MANTA: A Negative-Triangularity NASEM-Compliant Fusion Pilot Plant
Authors:
MANTA Collaboration,
G. Rutherford,
H. S. Wilson,
A. Saltzman,
D. Arnold,
J. L. Ball,
S. Benjamin,
R. Bielajew,
N. de Boucaud,
M. Calvo-Carrera,
R. Chandra,
H. Choudhury,
C. Cummings,
L. Corsaro,
N. DaSilva,
R. Diab,
A. R. Devitre,
S. Ferry,
S. J. Frank,
C. J. Hansen,
J. Jerkins,
J. D. Johnson,
P. Lunia,
J. van de Lindt,
S. Mackie
, et al. (16 additional authors not shown)
Abstract:
The MANTA (Modular Adjustable Negative Triangularity ARC-class) design study investigated how negative-triangularity (NT) may be leveraged in a compact, fusion pilot plant (FPP) to take a ``power-handling first" approach. The result is a pulsed, radiative, ELM-free tokamak that satisfies and exceeds the FPP requirements described in the 2021 National Academies of Sciences, Engineering, and Medicin…
▽ More
The MANTA (Modular Adjustable Negative Triangularity ARC-class) design study investigated how negative-triangularity (NT) may be leveraged in a compact, fusion pilot plant (FPP) to take a ``power-handling first" approach. The result is a pulsed, radiative, ELM-free tokamak that satisfies and exceeds the FPP requirements described in the 2021 National Academies of Sciences, Engineering, and Medicine report ``Bringing Fusion to the U.S. Grid". A self-consistent integrated modeling workflow predicts a fusion power of 450 MW and a plasma gain of 11.5 with only 23.5 MW of power to the scrape-off layer (SOL). This low $P_\text{SOL}$ together with impurity seeding and high density at the separatrix results in a peak heat flux of just 2.8 MW/m$^{2}$. MANTA's high aspect ratio provides space for a large central solenoid (CS), resulting in ${\sim}$15 minute inductive pulses. In spite of the high B fields on the CS and the other REBCO-based magnets, the electromagnetic stresses remain below structural and critical current density limits. Iterative optimization of neutron shielding and tritium breeding blanket yield tritium self-sufficiency with a breeding ratio of 1.15, a blanket power multiplication factor of 1.11, toroidal field coil lifetimes of $3100 \pm 400$ MW-yr, and poloidal field coil lifetimes of at least $890 \pm 40$ MW-yr. Following balance of plant modeling, MANTA is projected to generate 90 MW of net electricity at an electricity gain factor of ${\sim}2.4$. Systems-level economic analysis estimates an overnight cost of US\$3.4 billion, meeting the NASEM FPP requirement that this first-of-a-kind be less than US\$5 billion. The toroidal field coil cost and replacement time are the most critical upfront and lifetime cost drivers, respectively.
△ Less
Submitted 30 May, 2024;
originally announced May 2024.
Assessing the Risk of Proliferation via Fissile Material Breeding in ARC-class Fusion Power Plants
Authors:
J. L. Ball,
E. E. Peterson,
R. S. Kemp,
S. E. Ferry
Abstract:
Construction of a nuclear weapon requires access to kilogram-scale quantities of fissile material, which can be bred from fertile material like U-238 and Th-232 via neutron capture. Future fusion power plants, with total neutron source rates in excess of $10^{20}$ n/s, could breed weapons-relevant quantities of fissile material on short timescales, posing a breakout proliferation risk. The ARC-cla…
▽ More
Construction of a nuclear weapon requires access to kilogram-scale quantities of fissile material, which can be bred from fertile material like U-238 and Th-232 via neutron capture. Future fusion power plants, with total neutron source rates in excess of $10^{20}$ n/s, could breed weapons-relevant quantities of fissile material on short timescales, posing a breakout proliferation risk. The ARC-class fusion reactor design is characterized by demountable high temperature superconducting magnets, a FLiBe liquid immersion blanket, and a relatively small size ($\sim$ 4 m major radius, $\sim$ 1 m minor radius). We use the open-source Monte Carlo neutronics code OpenMC to perform self-consistent time-dependent simulations of a representative ARC-class blanket to assess the feasibility of a fissile breeding breakout scenario. We find that a significant quantity of fissile material can be bred in less than six months of full power operation for initial fertile inventories ranging from 5 to 50 metric tons, representing a non-negligible proliferation risk. We further study the feasibility of this scenario by examining other consequences of fissile breeding such as reduced tritium breeding ratio, extra heat from fission and decay heat, isotopic purity of bred material, and self-protection time of irradiated blanket material. We also examine the impact of Li-6 enrichment on fissile breeding and find that it substantially reduces breeding rate, motivating its use as a proliferation resistance tool.
△ Less
Submitted 5 June, 2024; v1 submitted 18 April, 2024;
originally announced April 2024.