procedure Specification was fine tuned to minimize, in most cases, and eliminate detect-able tungsten inclusions in the welds. All the weld coupons, however passed welding inspection as per the piping code: ASME B31.3 Normal Fluid Service. Tungsten electrode diameter, type, and manufacturer were varied. Some of the samples were pre-heated and others were not. It was observed that larger diameter electrodes, 5/32 in., with pre-heated joints resulted in welds with the least number of tungsten inclusions. It is hypothesized that thinner electrodes breakdown easily and get lodged into the weld pool during the welding process. This breakdown is further enhanced by the large temperature differential between the un-preheated sample and the hot electrode.
△ Less
Submitted 29 May, 2024;
originally announced June 2024.
Design Of The LBNF Beamline
Authors:
V. Papadimitriou,
K. Ammigan,
J. Anderson Jr.,
K. E. Anderson,
R. Andrews,
V. Bocean,
C. F. Crowley,
N. Eddy,
B. D. Hartsell,
S. Hays,
P. Hurh,
J. Hylen,
J. A. Johnstone,
P. Kasper,
T. Kobilarcik,
G. E. Krafczyk,
B. Lundberg,
A. Marchionni,
N. V. Mokhov,
C. D. Moore,
D. Pushka,
I. Rakhno,
S. D. Reitzner,
P. Schlabach,
V. Sidorov
, et al. (9 additional authors not shown)
Abstract:
The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward the Deep Underground Neutrino Experiment (DUNE) detectors, placed deep underground at the SURF Facility in Lead, South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's…
▽ More
The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward the Deep Underground Neutrino Experiment (DUNE) detectors, placed deep underground at the SURF Facility in Lead, South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos will be produced when the protons interact with a solid target to produce mesons which will be subsequently focused by magnetic horns into a 194m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spatial and radiological constraints, and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.
△ Less
Submitted 14 April, 2017;
originally announced April 2017.