(Translated by https://www.hiragana.jp/)
Line 12 (Shanghai Metro) - Wikipedia Jump to content

Line 12 (Shanghai Metro)

From Wikipedia, the free encyclopedia
(Redirected from Hongmei Road station)

Line 12
Dalian Road station line 12 platform
Overview
Other name(s)M2 (planned name);
Minpu line
Native name上海しゃんはい铁12ごう线
StatusOperational
OwnerShanghai Rail Transit Line 12 Development Co., Ltd.
LocalePudong; Yangpu, Hongkou, Jing'an, Huangpu, Xuhui, and Minhang districts, Shanghai, China
Termini
Stations32
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
ServicesMainline: Qixin RoadJinhai Road; Partial Mainline: Hongmei Road ↔ Jufeng Road
Operator(s)Shanghai No. 4 Metro Operation Co. Ltd.
Depot(s)Zhongchun Road parking lot;
Jinqiao parking lot
Rolling stock75 Class A 6-car trains
Daily ridership826,000 (2019 Peak)[1]
History
CommencedDecember 30, 2008; 15 years ago (2008-12-30)
OpenedDecember 29, 2013; 10 years ago (2013-12-29)
Last extensionDecember 19, 2015; 8 years ago (2015-12-19)
Technical
Line length40.4 km (25.10 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)
Average speed: 28.5 km/h (18 mph)
SignallingALSTOM Urbalis CBTC
Route map
To scale geographic map:

Line 12 is an east–west line of the Shanghai Metro network. It runs from Jinhai Road in Pudong to Qixin Road in Minhang District. The first section from Tiantong Road to Jinhai Road opened on 29 December 2013,[2] and additional stations up to Qufu Road were in operation by 10 May 2014.[3] The remaining stations opened on 19 December 2015.[4][5] Since the opening of the extension in December 2015, Line 12 has the most interchanges with other metro lines in the Shanghai Metro.[6] The line is colored forest green on system maps.

History[edit]

Shanghai metro line 12 opening history
Segment Commencement Opened Length Station(s) Name Investment
Tiantong Road — Jinhai Road 30 Dec 2008 29 Dec 2013 17.5 km (10.87 mi) 15 Initial phase (1st section) ¥23.399 billion
Qufu Road — Tiantong Road 30 Dec 2008 10 May 2014 1.1 km (0.68 mi) 1 Initial phase (1st section)
Qixin Road — Qufu Road 30 Dec 2008 19 Dec 2015 21.8 km (13.55 mi) 16 Initial phase (2nd section)
Dongjing — Qixin Road 16 Dec 2022 exp 2027 17.2 km (10.69 mi) 6 Western extension

Construction accident[edit]

On December 31, 2012, the ground maintenance warehouse of Jinqiao Parking Lot collapsed during the construction process, resulting in 5 deaths and 18 injuries.[7]

Stations[edit]

Service routes[edit]

Shanghai metro line 12 service routes
Routes Station name Connections Distance Location Open-
ing
Plat-
form[8]
M P English Chinese km min
Dongjing ほら  9  0.00 0.00 Songjiang West extension under construction
Liuwu Highway 刘五おおやけ 1.91 1.91
Husong Highway 沪松おおやけ 1.96 3.87
Hi-Tech Park 科技かぎ 5.36 9.23
Changxi Road 场西 1.44 10.67
Changdong Road 场东 1.78 12.45
Qixin Road なな莘路 4.73 17.18 0 Minhang 19 Dec
2015[9]
Underground Island
Hongxin Road にじ莘路 1.73 18.91 4
Gudai Road 顾戴 1.23 20.14 6
Donglan Road 东兰 1.87 22.01 9
Hongmei Road にじうめ 0.69 22.70 11
Hongcao Road にじこげ 1.42 24.12 14 Xuhui
Guilin Park かつらはやしこう  15  0.83 24.95 16
Caobao Road こげたから  1  1.55 26.50 19
Longcao Road 龙漕  3  0.84 27.34 21
Longhua 龙华  11  1.04 28.38 24
Middle Longhua Road 龙华中路なかじ  7  1.35 29.73 26 Underground Side
Damuqiao Road 大木たいぼく桥路  4  1.57 31.30 29 Underground Island
Jiashan Road よしみぜん  9  1.01 32.31 31
South Shaanxi Road 西南せいなん  1   10  1.49 33.80 34 Huangpu
West Nanjing Road 南京なんきん西にし  2   13 [i] 1.40 35.20 37 Jing'an
Hanzhong Road 汉中  1   13  1.48 36.68 40
Qufu Road きょく阜路  8  1.24 37.92 43 10 May
2014[10]
Tiantong Road てん潼路  10  1.04 38.96 45 29 Dec
2013[11]
Underground Side
International Cruise Terminal くに际客运中心ちゅうしん 1.69 40.65 49 Hongkou
Tilanqiao ひさげ篮桥 0.98 41.63 51 Underground Island
Dalian Road だい连路  4  0.79 42.42 53 Yangpu
Jiangpu Park 江浦えうらこう  18  1.29 43.71 55
Ningguo Road 宁国 0.91 44.62 58
Longchang Road 隆昌りゅうしょう 1.42 46.04 61 Underground Side
Aiguo Road 爱国 0.92 46.96 63 Underground Island
Fuxing Island 复兴岛 0.82 47.78 65
Donglu Road 东陆 1.70 49.48 68 Pudong
Jufeng Road 巨峰きょほう  6  1.09 50.57 71
North Yanggao Road 杨高きた 1.27 51.84 74
Jinjing Road きむきょう 1.16 53.00 76
Shenjiang Road さる 1.14 54.14 78
Jinhai Road きむ海路かいろ  9  2.53 56.67 83 Underground Side
  1. ^ Virtual transfer with line 2 or line 13 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.


