(Translated by https://www.hiragana.jp/)
Tengiz Field - Wikipedia Jump to content

Tengiz Field

Coordinates: 46°9′10″N 53°23′0″E / 46.15278°N 53.38333°E / 46.15278; 53.38333
From Wikipedia, the free encyclopedia
Tengiz Field
Tengiz Field is located in Caspian Sea
Tengiz Field
Location of the Tengiz Field on the coast of Caspian Sea
CountryKazakhstan
Offshore/onshoreOnshore
Coordinates46°9′10″N 53°23′0″E / 46.15278°N 53.38333°E / 46.15278; 53.38333
OperatorTengizchevroil
PartnersChevron Corporation (50%), ExxonMobil (25%), KazMunayGas (20%)
Field history
Discovery1979
Start of production1993
Peak year2018[citation needed][dubiousdiscuss]
Production
Current production of oil720,000 barrels per day (~3.6×10^7 t/a)
Estimated oil in place25,500 million barrels (~3.48×10^9 t)

Tengiz field (Kazakh: Теңіз мұнай кен орны, Teñız mūnai ken orny) is an oil field located in Zhylyoi District, Atyrau Region, northwestern Kazakhstan.

Geography

[edit]

The oil field is located in an area of low-lying wetlands along the northeast shores of the Caspian Sea. It covers a 2,500 km2 (970 sq mi) project license area which also includes a smaller Korolev field as well as several exploratory prospects.

Sizewise, Tengiz reservoir is 19 km (12 mi) wide and 21 km (13 mi) long.[1] Discovered in 1979, Tengiz oil field is one of the largest discoveries in recent history.[2] The city of Atyrau, 350 kilometres (220 mi) north of Tengiz, is the main transport hub of Tengiz oil. Many nations are involved in a large geopolitical competition to secure access to this source of oil.

History

[edit]

The Tengiz field, first discovered in 1979, has recoverable reserves estimated at between six billion and nine billion barrels. The field was jointly developed in 1993 as a 40-year venture between Chevron Texaco (50%), KazMunayGas (20%), US ExxonMobil (25%) and LukArco (5%). The joint venture company is known as Tengizchevroil (TCO). Chevron is the operator of the TCO field. The Tengiz oil fields entered a new phase of production with the construction of its Second Generation Project (SGP) and the introduction of sour gas injection (SGI). This onshore development, which has been in the planning and approval stage since 2002, began in 2004 and required a total investment of $7.4bn. The integrated project was completed in the second half of 2008.

Prior to its expansion in 2008, the Tengiz oilfield had 53 wells, tapping a column of crude oil around 1.6km thick. When the field was first tapped its oil pressure was 12,000psi, but in 2004 the pressure came down to 10,000psi in most areas and 8,500psi in others. The SGI project used gas injection technology to boost the pressure and increase oil recovery, while the SGP increased the number of producers (wells) and improved and expanded the crude export infrastructure.

The Tengiz field’s production of crude in 2004 was 13 million tonnes per year but the SGI and SGP production increased this to over 25 million tonnes. TCO crude oil production capacity was increased by about 80% to 540,000 barrels of crude oil, 46,000 barrels of natural gas liquids and 760 million cubic feet of natural gas.

The two projects created over 7,000 jobs in Kazakhstan and aided the development of the economy. A total investment of $20bn is envisaged for the duration of the 40 years of the Tengiz oil field venture.

Tengizchevroil intends to export more of the Tengiz field’s additional capacity via the Caspian Pipeline Consortium pipeline running the 1,500km from Tengiz to the Russian Black Sea port of Novorossiysk (thus solving the export problem from the remote Tengiz field).

Net daily production in 2019 (Chevron share) averaged 290,000 barrels of crude oil, 419 million cubic feet of natural gas and 21,000 barrels of natural gas liquid.

The integrated Future Growth Project-Wellhead Pressure Management Project (FGP-WPMP) is designed to further increase total daily production from the Tengiz reservoir and maximize the ultimate recovery of resources.

The FGP will use state-of-the-art sour gas injection technology, successfully developed and proven during TCO’s previous expansion in 2008, to increase daily crude oil production from Tengiz by approximately 260,000 barrels per day.

