Florida State Road 84: Difference between revisions
Sanibel sun (talk | contribs) →History: sources added |
Sanibel sun (talk | contribs) |
||
Line 49: | Line 49: | ||
Construction began on Alligator Alley in the early 1960s.<ref>{{cite news |last1=Sullivan-Hartung |first1=Maureen |title=Alligator Alley: 45 years of connecting east and west |url=https://naples.floridaweekly.com/articles/alligator-alley-45-years-of-connecting-east-and-west/ |access-date=22 May 2024 |agency=Florida Weekly |date=28 February 2013}}</ref> On the Naples side, the route would connect with Davis Boulevard, a local road running from US 41 to Airport Road ([[List of county roads in Collier County, Florida#County Road 31|CR 31]]). Davis Boulevard was named for George Davis, one of the Naples area's first attorneys who built one of the first houses along the road near Shadowlawn Drive.<ref name="Armbruster">{{cite news |last1=Armbruster |first1=Mary |title=Just on the street where you live: History behind Naples' street names |url=https://www.newspapers.com/image/798827016/?terms=Just%20on%20the%20street%20where%20you%20live&match=1 |access-date=14 May 2024 |agency=The Naples Star |date=27 August 1983}}</ref> |
Construction began on Alligator Alley in the early 1960s.<ref>{{cite news |last1=Sullivan-Hartung |first1=Maureen |title=Alligator Alley: 45 years of connecting east and west |url=https://naples.floridaweekly.com/articles/alligator-alley-45-years-of-connecting-east-and-west/ |access-date=22 May 2024 |agency=Florida Weekly |date=28 February 2013}}</ref> On the Naples side, the route would connect with Davis Boulevard, a local road running from US 41 to Airport Road ([[List of county roads in Collier County, Florida#County Road 31|CR 31]]). Davis Boulevard was named for George Davis, one of the Naples area's first attorneys who built one of the first houses along the road near Shadowlawn Drive.<ref name="Armbruster">{{cite news |last1=Armbruster |first1=Mary |title=Just on the street where you live: History behind Naples' street names |url=https://www.newspapers.com/image/798827016/?terms=Just%20on%20the%20street%20where%20you%20live&match=1 |access-date=14 May 2024 |agency=The Naples Star |date=27 August 1983}}</ref> |
||
Maps in the late 1960s indicated that Alligator Alley would be designated State Road 838, a designation which runs along [[Florida State Road 838|Sunrise Boulevard]].<ref>{{cite map |author = State Road Department of Florida |title = Official State Road Map of Florida |year = 1967 |url = https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/co-gis/past_statemap/flstatemap1967.pdf?sfvrsn=df4d3c3a_0 |scale = Scale not given |location = Tallahassee |publisher = State Road Department of Florida |access-date = May 22, 2024 }}</ref> Though, when the highway was completed and opened on February 11, 1968, the State Road 84 designation and signs were placed along the entire length of the road ({{convert|101|mi|2|disp=or}}) from Naples to Fort Lauderdale.<ref name="Sullivan-Hartung"/> |
Maps in the late 1960s indicated that Alligator Alley would be designated State Road 838, a designation which runs along [[Florida State Road 838|Sunrise Boulevard]] in [[Fort Lauderdale, Florida|Fort Lauderdale]].<ref>{{cite map |author = State Road Department of Florida |title = Official State Road Map of Florida |year = 1967 |url = https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/co-gis/past_statemap/flstatemap1967.pdf?sfvrsn=df4d3c3a_0 |scale = Scale not given |location = Tallahassee |publisher = State Road Department of Florida |access-date = May 22, 2024 }}</ref> Though, when the highway was completed and opened on February 11, 1968, the State Road 84 designation and signs were placed along the entire length of the road ({{convert|101|mi|2|disp=or}}) from Naples to Fort Lauderdale.<ref name="Sullivan-Hartung"/> |
||
Two decades later, the southern extension of Interstate 75 from [[Tampa, Florida|Tampa]] was moving forward with earnest, as was the construction of Interstate 595. Because the population and traffic of southern Broward County were growing at a fast rate, Interstate 595 was being built to improve the connections between the Alley and US 1 (and improve access to [[Port Everglades]] and [[Fort Lauderdale-Hollywood International Airport]]), and the eastbound lanes of SR 84 were shifted southward to accommodate the new expressway that runs down what once was a large grassy median with limited cross-overs/turnarounds for SR 84. I-595 was opened to traffic in the mid-1980s. |
Two decades later, the southern extension of Interstate 75 from [[Tampa, Florida|Tampa]] was moving forward with earnest, as was the construction of Interstate 595. Because the population and traffic of southern Broward County were growing at a fast rate, Interstate 595 was being built to improve the connections between the Alley and US 1 (and improve access to [[Port Everglades]] and [[Fort Lauderdale-Hollywood International Airport]]), and the eastbound lanes of SR 84 were shifted southward to accommodate the new expressway that runs down what once was a large grassy median with limited cross-overs/turnarounds for SR 84. I-595 was opened to traffic in the mid-1980s. |
