(Translated by https://www.hiragana.jp/)
Seishin-Yamate Line - Wikipedia

The Seishin-Yamate Line (西にししん山手やまてせん, Seishin-Yamate-sen), also known by its nickname of "Midori no U-Line" (Japanese: みどりのUライン, lit.'The green "U" line'), is one of the two lines of the Kobe Municipal Subway. It links the central districts to the east and western suburbs of Kobe. The line color is green.

Seishin-Yamate Line
6000 series train
Overview
Other name(s)Midori no U-Line
Native name西にししん山手やまてせん
StatusOperational
OwnerKobe Municipal Transportation Bureau
LocaleKobe
Termini
Stations16
Color on map Green (#00AE8F)
Service
TypeRapid transit
SystemThe logo of the Kobe Municipal Subway. Kobe Municipal Subway
Operator(s)Kobe Municipal Transportation Bureau
History
Opened13 March 1977; 47 years ago (1977-03-13)
Technical
Line length22.7 km (14.1 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC overhead catenary
Operating speed90 km/h (55 mph)[1]
Route map
Kobe subway lines

Service pattern

edit

The line has a reciprocal through service with the Hokushin Line (formerly the Hokushin Kyukuo Electric Railway); all trains run between either Tanigami or Shin-Kobe and Seishin-chūō, stopping at every station. During rush hours, additional trains run between Shin-Kobe and Myōdani.

History

edit

On 15 October 1971, a railway license was issued to the Kobe Municipal Transportation Bureau to build a subway line linking the Myōdani district to the Shin-Kobe Shinkansen station; construction on the first segment of that line began on 25 November of that year. The first segment of the subway (between Shin-Nagata and Myodani, known as the Seishin Line) opened on 13 March 1977; a second segment of the line (between Shin-Nagata and Okurayama, known as the Yamate Line) opened on 17 February 1982. The line was extended to Shin-Kobe on 18 June 1985; a western extension to Gakuen-toshi (from Myodani) opened that same day. On 18 March 1987, the final segment of the subway line opened between Gakuen-toshi and Seishin-chūō.[citation needed]

The Hokushin Kyuko Electric Railway opened on 2 April 1988, providing service between Tanigami and Shin-Kobe. An infill station (Seishin-minami) opened in between Seishin-chūō and Ikawadani stations on 20 March 1993, expanding the line to a total of 16 stations. On 17 January 1995, the subway line was shut down due to damage caused by the Great Hanshin earthquake; the line resumed operation with limited service between Seishin-chūō and Itayado the following day, along with the entirety of the Hokushin Kyuko line. Limited service was resumed across the entire line on 16 February, and full service was restored in March 1995 after repairs were completed, albeit with speed restrictions remaining in place until 21 July of that year.[citation needed]

The subway began to accept the Surotto Kansai smart card in October 1999; it would start accepting PiTaPa in October 2006.

Women-only cars began to be used on the subway line from 16 December 2002. Currently, one car heading in the direction of Seishin-chūō (car number 4) is reserved for women only; the restriction applies throughout the entire day.

Women-only car
←Seishin-chūō Shin-Kobe
Tanigami→
1 2 3 4 5 6

Stations

edit
Name No. Name Japanese Distance (km)
from
Shin-Kobe
Transfers Location
Hokushin Line  S01  Tanigami 谷上やがみ –7.5   Hokushin Line
Shintetsu Arima Line
Kita-ku
Seishin-Yamate Line  S02  Shin-Kobe しん神戸こうべ 0.0   San'yō Shinkansen
  Hokushin Line
Chuo-ku
 S03  Sannomiya 三宮さんのみや 1.3
 S04  Kenchōmae 県庁けんちょうまえ 2.2  
 S05  Ōkurayama 大倉山おおくらやま
湊川みなとがわ神社じんじゃまえ
3.3  
 S06  Minatogawa-Kōen 湊川公園みなとがわこうえん
川崎かわさき病院びょういんまえ
4.3 Hyōgo-ku
 S07  Kamisawa 上沢うわさわ 5.3  
 S08  Nagata (Nagatajinjamae) 長田ながた長田ながた神社じんじゃまえ 6.1 Kobe Kosoku Line (Kosoku-Nagata Station) Nagata-ku
 S09  Shin-Nagata 新長田しんながた鉄人てつじん28ごうまえ 7.6
 S10  Itayado 板宿いたやど
滝川たきがわ中学ちゅうがく高等こうとう学校がっこうまえ
8.8 Sanyo Railway Main Line
 S11  Myōhōji 妙法寺みょうほうじ 11.7   Suma-ku
 S12  Myōdani 名谷みょうだに 13.3  
 S13  Sōgō Undō Kōen 総合そうごう運動公園うんどうこうえん 15.1  
 S14  Gakuen-Toshi 学園がくえん都市とし 16.8   Nishi-ku
 S15  Ikawadani 伊川谷いかわだに 18.4  
 S16  Seishin-Minami 西にし神南じんなん 20.1  
 S17  Seishin-Chuo 西神中央せいしんちゅうおう 22.7  

Rolling stock

edit
 
A 1000 series train in January 2008
 
A 2000 series train in 2015
 
A 3000 series train in 2015
  • 1000 series (since 1977) (18 sets)
  • 2000 series (1988–2022) (4 sets)
  • 3000 series (1992–2021) (6 sets)
  • 6000 series (since 2019) (25 sets)
  • Hokushin Kyuko Railway 7000 series (since 1988) (5 sets)

All trains are based at Tanigami and Myōdani Depots.

A fleet of new trains (known as the 6000 series) is to be introduced on the line between fiscal 2018 and 2022; these trains will replace all existing trains on the line. Built by Kawasaki, the design of the new trains will be overseen by Ken Okuyama Design.[2]

The last of the 2000 series sets were retired in March 2021.[3]

See also

edit

References

edit
  1. ^ Terada, Hirokazu (19 January 2013). データブック日本にっぽん私鉄してつ [Databook: Japan's Private Railways] (in Japanese). Japan: Neko Publishing. p. 154. ISBN 978-4-7770-1336-4.
  2. ^ 神戸こうべ交通こうつうきょく新形しんがた車両しゃりょうデザインのデザインあん公開こうかい [Kobe Municipal Transportation Bureau publishes proposed designs for new trains]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 17 October 2016. Archived from the original on 17 October 2016. Retrieved 17 October 2016.
  3. ^ "神戸こうべ市営しえい地下鉄ちかてつ2000かたち引退いんたい、1000かたち基本きほんにデザインせいたかめた車両しゃりょう". MyNavi Corporation (in Japanese). 12 April 2022. Retrieved 22 November 2022.
edit