Kazakhstan finalized the consortium agreement with Chevron in 1993.[3] In 1997, Lukoil purchased 5% in the Tengiz project from Chevron,[4] and in 2000, Chevron built up its interest in the project to 50% by acquiring additional shares[5] from Kazakhstan.[6] In 2003, Fluor was awarded the rights[5] to develop the Second Generation Plant (SGP) and Sour Gas Injection (SGI) project, which were expected to double production.[7] In 2004, the Tengiz Consortium raised $1.1 billion in senior secured bonds to finance these two projects. These two projects were expected to finish in 2006,[8] but were delayed.[9] In October 2006, the Tengizchevroil joint venture experienced riots.[10] Shortly after in 2007, the Republic of Kazakhstan invited Maksat Idenov as First Vice President[11] of Kazmunaigas and Chairman of the Partnership Council of the Tengizchevroil Joint Venture.[12] During Idenov's tenure,[13] the SGP and SGI expansion projects (worth over $6.9 billion) were completed in the second part of 2008,[7] and stakeholder engagement began for the Future Growth Project (FGP) in 2009.[14] In 2012, TengizChevroil began the Future Growth Project (FGP), whose aim is to continue to increase the field's production.[15] In 2014, Chevron and its partners, KazMunaiGas, ExxonMobil and Lukoil began the process of selecting engineering companies to work on the engineering, procurement and construction (EPC) contract for the Future Growth Project, which will further expand the TCO oil field.[16]

Conflict

[edit]

In 2006 during the SGP project an argument between Turkish and Kazakh workers led to an outbreak of violence. 115 Turkish citizens were evacuated for medical treatment. [17]

In 2019 during the 3GP project dozens of Arab expat workers were injured during violence sparked by a photograph shared on social media.[18] Photos of the attacks on Arab expats were spread online throughout the Arab world, leading to a diplomatic dispute between Kazakhstan and several Arab countries including Jordan and Lebanon. [19]

Reserves and production

[edit]

Estimated at up to 25 billion barrels (4.0×10^9 m3) of oil originally in place, Tengiz is the sixth largest oil field in the world; recoverable crude oil reserves from Tengiz and Korolev fields combined have been estimated at 6 to 9 billion barrels (950×10^6 to 1,430×10^6 m3). Korolev field alone holds 1.5 billion barrels (240×10^6 m3) of oil making it one-sixth the size of Tengiz.[1] Like many other oil fields, the Tengiz also contains large reserves of natural gas. The field is one of the world's largest oil fields, rivaling the Gulf of Mexico in reserves of oil.[20]

Since the oil from Tengiz contains a high amount of sulfur (up to 17%), an estimated 6 million tons of sulfur byproduct were stored in the form of large sulfur blocks as of December 2002. At the time, about 4,000 tonnes a day was being added.[21] On 3 October 2007, the Kazakh environment ministry was reported to be considering imposing fines against TCO for alleged breaches in the way the sulfur is stored.[22]

In 2002, TCO produced 285,000 barrels per day (45,300 m3/d), or one third of Kazakhstan's daily production. In January 2003, after contentious negotiations with the government of Kazakhstan, the TCO consortium members initiated a $3 billion expansion project designed to boost production to approximately 450,000 barrels per day (72,000 m3/d) by 2006. In September 2008, Chevron Corporation announced that the major expansion of Tengiz field was completed and it would boost the production capacity to 540,000 barrels per day (86,000 m3/d).[23] In 2012 Chevron announced the field will see its total daily production increase by 250,000-300,000 barrels,[24] bringing production above 500,000 barrels per day.

An area of major geopolitical competition involves the routing of oil out of this oil field. Oil from the Tengiz field is primarily routed to the Russian Black Sea port of Novorossiysk through the Caspian Pipeline Consortium (CPC) project. The Baku–Tbilisi–Ceyhan pipeline is an alternative pipeline developed by U.S. and UK interests originating in the Southern Caspian which is the principal export route for crude from Azerbaijan and bypasses dependence on the Russian pipeline. In addition, Total S.A. is interested in developing a pipeline south through Iran, which is theoretically the cheapest route[25] due to the geopolitical climate involving Iran, however, the United States does not favor this route.

