The Ürümqi Metro or Ürümqi Subway is a rapid transit system in operation in Ürümqi, capital of the Xinjiang Autonomous Region in China.
Ürümqi Metro | |||
---|---|---|---|
Overview | |||
Locale | Ürümqi, Xinjiang, China | ||
Transit type | Rapid transit | ||
Number of lines | 1 | ||
Number of stations | 21 | ||
Daily ridership | 162,000 (29 April 2023 record)[1] | ||
Annual ridership | 39,281,000 (2023)[2] | ||
Website | http://www.urumqimtr.com/ | ||
Operation | |||
Began operation | October 25, 2018 | ||
Operator(s) | Ürümqi Rail Transit Corporation | ||
Number of vehicles | 162 Revenue Railcars (July 2018) | ||
Technical | |||
System length | 27.615 km (17.2 mi)[3] | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
|
Ürümqi Metro | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Simplified Chinese | 乌鲁 | ||||||||||
Traditional Chinese | |||||||||||
| |||||||||||
Uyghur name | |||||||||||
Uyghur | ئۈرۈمچى مېتروسى | ||||||||||
|
The Ürümqi Metro has submitted plans for two lines, Line 1 and Line 2, with an estimated cost of 31.24 billion yuan.[4]
Lines
editLine 1
editLine 1 runs from Ürümqi Diwopu International Airport through downtown Ürümqi and ends at Santunbei station. It has a total length of 27.615 km[3] and 21 stations.[3][5] It is fully underground.[6]
Line 1 started construction on 20 March 2014. The northern section of the line was opened on 25 October 2018. The southern section of the line was opened on 28 June 2019.[3]
Line | Terminals | Operational | Last extension | Length km |
Stations | |
---|---|---|---|---|---|---|
1 | International Airport (Xinshi) |
Santunbei (Tianshan) |
2018 | 2019 | 27.615[3] | 21 |
Under construction
editLine 2
editÜrümqi metro line 2 is under construction. The line will have 16 stations from Yan'an Road to Huashan Street.[7] Line 2 will serve Ürümqi railway station. The first stretch will open from Huashan Street upto Nanmen in July 2024. The rest of the part will open in 2027. The following is the route:
Yan’an Road – Xiangyangpo – Dawan – Heijiashan – Xingfu Road Middle – Xingfu Road West – Nanmen – Zhongqiao – Nianzigou – Nanliangpo – Xinjiang Agricultural University – Maliaodi – Pingchuan Road – Jiujiawan – Urumqi Railway Station – Huashan Street.
The color of this line is green.
Future Development
editThis section is empty. You can help by adding to it. (August 2021) |
Network Map
edit
See also
editReferences
edit- ^ "Sina Visitor System".
- ^ "Sina Visitor System".
- ^ a b c d e
通 南 彻北展 通 途 乌鲁木 齐地铁与您逐梦同行 . mp.weixin.qq.com (in Chinese). 2019-06-27. Archived from the original on 2019-06-27. - ^
新 疆乌鲁木齐市投 资312.4亿元建 设两条 轨道交通 .天山 网 (in Chinese). 2012-04-20. Archived from the original on 2014-01-07. Retrieved 2012-10-24. - ^ 乌鲁
木 齐地铁1号 线北段 空 载试运行. Kanzhun (in Chinese). 2018-04-18. Archived from the original on 2019-06-09. - ^ 28
日 ,京 疆合作 的 乌鲁木 齐轨道交 通 1号 线全线开通 试运营.北京 市 轨道交通 建 设管理 有限 公司 (in Chinese). 2019-09-03. Archived from the original on 2019-11-06. - ^ 乌鲁
木 齐地铁2号 线首座 车站九家湾站封顶.人民 网 (in Chinese). 2017-11-20. Archived from the original on 2019-05-27.