Line 11 (Shanghai Metro)
Line 11 | |
---|---|
![]() | |
Qilianshan Road Station | |
Overview | |
Other name(s) | R3 (planned name); Shenjia line (Chinese: |
Native name | |
Status | Operational |
Owner | Shanghai Rail Transit Shenjia Line Development Co., Ltd. (Shanghai segment) Kunshan Rail Transit Investment Development Co., Ltd. (Kunshan segment) |
Locale | Pudong; Xuhui, Changning, Putuo, and Jiading districts, Shanghai, China Kunshan, Jiangsu, China |
Termini | |
Stations | 39 (plus reserve station Yanyu Road) |
Service | |
Type | ![]() |
System | ![]() |
Services | Mainline: Disney Resort ↔ North Jiading Branchline: Disney Resort ↔ Huaqiao |
Operator(s) | Shanghai No. 2 Metro Operation Co. Ltd. |
Depot(s) | Shanghai Circuit Depot; North Jiading parking lot; Chuanyang River parking lot |
Rolling stock | 82 Class A 6-car trains |
Daily ridership | 1.012 million (2019 peak)[1] |
History | |
Commenced | December 30, 2005 |
Opened | December 31, 2009 |
Last extension | April 26, 2016 |
Technical | |
Line length | 82.4 km (51.20 mi) |
Number of tracks | 2 |
Character | Underground, open cut + elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts DC) |
Operating speed | 100 km/h (62 mph) Average speed: 40.3 km/h (25 mph)[citation needed] (mainline) 38.8 km/h (24 mph)[citation needed] (branchline) |
Signalling | Thales’ SelTracTM CBTC |
Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013, Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. [citation needed]With a single-line mileage of 82.386 kilometres (51.192 mi), it is the second-longest single-line subway line in China, after Line 6 in Chongqing, which is 85.6 km (53.2 mi) long. The line is colored brown on system maps.
History[edit]
The line 11 was originally planned to be from Jiading to Nanhui New City, with a total length of 120 kilometres (75 mi), the south part of the line has been transferred to line 16.
The 1st phase of line 11, which runs from North Jiading to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]
The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]
The 3rd phase connects Luoshan Road and the Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]
From January 26, 2020 until March 24,[8] the Kunshan section of line 11 (Anting to Huaqiao) was suspended due to the COVID-19 pandemic.[9]
On August 25, 2020, an infill station Chenxiang Highway was opened.[10]
On February 14, 2022, the Kunshan section of line 11 was again suspended due to the COVID-19 pandemic.[11] It was reopened on the 4th of July, 2022. [12]
Shanghai Metro Line 11 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
Jiangsu Road — North Jiading | 30 Dec 2005 | 31 Dec 2009 | 33.0 km (20.51 mi) | 16 | Phase 1 (main section) | ¥18.95 billion |
Jiading Xincheng — Anting | 30 Dec 2005 | 29 Mar 2010 | 12.8 km (7.95 mi) | 3 | Phase 1 (branch section) | |
East Changji Road | 26 Apr 2011 | Infill station | 1 | |||
Luoshan Road — Jiangsu Road | 19 Dec 2008 | 31 Aug 2013 | 19.2 km (11.93 mi) | 12 | Phase 2 | ¥12.965 billion |
Anting — Huaqiao | 27 Oct 2010 | 16 Oct 2013 | 7.0 km (4.35 mi) | 3 | Huaqiao extension | ¥1.849 billion |
Kangxin Highway — Luoshan Road | 28 May 2013 | 19 Dec 2015 | 4.10 km (2.55 mi) | 2 | Disney extension (1st section) | ¥4.371 billion |
Disney Resort — Kangxin Highway | 28 May 2013 | 26 Apr 2016 | 5.08 km (3.16 mi) | 1 | Disney extension (2nd section) | |
