(Translated by https://www.hiragana.jp/)
Line 4 (Hangzhou Metro) - Wikipedia Jump to content

Line 4 (Hangzhou Metro)

From Wikipedia, the free encyclopedia
Line 4
 4 
A train of Hangzhou Metro Line 4
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations33 (32 in operation)
Service
TypeRapid transit
SystemHangzhou Metro
Operator(s)Hangzhou Metro Corporation
Depot(s)Qibao Stabling Yard
Gouzhuang Depot
Rolling stockPM082
PM174
Daily ridership422,800 (2019 Peak)
History
Opened2 February 2015; 9 years ago (2015-02-02)
Technical
Line length46.85 km (29.11 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

1
Puyan
2
Yangjiadun
3
Zhejiang Chinese Medical University
 6 
4
Lianzhuang
5
Shuicheng Bridge
6
Fuxing Road
7
Nanxingqiao
 5 
8
Yongjiang Road
9
Jinjiang
 1 
10
Chengxing Road
11
Citizen Center
 7 
12
Jiangjin Road
Line 2 interconnection
13
Qianjiang Road
 2   9 
14
Jingfang
15
Xintang
16
Xinfeng
17
East Railway Station
 1  China Railway HGH
18
Pengbu
 1 
Line 1, Qibao and Qibao Depot
19
Mingshi Road
20
Liming
21
Jianqiao Old Street
22
South Huazhong Road
23
Xintiandi Street
 3 
24
Gaotingba
25
Taoyuan Street
26
Wujiajiaogang
27
Ducheng Ecopark
28
Ping'an Bridge
29
Chuyun Road
30
Hangxing Road
 10 
31
Haoyun Street
Gouzhuang Depot
Left arrow Liangzhu – Chaoyang Right arrow
32
Jinjiadu
 2 
district
Yuhang
Xihu
33
Chihua Street

Line 4 of the Hangzhou Metro (Chinese: 杭州こうしゅう铁四ごう线; pinyin: Hángzhōu Dìtiě Sìhào Xiàn) is a rapid transit line in Hangzhou.

Description

[edit]

Phase 1

[edit]

Phase 1 of the line started operation since 2015. Running northeast–southwest, the line connects Hangzhou East railway station, Qianjiang New City and Binjiang District. Part of the line (Qianjiang Road to Shuicheng Bridge) runs along the north bank of Qiantang River.

Phase 2

[edit]

The second phase of Line 4 is 26 km in length.[1] This extension was opened on 21 February 2022.

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
Pengbu — Jinjiang 2 February 2015 9.6 km (6.0 mi) 9 Phase 1 (initial section)
Xintang 28 June 2015 Infill station 1
Jinjiang — Puyan 9 January 2018 11.2 km (7.0 mi) 7 Phase 1 (final section)
Lianzhuang 6 June 2018 Infill station 1
Pengbu — Chihua Street 21 February 2022 26 km (16 mi)[1] 14 Phase 2 (exclude Ducheng Ecopark Station)

Stations

[edit]
Legend

  - Operational
  - Under construction

Station name[2] Connections Distance
km
Location
English Chinese
Puyan うら沿 0.00 0.00 Binjiang
Yangjiadun 杨家墩 0.98 0.98
Zhejiang Chinese Medical University ちゅう药大がく  6  0.93 1.91
Lianzhuang 联庄 1.24 3.15
Shuicheng Bridge 水澄みすみ 2.23 5.38 Shangcheng
Fuxing Road 复兴 1.23 6.61
Nanxingqiao 南星なんせい  5  1.62 8.23
Yongjiang Road 甬江 1.41 9.64
Jinjiang 近江おうみ  1  1.10 10.74
Chengxing Road しろほし 1.30 12.04
Citizen Center 市民しみん中心ちゅうしん  7  0.75 12.79
Jiangjin Road こう锦路 0.65 13.44
Qianjiang Road 钱江  2   9  0.95 14.39
Jingfang けいかおる 1.45 15.84
Xintang しん 1.15 16.99
Xinfeng しん 1.25 18.24
East Railway Station 车东站  1   6 [a] 19 [a]
Hangzhou East railway station HGH
0.60 18.84
Pengbu 彭埠  1  1.10 19.94
Mingshi Road 明石あかし 4.48 24.42
Liming 黎明れいめい 1.33 25.75
Jianqiao Old Street 笕桥ろうまち 1.19 26.94
South Huazhong Road 华中みなみ 1.71 28.65 Gongshu
Xintiandi Street 新天地しんてんちがい  3  2.16 30.81
Gaotingba 皋亭坝 1.75 32.56
Taoyuan Street 桃源とうげんがい 1.46 34.02
Wujiajiaogang 吴家すみこう 1.33 35.35
Ducheng Ecopark どく城生じょうのう态公园 1.85 37.20
Ping'an Bridge 平安へいあん 1.39 38.59
Chuyun Road 储运 1.31 39.90 Yuhang
Hangxing Road くい行路こうろ  10  1.33 41.23
Haoyun Street こう运街 1.58 42.81
Jinjiadu かねわたり  2  2.19 45.00
Chihua Street いけ华街 1.75 46.75 Xihu
  1. ^ a b Out-of-station interchange with East Railway Station (East Square)
To scale map of Hangzhou Metro Line 4

Rolling stock

[edit]
Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes
PM082 B 2013-2015 CSR Nanjing Puzhen 174 (29 sets) 04 001 - 04 029 (040011-040296) Tc+Mp+M+M+Mp+Tc Gouzhuang Yard
Qibao Depot
 4 
PM174 2020-2022 CRRC Nanjing Puzhen 192 (32 sets) 04 030 - 04 061 (040301-040616)

See also

[edit]

References

[edit]
  1. ^ a b "杭州こうしゅう铁4ごう线二期又迎新进展". 2021-04-25.
  2. ^ "杭州こうしゅう人民じんみん政府せいふ关于杭州こうしゅう铁4ごう线工程こうてい、8ごう线いち工程こうてい、9ごう线一期工程车站站名的批复". 2021-03-11.