(Translated by https://www.hiragana.jp/)
Line 19 (Chengdu Metro) - Wikipedia Jump to content

Line 19 (Chengdu Metro)

From Wikipedia, the free encyclopedia
Chengdu Metro Line 19
19
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations18
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Yongyi Depot (えい义车辆段)
Wutongmiao Depot (五桐庙停车场)
Changshuncun Depot (长顺むらとま车场)
History
Opened18 December 2020; 3 years ago (2020-12-18)[1]
Technical
Line length60.139 km (37.4 mi) (in operation)
Number of tracks2
Characterunderground, some elevated
Track gauge1435
Electrificationoverhead lines, 25,000 V AC
Operating speed140km/h[2]

Line 19 of the Chengdu Metro is a metro line in Chengdu. The whole line is 62.69 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]

It was opened in 18 December 2020 as a part of Line 17 Phase 1. On September 17, 2023, original Line 17 Phase 1: (Jinxing - Jitouqiao) splits into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[4][5]

Line 19 Phase 2 will have local and express services. It will connect Chengdu Tianfu International Airport and Chengdu Shuangliu International Airport with direct express service.[6] Phase 2 has opened on 28 November 2023, of which Tianfu station will only provide interchange with line 18,[7] and will be fully open when Tianfu railway station of China Railway opens.[8]

Stations

[edit]
Service routes Station

Station name Transfer Distance
km
Borough
English Chinese
19 01 Jinxing 金星かなぼし —— 0 Wenjiang
19 02 Huangshi 黄石こうせき 4.442 4.442
19 03 Chengdu Fifth People's Hospital 医院いいん 2.935 7.377
19 04 Fengxihe 凤溪かわ 4 1.858 9.235
19 05 Wenquan Avenue 温泉おんせん大道だいどう 2.084 11.319
19 06 Mingguang 明光めいこう 1.784 13.103
19 07 Jiujiang North きゅう江北こうほく 17 6.721 19.824 Shuangliu
19 08 Longqiao Road 龙桥 3 4.477 24.301
19 09 East of Terminal 2 of Shuangliu International Airport そうりゅうつくえ场2こう站楼东  30 
10[note 1]
China Railway IPW

Chengdu Shuangliu International Airport CTU

5.604 29.905
19 10 Longgang 龙港  8  4.643 34.548
19 11 Wenjiashan ぬる家山いえやま 5.840 40.388
19 12 Muhua Road まき华路 1.457 41.845
19 13 Yixin Lake 怡心みずうみ 5 2.180 44.025 Tianfu New Area
19 14 Zhengxingwan せい兴湾 2.696 46.721
19 15 Honglian 红莲  S5  3.318 50.039
19 16 Tianfu Commercial District てんしょう务区 6 2.386 52.425
19 17 Lanjiadian 蓝家てん 2.606 55.031
19 18 Tianfu Station[note 2] てん 18
China Railway Tianfu (U/C)
5.108 60.139
Through-service to/from Tianfu International Airport North of Line 18
19 19 Hejiang[note 3] ごうこう 2.414 62.553 Tianfu New Area

Notes

[edit]
  1. ^ Out-of-system interchange via Terminal 2 of Shuangliu International Airport
  2. ^ Only interchange between Lines 18 and 19 available, no entrances and exits at the moment.
  3. ^ Hejiang station is a long-term reserved station and not operational at the moment.

References

[edit]
  1. ^ "12がつ18にち线齐发,成都せいと轨道交通こうつう运营里程りてい突破とっぱ500公里くり!".
  2. ^ "成都せいと轨道交通こうつう17ごう线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川しせん报. 2017-08-01. Retrieved 2017-08-01.
  3. ^ "成都せいと轨道交通こうつう17ごう线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川しせん报. 2017-08-01. Retrieved 2017-08-01.
  4. ^ "铁17ごう线"いち拆为" らいかいゆう哪些变化" (in Chinese).
  5. ^ "成都せいと铁19ごう线开通ざいそく 17ごう线将ざいきゅう江北こうほく站"分家ぶんけ"" (in Chinese).
  6. ^ "铁19ごう线将实现新旧しんきゅうつくえ场互联互どおり" (in Chinese). 网易. 2015-09-27. Archived from the original on 2021-01-09. Retrieved 2015-09-27.
  7. ^ "かんせん!11月28にち,19ごう线二期开通初期运营!". 27 November 2023.
  8. ^ "Chengdu Metro Line 19 Phase II is Officially Open".