Chenxiang Highway | 25 Aug 2020 | Infill station | 1 | |||
Controversy[edit]
Due to the long length of line 11 and high passenger volumes, it is common for line 11 passengers to be forced to stand on the train for their entire trip. In response to this, around early 2014, some passengers that travelled long distances between urban area and the suburban areas of Jiading or Sanlin that cannot bear standing for a long time started bringing their own small folding seats into the carriages. In the following years, the official Weibo of Shanghai Metro reminded passengers involved phenomenon to be safe and civilized as Shanghai Metro maintains that these foldable seats can be a safety hazard on trains and reduces capacity. Beginning in 2019, line 11 started having announcements in carriages to remind passengers to not bring and use their own seats on the train.[13][14]
Stations[edit]
Service routes[edit]
Shanghai Metro Line 11 service routes | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||
Routes | Station name | Connections | Distance | Location | Opening | Platform[15] | ||||
M | P | English | Chinese | km | min | |||||
Mainline | ||||||||||
◕ | ◕ | Disney Resort | 0.00 | 0.00 | 0 | Pudong | 26 April 2016[16] | Underground Island[17] | ||
◕ | ◕ | Kangxin Highway | 5.08 | 5.08 | 5 | 19 Dec 2015[18] | Elevated Side | |||
◕ | ◕ | Xiuyan Road | 2.32 | 7.40 | 8 | |||||
◐ | ◐ | Luoshan Road | 罗山 |
16 | 1.78 | 9.18 | 11 | 31 Aug 2013[19] | Elevated Island | |
◐ | ◐ | Yuqiao | 18 | 2.51 | 11.69 | 14 | Underground Island | |||
| | | | Kangheng Road | 1.73 | 13.42 | 17 | 1 Oct 2024 | Underground Island | |||
◐ | ◐ | Pusan Road | 1.46 | 14.88 | 19 | 31 Aug 2013[19] | Underground Side | |||
◐ | ◐ | East Sanlin | 1.58 | 16.46 | 21 | Underground Island | ||||
● | ● | Sanlin | 1.21 | 17.67 | 23 | Underground Double Island | ||||
● | ● | Oriental Sports Center | 东方 |
6 8 | 3.13 | 20.8 | 28 | Underground Double Island (shared with 6 ) | ||
● | ● | Longyao Road | 龙耀 |
2.14 | 22.94 | 31 | Xuhui | Underground Island | ||
● | ● | Yunjin Road | 0.76 | 23.70 | 33 | |||||
● | ● | Longhua | 龙华 | 12 | 1.01 | 24.71 | 35 | |||
● | ● | Shanghai Swimming Center | 1.39 | 26.10 | 38 | |||||
● | ● | Xujiahui | 1 9 | 1.85 | 27.95 | 41 | ||||
● | ● | Jiao Tong University | 10 | 0.88 | 28.83 | 43 | Changning | |||
● | ● | Jiangsu Road | 2 | 2.08 | 30.91 | 46 | 31 Dec 2009[20] | |||
● | ● | Longde Road | 13 | 1.35 | 32.26 | 49 | Putuo | |||
● | ● | Caoyang Road | 曹杨 |
3 4 14 [i] | 0.98 | 33.24 | 51 | Underground Double Island[ii] | ||
● | ● | Fengqiao Road | 枫桥 |
0.81 | 34.05 | 53 | Underground Island | |||
● | ● | Zhenru | 14 | 1.05 | 35.10 | 55 | Underground Side & Island | |||
● | ● | Shanghai West Railway Station | 15 ![]() |
1.35 | 36.45 | 57 | Underground Island | |||
● | ● | Liziyuan | 1.45 | 37.90 | 60 | |||||
● | ● | Qilianshan Road | 祁连 |
1.35 | 39.25 | 62 | ||||
● | ● | Wuwei Road | 1.32 | 40.57 | 65 | |||||
● | ● | Taopu Xincun | 1.59 | 42.16 | 67 | |||||
● | ● | Nanxiang | 3.13 | 45.29 | 71 | Jiading | Elevated Side & Island | |||
◑ | ◑ | Chenxiang Highway | 陈翔 |
2.36 | 47.65 | 74 | 25 Aug 2020[21] | Elevated Side | ||
◑ | ◑ | Malu | 马陆 | 3.40 | 51.05 | 78 | 31 De 2009[20] | |||
◑ | ◑ | Jiading Xincheng | 2.90 | 53.95 | 82 | Elevated Side & Island | ||||