Important Stations[edit]

Future expansion[edit]

West extension[edit]

In June 2021 Songjiang's Party secretary announced that a five station 17.3 km (10.7 mi) west extension to Dongjing on line 9 will start construction within the year.[12] Construction began on December 16, 2022 with six stations planned on the extension, all in Shanghai's Songjiang District.[13]

Station name change[edit]

Headways[edit]

Shanghai metro line 12 headway[14]
Time Qixin Road -
Hongmei Road
Hongmei Road -
Jufeng Road
Jufeng Road -
Jinhai Road
Monday - Friday (Working Days)
AM peak 7:30–9:30 About 5 min About 2 min and 30 sec About 5 min
Off-peak 9:30–16:30 About 6 min
PM peak 16:30–20:00 About 7 min and 30 sec About 3 min and 45 sec About 7 min and 30 sec
Other
hours
Before 7:30
After 20:00
About 6 - 8 min
Saturday and Sunday (Weekends)
Peak 8:00–19:00 6 min
Other
hours
Before 8:00
After 19:00
8 - 10 min

Technology[edit]

Rolling Stock[edit]

The trains of Line 12 are composed of 6-carriage of Class A cars, with a design speed of 80 km/h (50 mph), VVVF AC drive, and a design life of 30 years.

Shanghai metro Line 12 Rolling stock
Fleet numbers Manufacturer Time of
manufac-
turing
Class No
of
car
Assembly[i] Rolling stock Number Notes
246 Bombardier Movia 456 2011-2013 A[ii] 6 Tc+Mp+M+M+Mp+Tc 12A01 1201-1241
(120011-122461)
Original name: AC09B.
Same as 07A01 and 09A02 (but different painting).
90 Bombardier Movia 456 2017-2018 A[ii] 6 Tc+Mp+M+M+Mp+Tc 12A02 1242-1256
(122471-123361)
114 CNR Changchun Railway Vehicles Co., Ltd. 2018-2020 A[ii] 6 Tc+Mp+M+M+Mp+Tc 12A03 12057-12075
(123371-124501)
USB charging ports (concealed design).
  1. ^ Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. ^ a b c Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.

Future Rolling Stock[edit]

Shanghai Metro Line 12 future rolling stock
Fleet numbers Manufacturer Time of
manufac-
turing
Class No
of
car
Assembly[i] Rolling stock Number Notes
108 TBA 2026-2027 A[ii] 6 Tc+Mp+M+M+Mp+Tc 12A04 12076-12093
(124511-125581)
  1. ^ Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. ^ Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.

References[edit]

  1. ^ "Metro breaks records" (in Chinese). Shanghai Metro. 9 March 2019. Retrieved 9 March 2019.
  2. ^ "Eye-catching stations highlight of Metro Line 12". Eastday. 18 December 2013. Archived from the original on 24 December 2013. Retrieved 22 December 2013.
  3. ^ Xu, Huili (23 May 2014). "Qufu Rd. Station of Metro Line 12 Opens on May 10". Graphics by Zuo Rongliang. Shanghai Shentong Metro Group. Retrieved 12 November 2015.
  4. ^ Chen, Lydia (30 December 2008). "Metro Line 12 to connect Minhang and Pudong". Shanghai Daily. Archived from the original on 13 December 2009. Retrieved 27 December 2009.
  5. ^ Xu, Huili; Qu, Chunliang (2 November 2015). "Metro Lines 12, 13 Adjust Departure Time of First, Last Trains from Oct. 24". Graphics by Ji Zhoujie. Shanghai Shentong Metro Group. Retrieved 12 November 2015.
  6. ^ Zhang, Ningniing (18 December 2015). "Metro network adds 27 stations". Shanghai Daily. Retrieved 11 January 2016.
  7. ^ The collapse of the construction site of Shanghai Metro Line 12 by a tower crane has caused 5 deaths and 18 injuries. 2013-02-09
  8. ^ 指南しなん > Stationしんいき. Shanghai Metro Official Site. Retrieved 17 December 2015. Instructions: てん击相应线,选择Station,てん击"站层图"查看しょう应Stationてき站台结构。
  9. ^ 上海しゃんはい铁运かん中心ちゅうしん (17 December 2015). 12月19にちおこり 11、12、13ごう线新延伸えんしんだんたてしげる试运营. Shanghai Metro Official Site. Retrieved 17 December 2015.
  10. ^ 12ごう线曲阜路站5がつ10日とおかおこり开站. Shanghai Metro Official Site. 5 May 2014.
  11. ^ 12ごう线、16ごう线12がつ29にちおこり载客试运营. Shanghai Metro Official Site. 27 December 2013.
  12. ^ Songjiang's development full steam ahead
  13. ^ "设6站、ぜん长17.27公里くり!轨道交通こうつう12ごう线西延伸えんしん工程こうてい正式せいしき开工けん设". Information Office of Shanghai Municipality. Retrieved 16 December 2022.
  14. ^ "Schedule" (in Chinese). Shanghai Metro. 7 July 2021. Retrieved 7 July 2021.