Line 5 is a northwest–southeast line in Nanjing Metro. The line color is yellow, and it was first opened on March 31, 2024.[1]
Line 5 | |||
---|---|---|---|
5 | |||
Overview | |||
Status | In operation | ||
Locale | Jiangning district Nanjing, Jiangsu | ||
Termini | |||
Stations | 9 | ||
Service | |||
Type | Rapid transit | ||
History | |||
Opened | 31 March 2024[1] | ||
Technical | |||
Line length | 12.9 km (8.0 mi)[2] (in operation) | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Operating speed | 80 km/h (Maximum) | ||
|
Opening timeline
editSegment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wenjinglu — Jiyindadao | 31 March 2024 | 12.9 km (8.0 mi)[2] | 9 | South section (Jiangning Section) |
Stations
editStation name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Jiyindadao | S1 | 0.000 | - | Jiangning | |
Jiulonghunan | 1.768 | 1.768 | |||
Chengxindadao | 诚信 |
3 | 4.863 | 3.095 | |
Qianzhuang | 6.060 | 1.197 | |||
Keninglu | 8.485 | 2.425 | |||
Zhushanlu | 1 [i] | 9.431 | 0.946 | ||
Xintinglu | 10.615 | 1.184 | |||
Dongshan | 东山 | 11.800 | 1.185 | ||
Wenjinglu | 12.44 | 0.640 | |||
Dongshanxiangzhangyuan | 东山 |
14.313 | 1.060 | ||
Shenjiying | 17.047 | 2.734 | Qinhuai | ||
Dajiaochang | 10 | 17.98 | 0.933 | ||
Qiqiaoweng | 19.276 | 1.296 | |||
Shimenkan | 20.207 | 0.931 | |||
Guanghuamen | 6 | 21.758 | 1.551 | ||
Tongjimen | 22.755 | 0.997 | |||
Fuzimiao | 3 | 24.124 | 1.369 | ||
Sanshanjie | 1 | 24.887 | 0.763 | ||
Chaotiangong | 26.626 | 1.739 | |||
Shanghailu | 2 | 27.539 | 0.913 | Qinhuai/Gulou | |
Wutaishan | 28.591 | 1.052 | Gulou | ||
Yunnanlu | 4 | 29.665 | 1.074 | ||
Qinchunguangchang | 30.739 | 1.074 | |||
Hongqiao | 31.766 | 1.027 | |||
Fujianlu | 7 | 32.474 | 0.708 | ||
Yancangqiao | 盐仓桥 | 33.625 | 1.151 | ||
Xiaguan | 9 | 34.513 | 0.888 | ||
Jinhaisi | 35.257 | 0.744 | |||
Nanjingxi Railway Station | 35.891 | 0.634 | |||
Fangjiaying | 36.9 | 1.009 |
- ^ Virtual transfer with line 1 – For passengers transfer within 30 minutes after exiting with a Passenger Code or a Public Transit Card, continuous billing is adopted; Passengers with token need to transfer just by putting the ticket into recycling port and afterwards repurchase a ticket; Passengers with UnionPay Quick Pass Card headed by 62 or Mobile Pay can transfer just by tapping in again after exiting.
References
edit- ^ a b "
南京 地 铁5号 线南段 3月 31日 中午 12时开通 初期 运营". 扬子晚 报网 (in Chinese). 30 March 2024. Retrieved 30 March 2024. - ^ a b "刚刚,
地 铁5号 线南段通 车!". www.xhby.net.