Revision as of 02:54, 23 May 2024
Route information | ||||
---|---|---|---|---|
Maintained by FDOT | ||||
Length | 26.24 mi[1][2][3] (42.23 km) 6.464 mi (10.40 km) in Collier County 19.776 mi (31.83 km) in Broward County | |||
Collier County section | ||||
West end | US 41 in Naples | |||
East end | SR 951 / CR 951 near Golden Gate | |||
Broward County section | ||||
West end | I-75 in Weston | |||
Major intersections | I-595 from Sunrise to Davie Florida's Turnpike / US 441 in Davie I-95 in Fort Lauderdale US 1 / SR A1A in Fort Lauderdale | |||
East end | Miami Road in Fort Lauderdale | |||
Location | ||||
Country | United States | |||
State | Florida | |||
Counties | Collier, Broward | |||
Highway system | ||||
|
State Road 84 (SR 84) is a highway in the U.S. state of Florida originally extending from Tamiami Trail (U.S. Route 41) in Naples to Federal Highway (U.S. Route 1) in Fort Lauderdale. The road now consists of two noncontiguous pieces––in Collier County as Davis Boulevard and in Broward County as Marina Mile Boulevard and highway frontage roads.
Route description
Collier County segment
A 7-mile-long section exists in Collier County, Florida, beginning at Tamiami Trail (US 41) in Naples. It travels east along Davis Boulevard, passing through the neighborhood of East Naples. This section has an eastern terminus at Collier Boulevard, signed to the north as State Road 951 and to the south as County Road 951, near Exit 101 of Interstate 75 (Alligator Alley) south of Golden Gate. East of SR / CR 951, the road is known as Beck Boulevard, an unsigned road.[4]
From 1969 until the completion of Interstate 75 in 1993, SR 84 was a primary route through Alligator Alley across the Florida peninsula.
Broward County segment
A 12-mile-long stretch in Broward County, Florida that is now primarily a service road for Interstate 595 (SR 862), with the westbound lanes adjacent to the New River Canal. The easternmost three miles (5 km) comprise a divided four-lane highway traversing a Fort Lauderdale neighborhood mostly known as Marina Mile Boulevard (though the most eastern mile of SR 84 is also known as Southeast 24th Street). The present I-595 follows the original route of SR 84 west of the split between the two roads.[5]
History
In the 1960s it was becoming apparent that Tamiami Trail was becoming insufficient to handle the rapidly growing traffic between Tampa and South Florida, and adding lanes to the road that was once considered a major engineering feat was not feasible in light of the demands of nearby Everglades National Park and the Miccosukee Tribe living near the Trail. It was finally decided that a second transpeninsular road would be best to serve the need of motorists to go from “coast to coast” south of Lake Okeechobee, the new one featuring a toll limited access two-lane expressway, the "Everglades Parkway" (the original name of the road that became better known as “Alligator Alley”).
Construction began on Alligator Alley in the early 1960s.[6] On the Naples side, the route would connect with Davis Boulevard, a local road running from US 41 to Airport Road (CR 31). Davis Boulevard was named for George Davis, one of the Naples area's first attorneys who built one of the first houses along the road near Shadowlawn Drive.[7]
Maps in the late 1960s indicated that Alligator Alley would be designated State Road 838, a designation which runs along Sunrise Boulevard in Fort Lauderdale.[8] Though, when the highway was completed and opened on February 11, 1968, the State Road 84 designation and signs were placed along the entire length of the road (101 miles or 162.54 kilometres) from Naples to Fort Lauderdale.[9]
Two decades later, the southern extension of Interstate 75 from Tampa was moving forward with earnest, as was the construction of Interstate 595. Because the population and traffic of southern Broward County were growing at a fast rate, Interstate 595 was being built to improve the connections between the Alley and US 1 (and improve access to Port Everglades and Fort Lauderdale-Hollywood International Airport), and the eastbound lanes of SR 84 were shifted southward to accommodate the new expressway that runs down what once was a large grassy median with limited cross-overs/turnarounds for SR 84. I-595 was opened to traffic in the mid-1980s.
When four-laning of Alligator Alley was completed to Interstate highway and environmental standards (several tunnels were constructed at various points under the road for the critically endangered Florida Panther), signs along the toll road identifying it as SR 84 were removed, and I-75 signs went up to replace them in early 1993. While the SR 84 could have remained the hidden designation of the road, the Florida Department of Transportation decided to supersede it with the hidden designation already in place for I-75 in most of the state: SR 93. This created the disconnection of SR 84 that exists to the present day.
