14 June 2012 |
Report for Thursday June 14The south solar array panel on IS-19 was deployed on 12 June 2012, following four apogee maneuver firings on 11 June 2012. Currently, we are conducting tests to establish the performance, power level, structural integrity and operability of the south array panel. The Ku-band deflector deployment is scheduled for 18 July. |
|
4 June 2012 |
Report for Monday June 4Currently the solar array in inquiry is still not deployed. Intelsat and Space Systems/Loral, the manufacturer of the satellite, are investigating the cause and are pursuing corrective actions. Over the course of the next several days, Intelsat will execute commanded maneuvers in efforts to deploy the solar array panel. There is no immediate impact to customers, as Intelsat 19 is a replacement satellite for Intelsat 8. Intelsat 8 is currently expected to remain in service through the end of 2019. |
|
1 June 2012 |
Report for Friday June 1On 1 June 2012, Intelsat’s Satellite Engineering and Operations reported a delay in deploying one of the two solar arrays on the Intelsat 19 satellite, which was launched by Sea Launch on June 01, 2012. The spacecraft is secure at this time in geostationary transfer orbit. |