Rumoi Main Line
Rumoi Main Line | |||
---|---|---|---|
Overview | |||
Status | In operation | ||
Owner | JR Hokkaido | ||
Locale | JR Hokkaido | ||
Termini | |||
Stations | 5 | ||
Service | |||
Type | Regional rail | ||
Operator(s) | JR Hokkaido | ||
Rolling stock | KiHa 54 series DMU, KiHa 150 series DMU | ||
History | |||
Opened | 23 October 1910 | ||
Closed | 5 December 2016 (Rumoi–Mashike) 1 April 2023 (Ishikari-Numata–Rumoi) March 2026 (entire line) (planned) | ||
Technical | |||
Line length | 14.4 km (8.9 mi) | ||
Number of tracks | Entire line single tracked | ||
Character | Rural | ||
Track gauge | 1,067 mm (3 ft 6 in) | ||
Electrification | None | ||
Operating speed | 95 km/h (59 mph) | ||
|
The Rumoi Main Line (
On 19 November 2016, JR Hokkaido's president announced plans to further rationalize the network by up to 1,237 km (769 mi), or approximately 50% of the network,[1] including closure of the remaining section of the Rumoi Main Line (the Rumoi to Mashike section closed on 5 December 2016). This section of track from Ishikari-Numata to Rumoi was closed on 1 April 2023, with the final train running on the 31 March 2023.
Stations[edit]
Stops legend: ●: All trains stop, ◆: some trains skip bidirectionally, ▼: some down trains skip
No. | Station name | Japanese | Between (km) |
Distance (km) |
Stop | Transfers | Location |
---|---|---|---|---|---|---|---|
A24 | Fukagawa | 0.0 | ● | ■ Hakodate Main Line | Fukagawa | ||
Kita-Ichiyan | 3.8 | 3.8 | ▼ | ||||
Chippubetsu | 5.0 | 8.8 | ▼ | Chippubetsu, Uryū District | |||
Kita-Chippubetsu | 2.4 | 11.2 | ◆ | ||||
Ishikari-Numata | 3.2 | 14.4 | ● | Numata, Uryū District |
Closed section[edit]
Station name | Japanese | Between (km) |
Distance (km) |
Location |
---|---|---|---|---|
Mappu | 3.4 | 17.8 | Numata, Uryū District | |
Ebishima | 2.9 | 20.7 | ||
Tōgeshita | 7.6 | 28.3 | Rumoi | |
Horonuka | 6.2 | 34.5 | ||
Fujiyama | 5.5 | 40.0 | ||
Ōwada | 4.2 | 44.2 | ||
Rumoi | 5.9 | 50.1 | ||
Segoshi | 2.1 | 52.2 | ||
Reuke | 4.0 | 56.2 | ||
Afun | 1.3 | 57.5 | Mashike, Mashike District | |
Nobusha | 2.7 | 60.2 | ||
Shaguma | 0.8 | 61.0 | ||
Shumombetsu | 1.7 | 62.7 | ||
Hashibetsu | 1.3 | 64.0 | ||
Mashike | 2.8 | 66.8 |
History[edit]
The initial section of the line, between Fukagawa and Rumoi opened on 23 October 1910, and was extended to Mashike on 5 November 1921.[2] The line was reclassified as a "main line" from 10 October 1931.[2] With the privatization of Japanese National Railways (JNR) on 1 April 1987, the line came under the control of JR Hokkaido.[2]
Closure plans[edit]
On 10 August 2015, JR Hokkaido informed the mayors of Rumoi and Mashike of its plans to close the 16.7 km (10.4 mi) section of the line from Rumoi to Mashike in 2016.[3] In April 2016, it was officially announced that the section from Rumoi to Mashike would close, and the last service operated on 4 December of that year.[4]
The 4 towns and cities along the remaining line, Rumoi, Numata, Chippubetsu and Fukagawa were in discussion with JR Hokkaido regarding the line's future, but Rumoi left the group as the city was already well-equipped so they didn't see keeping the railway open as necessary.
In September 2022, JR Hokkaido submitted a proposal to the Ministry of Land, Infrastructure, Transport and Tourism to close an additional 35.7 km (22.2 mi) between Ishikari-Numata and Rumoi.[5][6] As the closure was approved on 9 December 2022,[7] the end of service was announced for 31 March 2023, and the closure occurred on 1 April 2023.[8][9]
The remaining 14.4 km (8.9 mi) section to Fukagawa is slated to be closed in March 2026.[6]
References[edit]
- ^ "JR Hokkaido says it can't maintain half of its railways". 10 May 2013. Archived from the original on 20 November 2016. Retrieved 26 November 2016.
- ^ a b c Ishino, Tetsu, ed. (1998).
停車場 変遷 大 辞典 国鉄 ・JR編 [Station Transition Directory - JNR/JR] (in Japanese). Vol. I. Japan: JTB. pp. 83, 129. ISBN 4-533-02980-9. - ^
留萌 線 (留萌 ~増毛 間 )の鉄道 事業 廃止 について [Closure of Rumoi Line between Rumoi and Mashike]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing Co., Ltd. 10 August 2015. Archived from the original on 8 December 2015. Retrieved 11 August 2015. - ^ JR
留萌 線 留萌 ―増毛 間 12月 4日 に廃止 増毛 町 が同意 [Mashike agrees to closure of JR Rumoi Line between Rumoi and Mashike on 4 December]. Doshin Web (in Japanese). Japan: The Hokkaido Shimbun Press. 8 April 2016. Archived from the original on 8 April 2016. Retrieved 14 April 2016. - ^ "JR
北海道 ,留萌 本線 石狩沼田 —留萌 間 の鉄道 事業 廃止 届 を提出 " [JR Hokkaido Rumoi Main Line Ishikari-Numata - Rumoi service discontinuation proposal submitted]. Japan Railfan Magazine Online (in Japanese). 10 September 2022. Archived from the original on 11 September 2022. Retrieved 14 September 2022. - ^ a b "
留萌 本線 「一部 廃止 」来春 にも JR北海道 が国交 相 に届出 、残 る区間 も3年 半 後 まで" [Rumoi Main Line "Partially abolished": JR Hokkaido will notify the Minister of Land, Infrastructure, Transport and Tourism next spring, and the remaining section will be closed 3 and a half years later]. news.railway-pressnet.com (in Japanese). 9 September 2022. Archived from the original on 9 September 2022. Retrieved 14 September 2022. - ^ "
留萌 本線 の一部 廃止 「来年 4月 1日 」確定 朝 ドラ『すずらん』明日 萌 駅 も消滅 |鉄道 ニュース【鉄道 プレスネット】" (in Japanese). 9 December 2022. Retrieved 13 December 2022. - ^ "
鉄道 事業 の一部 廃止 の日 を繰 り上 げる届出 について" (PDF).国土 交通省 北海道 運輸 局 鉄道 部 . Archived from the original (PDF) on 9 December 2022. Retrieved 17 February 2023. - ^ "
留萌 線 (石狩沼田 ・留萌 間 )の廃止 日 繰上 げの届出 について" (PDF).北海道旅客鉄道 . Archived from the original (PDF) on 9 December 2022. Retrieved 17 February 2023.