We are taking steps to continue to modernize and secure our data, applications, and systems. We completed the first phase and restored many of the functions put on pause in May 2021. Now that the first phase is complete, work will resume at a slower pace but will speed up as new systems and applications are brought online. For more information and updates, please visit our Cybersecurity Modernization Initiative web page.
General Electric Company
(Site Profile/Docket Number 172)
Location: Cincinnati/Evendale, Ohio
Also known as: Air Force Plant 36, GE, Cincinnati, GE Evendale, GE Lockland
Special Exposure Cohort Petition Information
The Special Exposure Cohort (SEC) is a unique category of employees established by The Act (42 CFR Part 83). Claims compensated under the SEC do not have to go through the dose reconstruction process. To qualify for compensation under the SEC, a covered employee must meet specific requirements (e.g., must have at least one of 22 “specified cancers,” and have worked for a specified time period at one of the SEC sites). Classes of employees and work sites can be considered for addition to the SEC through a NIOSH petition process. More information about the Special Exposure Cohort can be found on our Frequently Asked Questions page.
Open/Active SEC Petitions
To date, there are no open/active SEC petitions from General Electric Co. in Evendale, Ohio.
Class(es) Added to the SEC
-
All employees of the Department of Energy, its predecessor agencies, and their contractors and subcontractors who worked at General Electric Co. in Evendale, Ohio, from January 1, 1961 through June 30, 1970, for a number of work days aggregating at least 250 work days, occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees included in the Special Exposure Cohort
Note: This class was established by Petition 161.
Petitions Qualified for Evaluation
Below is a list of the petitions that qualified for evaluation. Select a petition on the list to view the table for that particular petition.
SEC Petitions Not Qualifying for Evaluation
One petition was received but did not qualify for evaluation because the employment period provided in the petition was not covered under The Act.
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Below are the Worker Outreach Activities for the General Electric (Ohio):
-
July 13, 2010
Meeting with International Association of Machinists and Aerospace Workers (IAMAW) Local 912, officers and retirees
Final Minutes [60 KB (9 pages)] -
May 10, 2010
Meeting with International Association of Machinists and Aerospace Workers (IAMAW) Local 912, officers and retirees
Final Minutes [60 KB (9 pages)]
Advisory Board and NIOSH Discussions on General Electric Company
The General Electric Company discussion papers listed below are working documents prepared by NIOSH or its contractor for use in discussions with the Advisory Board on Radiation and Worker Health or its Working Groups or Subcommittees. Draft, preliminary, interim, and white paper documents are not final NIOSH or Advisory Board (or their technical support and review contractors) positions unless specifically marked as such. These documents represent preliminary positions taken on technical issues prepared by NIOSH or its contractor.
The discussion papers have been reviewed to identify and redact any information that is protected by the Privacy Act 5 USC §552a and have been cleared for distribution.
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021
Public Comments on General Electric Company (Ohio) Documents
How to Submit Comments
Comments on General Electric Company (Ohio) documents can be submitted to the NIOSH Docket Officer electronically by email at nioshdocket@cdc.gov or printed comments can be mailed to:
NIOSH Docket Office
Robert A. Taft Laboratories, MS-C34
1090 Tusculum Avenue
Cincinnati, OH 45226
Please include the Site Profile/Docket Number (172) on all comments.
Comments Received
At this time, no comments have been submitted.
Document Archive for General Electric Company (Ohio)
-
SEC Petition Evaluation Report for General Electric Company (Ohio) [100 KB (21 pages)]
Approved January 22, 2010