Environmental concerns

[edit]

The oil from Tengiz field comes out of the wells hot and at a very high pressure, believed to be the highest in the world. It also contains large proportion of gas which is rich in the compound hydrogen sulfide yielding poisonous sulfur. A 1985 explosion in which one man was killed caused a 200-metre (660 ft)-high column of fire visible from 140 kilometres (87 mi). The deadly gas made it impossible for Soviet firefighters to quickly extinguish the fire. The well burned for a period of one year and was finally capped.[2]

The government of the Kazakhstan imposed stricter guidelines for handling the sulfur.[citation needed][specify] In 2006, Kazakh government threatened TengizChevroil with imposing fines. In 2007, the government imposed a $609 million (74.4 billion tenge) fine on TengizChevroil. The violations included a slow progress in dealing with vast sulfur stocks at Tengiz. The company had reportedly been fined $71 million in 2003 for open air sulfur storage as well, which was then reduced to $7 million on an appeal.[26] According to the Environmental Protection Ministry, over 10 million tonnes of sulfur was accumulated near Tengiz oil field as a by-product of crude oil production.

Government had also set a requirement to relocate the village of Sarykamys which had 3,500 residents to new homes in the vicinity of Atyrau. The relocation program was funded by TengizChevroil and was done in 2004-2006. It cost the company $73 million.[27]

In his book Poor People, published in 2007, William T. Vollmann dedicates a significant amount of his attention to the native peoples living in Sarykamys and Atyrau and the effects of TengizChevroil's presence in these towns. Vollmann's account suggests that serious and widespread health risks were imposed upon the people of Sarykamys. Vollmann also suggests that in the corporation's efforts to displace the natives, many were not compensated fairly, so that upon being forced to move from their existing homes, they were unable to find or afford comparable housing in a new town.[28]

Geology

[edit]

The sedimentary section of the pre-Caspian basin varies between 5 km to 24 km and is dominated by the Permian Kungurian salt, which is overlain by the later (post-salt) deposits of Upper Permian, Mesozoic and Cenozoic all deformed by salt tectonics and earlier (pre-salt) Paleozoic and upper Proterozoic carbonates and terrigenous sediments.[29]: 102  Reflection seismology in 1975 revealed the Karaton tectonic uplift, which was 400 km2 in area and 1 km in relief, at a depth of 4 km.[29]: 104  An exploratory well was drilled in 1979, discovering "significant oil flow" from the middle Carboniferous carbonates overlain by Lower Permian clays and the massive Permian salt.[29]: 106 

Stratigraphy starts with the Upper Devonian Famennian Stage consisting of homogeneous biogenic limestone and some thin dolomite interbedding, followed by Lower Carboniferous deposits consisting of Tournaisian, Visean and Namurian Stage limestones.[29]: 108–109  Next comes the Middle Carboniferous Bashkirian Stage limestones, and then the Lower Permian Artinksian Stage argillaceous sediments.[29]: 108–109  The carbonate buildup is up to 4 km thick and form an angular unconformity to the overlying Permian sediments.[29]: 110 

In pop culture

[edit]

The Tengiz oil field was mentioned in the film Syriana (2005) starring George Clooney.

See also

[edit]

