(Translated by https://www.hiragana.jp/)
Line 5 (Dalian Metro) - Wikipedia Jump to content

Line 5 (Dalian Metro)

From Wikipedia, the free encyclopedia

Line 5
Overview
StatusOperational
OwnerDalian
LocaleDalian, Liaoning, China
Termini
Stations18
Service
TypeRapid transit
SystemDalian Metro
Operator(s)Dalian Metro Group Co., Ltd.
Depot(s)Houguancun[1]
Technical
Line length24.484 km (15.2 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 5 of the Dalian Metro (Chinese: だい连地铁5ごう线; pinyin: Dàlián Dìtiě Wǔ Hào Xiàn), is a rapid transit line and 6th Metro line in Dalian, Liaoning, China. It runs from the north to the south.[3][4] The line, with 18 stations, opened on 17 March 2023.[2]

History

[edit]

Construction of Line 5 started on 30 March 2017.[5][6]

The trial operation without passengers began on 1 December 2022.[7][1]

The line opened on 17 March 2023.[8] Labor Park station opened on 6 April 2023.[9]

Stations

[edit]
Station name Connections Distance
km
Location
English Chinese
Hutan Xinqu とら滩新 0.00 0.00 Zhongshan
Tigerbeach Park とら滩公园 1.12 1.12
Xiuyue Street しゅうがつがい 1.32 2.44
Taoyuan 桃源とうげん 0.85 3.29
Qingyun Street あおうんがい 0.86 4.15
Shikui Road いしあおい 0.91 5.06
Labor Park 劳动こう 1.17 6.23
Qingniwaqiao あおどろ洼桥  2  1.10 7.33
Dalian Railway Station だい连站  3  0.56 7.89 Xigang
Suoyuwan South 梭鱼わんみなみ 3.58 11.47 Ganjingzi
Suoyuwan 梭鱼わん  4  1.09 12.56
Ganjingzi Street あま井子いこがい 1.60 14.16
Ganbei Road あまきた 0.72 14.88
Zhonghua East Road ちゅう华东 1.79 16.67
Quanshui East 泉水せんすい 1.14 17.81
Longhua Road 龙华 1.18 18.99
Houyan きさき  3  0.94 19.93
Houguan きさき 3.55 24.48

Map


References

[edit]
  1. ^ a b "『だい连』铁5ごう线空载试运行". 1 December 2022. Archived from the original on 1 March 2023.
  2. ^ a b "だい连地铁5ごう线将于3がつ17にち10时38ふん开通运营".
  3. ^ "だい连轨道交どうこうどおり规划さいぜんしんいき!". Archived from the original on 1 March 2023. Retrieved 1 March 2023.
  4. ^ "だい连地铁 5ごう线工程こうてい". 12 August 2019.
  5. ^ "东北地区ちくくびじょうまたがうみ铁即はた正式せいしき运营". 16 March 2023.
  6. ^ "だい连地铁5ごう线开こう ども设18车站". 1 April 2017. Archived from the original on 1 March 2023.
  7. ^ だい连发ぬの (1 December 2022). "こんてん铁5ごう线空载试运行". Archived from the original on 1 March 2023.
  8. ^ "だい连地铁5ごう线将于3がつ17にち10时38ふん开通运营".
  9. ^ "铁5ごう线劳动公园站明日あした开通使用しよう". 5 April 2023. Retrieved 5 April 2023. 铁5ごう线劳动公园站はた于4がつ6にち开通使用しよう