Qingheying station
Appearance
Beijing Subway station | |||||||||||
General information | |||||||||||
Location | Interchange between Shui'an South Street ( Qingheying Village, Laiguangying, Chaoyang District, Beijing People's Republic of China | ||||||||||
Coordinates | 40°03′00″N 116°26′09″E / 40.04996°N 116.43575°E | ||||||||||
Managed by | Beijing MTR | ||||||||||
Line(s) |
| ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2023 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Qingheying station (Chinese:
Location
[edit]The station is located under the interchange between Shui'an South Street (
Station layout
[edit]The station is an underground station with 1 island platformwith a total length of 360 metres and a total width of 21.1 metres.[citation needed]
There are 4 exits, lettered A, B, C and D. Exits A and D lead to Shui'an South Street, B and C to Beiyuan East Road. Exits A and C are accessible.
-
Concourse [1]
-
Concourse [2]
References
[edit]- ^ "
地 铁17号 线北段 等 三条 地 铁线(段 )开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 2023-12-29. Retrieved 2023-12-29.2023
年 12月30日 (周 六 )首班 车起,地 铁17号 线北段 (工 人 体育 场—未来 科学 城北 )、16号 线剩余 段 (榆树庄 —宛 平城 )及苏州 街 站、11号 线西段 剩余 段 (金安 桥—模 式 口 )开通试运营 - ^ "
北京 地 铁17号 线北段 计划今年 底 开通试运营_中新 社 _北京 分社 ". www.bj.chinanews.com.cn (in Simplified Chinese). Retrieved 2023-12-18. - ^ "
地名 公告 " (in Simplified Chinese). 2023-07-01. Archived from the original on 2023-07-01. Retrieved 2023-12-19. - ^ "轨道
交通 17号 线、19号 线一 期 、昌平 线南延 一期工程沿线车站命名预案" (PDF) (in Simplified Chinese).