(Translated by https://www.hiragana.jp/)
What's New On Our Site | NRC.gov

What's New On Our Site

NRC adds links to new material for a given date on government work days. Links on this page cover material added to the site this month and the prior month. For earlier material, see Previous Site Additions.

On this page:

June 2024

06-25-2024

NUREG/KM-0019

Technical and Regulatory Bases for Regulatory Guide 1.236, PWR Control Rod Ejection and BWR Control Rod Drop Accidents
06-25-2024

NUREG/CR-7267

Default Parameter Values and Distribution in RESRAD-ONSITE V7.2, RESRAD-BUILD V3.5, and RESRAD-OFFSITE V4.0 Computer Codes
06-21-2024

NUREG/BR-0254, Revision 12

Payment Methods
06-06-2024

NUREG/CR-7307

Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized- and Boiling-Water Reactors

May 2024

05-29-2024

NUREG-2180, Supplement 1, EPRI 3002028821

Determining the Effectiveness, Limitations, and Operator Response for Very Early Warning Fire Detection Systems in Nuclear Facilities – Update to Event Tree Parameters (Alpha and Pi) and Integration of NUREG-2230 Methods – Final Report
05-20-2024

NUREG-1556, Volume 2, Revision 1, Supplement 1

Program-Specific Guidance About Industrial Radiography Licenses – Final Report
05-15-2024

NUREG/CR-2907, Volume 27

Radioactive Effluents from Nuclear Power Plants: Annual Report 2021
05-06-2024

NUREG/IA-0539

New Functionality of TRACE: The 3D Post-Processing for the VESSEL Component in SALOME Platform
05-02-2024

NUREG/CR-7306, ORNL/TM-2023/2938

Fuel Assembly and Irradiation Parametric Study for Extended-Enrichment and High-Burnup Light-Water Reactor Spent Nuclear Fuel in Dry Storage Casks and Transportation Packages
05-02-2024

NUREG-0090, Volume 46

Report to Congress on Abnormal Occurrences, Fiscal Year 2023
05-01-2024

NUREG-1437 Supplement 26 Second Renewal

Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Monticello Nuclear Generating Plant, Unit 1 – Draft Report for Comment

Page Last Reviewed/Updated Tuesday, June 25, 2024