Major intersections
County | Location | mi [1][2][3] | km | Destinations | Notes | ||
---|---|---|---|---|---|---|---|
Collier | Naples | 0.000 | 0.000 | US 41 north (5th Avenue) | |||
0.277 | 0.446 | Commercial Drive to US 41 south | |||||
East Naples | 1.005 | 1.617 | CR 31 (Airport–Pulling Road) | ||||
| 4.050 | 6.518 | Santa Barbara Boulevard | ||||
| 5.770 | 9.286 | CR 856 west (Radio Road) | East end of CR 856 | |||
| 6.464 | 10.403 | CR 951 south / SR 951 north (Collier Boulevard) to I-75 – Marco Island, Golden Gate | Termini of CR 951 and SR 951 | |||
Gap in route, connection made via 79.22 miles (127.49 kilometres) of I-75 | |||||||
Broward | Weston | 0.000– 0.298 | 0.000– 0.480 | I-75 / Glades Parkway south | Exit 22 on I-75 | ||
1.212 | 1.951 | I-75 / Indian Trace south – Weston, Miami | Exit 21 on I-75 | ||||
3.259 | 5.245 | Bonaventure Boulevard south | |||||
Sunrise–Weston– Davie tripoint | 3.798 | 6.112 | I-595 / Weston Road south to I-75 south – Markham Park | ||||
Davie–Plantation line | 5.804 | 9.341 | I-595 east / 136th Avenue to SR 869 (Sawgrass Expressway) | Exit 1 on I-595 | |||
6.859 | 11.038 | I-595 / SR 823 south (Flamingo Road) – Sawgrass Mills Mall | Exit 2 on I-595 | ||||
7.880 | 12.682 | I-595 / Hiatus Road | Exit 3 on I-595 | ||||
8.898 | 14.320 | I-595 / Nob Hill Road | Exit 4 on I-595 | ||||
9.950 | 16.013 | I-595 / Pine Island Road | Exit 5 on I-595 | ||||
10.917 | 17.569 | I-595 / SR 817 (University Drive) – South Florida Education Center | Exit 6 on I-595 | ||||
12.445 | 20.028 | I-595 / Davie Road south – South Florida Education Center | Exit 7 on I-595 | ||||
12.819 | 20.630 | I-595 west to I-75 / SR 869 | West end of concurrency with I-595 | ||||
13.072 | 21.037 | Florida's Turnpike – Miami, Orlando | Exit 54 on Turnpike; signed as exit 8 eastbound | ||||
Davie–Fort Lauderdale– Broadview Park tripoint | 14.070 | 22.643 | US 441 (SR 7) | Signed as exits 9A (north) and 9B (south) eastbound | |||
14.186 | 22.830 | I-595 east – Airport, Port | East end of concurrency with I-595 | ||||
Fort Lauderdale | 16.705 | 26.884 | South Fork New River drawbridge | ||||
17.722 | 28.521 | I-95 – Miami, West Palm Beach | Exit 25 on I-95 | ||||
19.720 | 31.736 | US 1 / SR A1A – Downtown, Beaches, Hollywood, Airport | |||||
19.776 | 31.826 | Miami Road / 24th Street east – Port Everglades, Convention Center | Terminus of state maintenance | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- ^ a b Florida Department of Transportation (March 8, 2013). "Straight Line Diagram of Road Inventory" (PDF). Retrieved December 25, 2015.
- ^ a b Florida Department of Transportation (August 13, 2015). "Straight Line Diagram of Road Inventory" (PDF). Retrieved December 25, 2015.
- ^ a b Florida Department of Transportation (August 14, 2015). "Straight Line Diagram of Road Inventory" (PDF). Retrieved December 25, 2015.
- ^ Google (December 25, 2015). "Florida State Road 84" (Map). Google Maps. Google. Retrieved December 25, 2015.
- ^ Google (December 25, 2015). "Florida State Road 84" (Map). Google Maps. Google. Retrieved December 25, 2015.
- ^ Sullivan-Hartung, Maureen (28 February 2013). "Alligator Alley: 45 years of connecting east and west". Florida Weekly. Retrieved 22 May 2024.
- ^ Armbruster, Mary (27 August 1983). "Just on the street where you live: History behind Naples' street names". The Naples Star. Retrieved 14 May 2024.
- ^ State Road Department of Florida (1967). Official State Road Map of Florida (PDF) (Map). Scale not given. Tallahassee: State Road Department of Florida. Retrieved May 22, 2024.
- ^ Cite error: The named reference
Sullivan-Hartung
was invoked but never defined (see the help page).