References

[edit]
  1. ^ a b "About TCO". Tengizchevroil.com. Archived from the original on 2015-11-17. Retrieved 2015-06-01.
  2. ^ a b Christopher Pala (2001-10-23). "Kazakhstan Field's Riches Come With a Price". Vol. 82, no. 715. The St. Petersburg Times. Archived from the original on 2013-12-28. Retrieved 2009-10-12.
  3. ^ "Tengizchevroil Fact Sheet 1H 2015". Petroleum Kazakhstan Analytical Journal. Retrieved 14 November 2015.
  4. ^ "Russia's Lukoil Buys 5% of Chevron Project". Los Angeles Times. 17 January 1997. Retrieved 14 November 2015.
  5. ^ a b "Tengiz Oil Field". A Barrel Full. Retrieved 14 November 2015.
  6. ^ "Horizons of Kazakhstan's Oil Production". Caspian Energy. Archived from the original on 17 November 2015. Retrieved 14 November 2015.
  7. ^ a b "TengizChevroil SGI/SGP Onshore Oil and Gas Projects - Project Management & Engineering". Fluor. Retrieved 14 November 2015.
  8. ^ "Fitch Assigns Tengizchevroil Expected 'BBB-' Rating". Financial CBonds Information. Retrieved 14 November 2015.
  9. ^ "Production from Tengiz Recovers in July". NEFTE Compass. Archived from the original on 1 December 2017. Retrieved 25 November 2017.
  10. ^ "Премьер-министр РК считает необходимым привлечь к ответственности виновных в конфликте на Тенгизе". Retrieved 3 August 2019.
  11. ^ "Former Shell Man Takes Top Oil Job.(Maksat Idenov appointed at Kazmunaigas)". NEFTE Compass. Archived from the original on 10 September 2016. Retrieved 25 November 2017.
  12. ^ "М. Иденов: Транспарентность - главное условие работы для инвесторов в казахстанской "нефтянке"". zakon.kz. Archived from the original on 1 December 2017. Retrieved 25 November 2017.
  13. ^ "Premier: Kazakhstan is a proved vendor of energy resources to global market". KazInform. Retrieved 9 June 2024.
  14. ^ "Tengiz Future Growth Project-Wellhead Pressure Management Project". Hydrocarbons Technology. Retrieved 25 November 2017.
  15. ^ "Tengizchevroil at the Start of the Future Growth Project". Petroleum Kazakhstan Analytical Journal. Retrieved 14 November 2015.
  16. ^ "Chevron and KMG align offers on Kazakhstan Future Growth Project". 2B1st Consulting. 23 February 2014. Retrieved 14 November 2015.
  17. ^ "workers-clash-at-kazakh-oilfield". Al Jazeera. Retrieved 25 May 2021.
  18. ^ "Dozens Injured When Brawl Erupts During Worker Protest At Kazakh Oil Field". Radio Free Europe. 29 June 2019. Retrieved 25 May 2021.
  19. ^ "Arab expats attacked in Kazakhstan after employee posts suggestive photo". France 24 Observers. Archived from the original on 8 November 2020. Retrieved 25 May 2021.
  20. ^ Kramer, Andrew E. (22 July 2010). "In Asia, a Gulf's Worth of Oil Awaits Transport". The New York Times. Archived from the original on 2015-06-10.
  21. ^ Brown, Paul (2002-12-04). "Byproduct that blights Caspian life". The Guardian. London. Retrieved 2010-05-25.
  22. ^ [1][dead link]
  23. ^ "Chevron Achieves Full Production from Tengiz Expansion Projects". OilVoice. 2008-09-25. Archived from the original on 2016-03-05. Retrieved 2010-10-24.
  24. ^ "2011 Year in Review". Tengizchevroil. 2012-02-13. Archived from the original on 2012-07-07. Retrieved 2012-10-02.
  25. ^ Yenikeyeff, Shamil (November 2008). Kazakhstan's Gas: Export Markets and Export Routes (PDF). Oxford Institute for Energy Studies. p. 18. ISBN 978-1-901795-79-0. Retrieved 2011-11-17.
  26. ^ "Chevron hit with $609m Tengiz fine". Upstream Online. NHST Media Group. 2007-10-03. Retrieved 2009-12-10.
  27. ^ "Environmental Charges Unlikely to Derail Kazakstan's Chevron Contract". Environment News Service. 2006-08-23. Archived from the original on 2010-12-27. Retrieved 2009-12-10.
  28. ^ Vollmann, William T. Poor People. Ecco, 2007. pp. 173-196.
  29. ^ a b c d e f Lisovsky, N.N., Gogonenkov, G.N., and Petzoukha, Y.A., 1992, The Tengiz Oil Field in the Pre-Caspian Basin of Kazakhstan (Former USSR) - Supergiant of the 1980s, inGiant Oil and Gas Fields of the Decade, 1978-1988, AAPG Memoir 54, Halbouty, M.T., editor, Tulsa: American Association of Petroleum Geologists, ISBN 0891813330