Line 19 (Chengdu Metro)
Chengdu Metro Line 19 | |
---|---|
19 | |
Overview | |
Status | Operational |
Owner | City of Chengdu |
Locale | Chengdu, Sichuan |
Termini | |
Stations | 18 |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
Depot(s) | Yongyi Depot ( Wutongmiao Depot (五桐庙停车场) Changshuncun Depot (长顺 |
History | |
Opened | 18 December 2020[1] |
Technical | |
Line length | 60.139 km (37.4 mi) (in operation) |
Number of tracks | 2 |
Character | underground, some elevated |
Track gauge | 1435 |
Electrification | overhead lines, 25,000 V AC |
Operating speed | 140km/h[2] |
Line 19 of the Chengdu Metro is a metro line in Chengdu. The whole line is 62.69 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]
It was opened in 18 December 2020 as a part of Line 17 Phase 1. On September 17, 2023, original Line 17 Phase 1: (Jinxing - Jitouqiao) splits into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[4][5]
Line 19 Phase 2 will have local and express services. It will connect Chengdu Tianfu International Airport and Chengdu Shuangliu International Airport with direct express service.[6] Phase 2 has opened on 28 November 2023, of which Tianfu station will only provide interchange with line 18,[7] and will be fully open when Tianfu railway station of China Railway opens.[8]
Stations
[edit]Service routes | Station
№ |
Station name | Transfer | Distance km |
Borough | ||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
● | ● | 19 01 | Jinxing | —— | 0 | Wenjiang | |||
● | ● | 19 02 | Huangshi | 4.442 | 4.442 | ||||
● | ● | 19 03 | Chengdu Fifth People's Hospital | 2.935 | 7.377 | ||||
● | ● | 19 04 | Fengxihe | 凤溪 |
4 | 1.858 | 9.235 | ||
● | ● | 19 05 | Wenquan Avenue | 2.084 | 11.319 | ||||
● | ● | 19 06 | Mingguang | 1.784 | 13.103 | ||||
● | ● | 19 07 | Jiujiang North | 17 | 6.721 | 19.824 | Shuangliu | ||
● | ● | 19 08 | Longqiao Road | 龙桥 |
3 | 4.477 | 24.301 | ||
● | ● | ● | 19 09 | East of Terminal 2 of Shuangliu International Airport | 30 10[note 1] IPW |
5.604 | 29.905 | ||
● | ● | | | 19 10 | Longgang | 龙港 | 8 | 4.643 | 34.548 | |
● | ● | | | 19 11 | Wenjiashan | 5.840 | 40.388 | |||
● | ● | | | 19 12 | Muhua Road | 1.457 | 41.845 | |||
● | ● | | | 19 13 | Yixin Lake | 怡心 |
5 | 2.180 | 44.025 | Tianfu New Area |
● | ● | | | 19 14 | Zhengxingwan | 2.696 | 46.721 | |||
● | ● | | | 19 15 | Honglian | 红莲 | S5 | 3.318 | 50.039 | |
● | ● | | | 19 16 | Tianfu Commercial District | 6 | 2.386 | 52.425 | ||
● | ● | | | 19 17 | Lanjiadian | 蓝家 |
2.606 | 55.031 | ||
● | ● | | | 19 18 | Tianfu Station[note 2] | 18 Tianfu (U/C) |
5.108 | 60.139 | ||
↓ | ↓ | Through-service to/from Tianfu International Airport North of Line 18 | |||||||
19 19 | Hejiang[note 3] | 2.414 | 62.553 | Tianfu New Area | |||||
Notes
[edit]- ^ Out-of-system interchange via Terminal 2 of Shuangliu International Airport
- ^ Only interchange between Lines 18 and 19 available, no entrances and exits at the moment.
- ^ Hejiang station is a long-term reserved station and not operational at the moment.
References
[edit]- ^ "12
月 18日 五 线齐发,成都 轨道交通 运营里程 突破 500公里 !". - ^ "
成都 轨道交通 17号 线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese).四川 日 报. 2017-08-01. Retrieved 2017-08-01. - ^ "
成都 轨道交通 17号 线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese).四川 日 报. 2017-08-01. Retrieved 2017-08-01. - ^ "
地 铁17号 线"一 拆为二 "来 看 看 会 有 哪些变化" (in Chinese). - ^ "
成都 地 铁19号 线二 期 开通在 即 17号 线将在 九 江北 站"分家 "" (in Chinese). - ^ "
地 铁19号 线将实现新旧 机 场互联互通 " (in Chinese). 网易. 2015-09-27. Archived from the original on 2021-01-09. Retrieved 2015-09-27. - ^ "
官 宣 !11月28日 ,19号 线二期开通初期运营!". 27 November 2023. - ^ "Chengdu Metro Line 19 Phase II is Officially Open".