Southern Cross-Island Highway

From Wikipedia, the free encyclopedia
Provincial Highway 20 shield}}
Provincial Highway 20
だい20せん
Southern Cross-Island Highway
Route information
Maintained by Directorate General of Highways
Length208.3 km (129.4 mi)
Major junctions
West endCentral Tainan City
Major intersections Nat 8 in Xinhua
East end Prov 9 in Guanshan, Taitung
Location
CountryTaiwan
Highway system
Prov 19 Prov 21

The Southern Cross-Island Highway (Chinese: 南橫みなみよこおおやけ; pinyin: Nán Héng Gōnglù), also known as Provincial Highway No. 20, links Tainan City on the west coast to Taitung City on the east coast, on the southern section of the island of Taiwan. The road is 209 kilometres (130 mi) long.

From west to east, the road passes through the townships of Sinhua, Yujing, Jiasian, and then the aboriginal communities of Taoyuan, Meishan, and Lidao.

The highest point of the road, Yakou, is 2,722 m (8,930 ft) above sea level. The section from Meishan to Yakou Tunnel lies within Yushan National Park. Before crossing the Central Mountain Range, the road follows the Laonong River Valley for a considerable distance.

The road, considered one of South Taiwan's major tourist attractions, is sometimes damaged by landslides, especially during the wet summer months. The route was cut through the mountains in the early 1970s, but the highest sections were not properly surfaced until 1992.

This highway and its 50-metre (160 ft) surrounding used to have mountain entry control so visitors had to pay a low fee to get Class B mountain entry permits (入山にゅうざん許可きょかしょう). The mountain entry control is no longer in effect so mountain entry permits are no longer required.[1][2]

Typhoon damage and reconstruction

[edit]

The highway was badly damaged by Typhoon Morakot in 2009, with landslides washing away entire sections, and has been closed ever since. Since then there have been continuous reconstruction works. In 2012 heavy rainfall caused further damage.[3] The reopening of the entire length was not expected until end of April 2022, and that deadline was met with long queues after reopening.[4]

[edit]

See also

[edit]

References

[edit]
  1. ^ 內政警政しょ政治せいじ安全あんぜんだま訊網-いれ/山地さんち管制かんせい申請しんせい
  2. ^ 內政警政しょ政治せいじ安全あんぜんだま訊網-いれ/山地さんち管制かんせい申請しんせい
  3. ^ だい20せん南橫みなみよこおおやけ搶救工程こうてい最後さいごいちまいる もち4がつひさげはやたちじん
  4. ^ "Traffic floods Southern Cross-Island Highway after fully reopening - Focus Taiwan".