(Translated by https://www.hiragana.jp/)
Zhuhai–Zhuhai Airport intercity railway - Wikipedia Jump to content

Zhuhai–Zhuhai Airport intercity railway

From Wikipedia, the free encyclopedia
Zhuhai–Zhuhai Airport
intercity railway
Overview
Native nameたまつくえじょう际轨道交どうこうどおり
たまつくえ线
StatusOperational
LocaleZhuhai, Guangdong, China
Termini
Service
TypeRegional rail
SystemPearl River Delta Metropolitan Region intercity railway
Operator(s)China Railway Guangzhou Group
History
Opened18 August 2020 (Phase 1)
3 February 2024 (Phase 2)
Technical
Line length39.475 km (full line)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Zhuhai to Zhuhai Airport railway track under construction.

Zhuhai–Zhuhai Airport intercity railway, also known as the Zhuji intercity railway, is a regional railway in Zhuhai. The Phase 1 runs from Zhuhai railway station to Zhuhai Changlong railway station, while Phase 2 will terminate at Zhuhai Jinwan Airport. It is operated by China Railway Guangzhou Group. The railway is an extension of the Guangzhou–Zhuhai intercity railway.

The construction of the railway will be split into two stages: Phase 1 from Zhuhai to Zhuhai Changlong.[1] Phase 1 started operation on 18 August 2020 (except Wanzai).[2][3] Phase 2 from Zhuhai Changlong to Zhuhai Airport started operation on 3 February 2024 (except Hezhou South).[4]

In November 2022, construction of the main structure of Hezhou South Station was completed.[5]

Stations[edit]

Station Name Chinese Distance
km
Pearl River Delta intercity railway transfers/connections Metro
transfers/connections
Location
Zhuhai たまうみ 0.00 0.00  GZ  Xiangzhou
Wanzai North (Wanzaibei) a わんきた
Wanzai b わん  Taipa  (Barra station, via undersea tunnel)
Shizimen 十字じゅうじ
Hengqin North (Hengqinbei) c よこきんきた
Hengqin よこきん  Hengqin Extension 
Zhuhai Changlong たまうみ长隆[1] 16.86
Jingwan c わん[6]
Hezhou South (Hezhounan) b 鹤洲みなみ Jinwan
Sanzao East (Sanzaodong) さん灶东
Zhuhai Airport たまうみつくえ  GFJZ 

a: Suspended operation since 20 June 2022.

b: Under construction

c: Suspended operation since 26 February 2024.

References[edit]

  1. ^ a b "开始试运ぎょうたまつくえじょう际离开通远啦". Retrieved 2020-08-16.
  2. ^ "粤港澳大湾おおわんまたゆうしん线开どおりたまつくえじょう际铁开始售票". ひつじじょうばん. 2020-08-17.
  3. ^ "今日きょう开通!ちょく达珠うみよこきんりょう_澳门". www.sohu.com. Retrieved 2020-08-18.
  4. ^ "たまつくえじょう际二期隧道工程即将全面开建". SouthCN. Nanfang. Retrieved 24 March 2019.
  5. ^ "Construction completed on Hezhou South Station". cityofzhuhai.com. 21 November 2022.
  6. ^ "[广东]ひさげまえいちねんたまつくえじょう际二期三灶隧道盾构区间实现双线贯通". 2020-07-30.