Huagong station
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Chaoyang District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 28, 2014 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Huagong Station (Chinese:
It is located in Chaoyang District southeast of the interchange of the East 4th Ring Road Middle and Guangqu Road, on the eastern side of the former Beijing Chemical Engineering 2nd Plant (
Station layout
[edit]The station has an underground island platform.
Exits
[edit]There are 4 exits, lettered A, C, and D. Exit D is accessible.
References
[edit]- ^ "Beijing opens four new subway lines". Xinhua. Retrieved 28 December 2014.
- ^
北京 市 规划委 员会关于轨道交通 7号 线沿线车站站名 命名 预案的 公示 书. Beijing Municipal Planning Committee (北京 市 规划委 员会). 2013-08-29. Archived from the original on 2015-09-23. Retrieved 2013-10-15. - ^ 华隧
参 建 北京 地 铁第一条泥水盾构隧道单线顺利贯通. 广东华隧建 设股份有限 公司 . 2013-04-17. Archived from the original on 2013-10-21. Retrieved 2013-10-15.
39°53′15″N 116°30′12″E / 39.887369°N 116.503439°E