Mainline | ||||||||||
◔ | | | Baiyin Road | 1.89 | 55.84 | 84 | Jiading | 31 Dec 2009[20] | Elevated Side | ||
◔ | | | West Jiading | 3.29 | 59.13 | 88 | Elevated Island | ||||
◔ | | | North Jiading | 1.94 | 61.07 | 91 | Elevated Side | ||||
Branchline | ||||||||||
◔ | Shanghai Circuit | 3.15 | 64.22 | 86 | Jiading | 29 March 2010[22] | Open-cut Side | |||
◔ | East Changji Road | 5.27 | 69.49 | 91 | 26 April 2011[23] | At-grade Side | ||||
◔ | Shanghai Automobile City | 2.25 | 71.74 | 94 | 29 March 2010[22] | Elevated Side | ||||
◔ | Anting | 1.84 | 73.58 | 97 | Elevated Island | |||||
◔ | Zhaofeng Road | 1.12 | 74.70 | 100 | Kunshan, JS | 16 Oct 2013[24] | ||||
◔ | Guangming Road | 3.29 | 77.99 | 104 | Elevated Side | |||||
◔ | Huaqiao | ![]() |
1.27 | 79.26 | 107 | |||||
Passengers going to Huaqiao at Disney Resort Station, Kangxin Highway Station and Xiuyan Road Station during rush hour have to transfer at Jiading Xincheng Station.
| ||||||||||
Future expansions[edit]
Kangheng Road station[edit]
Although Kangheng Road station is part of the second phase of Line 11, it did not open with the other stations on August 31, 2013.[25] Instead, it has been left as a reserved station under construction that will open in the future pending development in the area.[26][27] It is expected to open on 1 October 2024.
Station name change[edit]
- On May 7, 2011, Jiyang Road was renamed Oriental Sports Center (before line 11 began serving the station).
Headways[edit]
Shanghai Metro Line 11 headway[28] | |||||||
---|---|---|---|---|---|---|---|
Time | North Jiading - Jiading Xincheng & Huaqiao - Jiading Xincheng |
Jiading Xincheng - Nanxiang |
Nanxiang - Luoshan Road |
Luoshan Road - Disney Resort | |||
Monday - Friday (Working Days) | |||||||
AM peak | 7:30-9:00 | Southbound: 6 - 10 min Northbound: 7 min and 30 sec - 10 min |
Southbound: 3 min Northbound: 3 min and 45 sec |
Southbound: 2 min Northbound: 2 min and 30 sec |
Southbound: 6 min Northbound: 7 min and 30 sec | ||
Off-peak | 9:00–17:00 | About 12 min | About 6 min | ||||
PM peak | 17:00–19:00 | Southbound: 7 min Northbound: 6 min |
Southbound: 3 min and 30 sec Northbound: 2 min and 30 sec |
Southbound: 7 min Northbound: 6 min | |||
Other hours |
|
About 12-18 min | About 5 – 7 min | ||||
Saturday and Sunday (Weekends) | |||||||
Peak | 8:00–20:00 | 10 min | About 5 min | ||||
Other hours |
|
About 10-12 min | About 6-8 min | ||||
Technology[edit]
Rolling Stock[edit]
Shanghai Metro Line 11 rolling stock | ||||||||
---|---|---|---|---|---|---|---|---|
Fleet numbers | Manufacturer | Time of manufac- turing |
Class | No of car |
Assembly[i] | Rolling stock | Number | Notes |
396 | CRRC Zhuzhou Locomotive Co., Ltd. | 2008-2011 | A[ii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A01 | 1101-1166 (110011-113961) |
[29] Some of the trains are Disney-themed trains, and the inside and outside of the trains are packaged with Disney cartoon elements. Original name: AC16. |
36 | CNR Changchun Railway Vehicles Co., Ltd. | 2015-2016 | A[ii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A02 | 1167-1172 (113971-114321) |
|
60 | CRRC Zhuzhou Locomotive Co., Ltd. | 2015-2016 | A[ii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A03 | 1173-1182 (114331-114921) |
|
-
11A01 train
References[edit]
- ^ 【 1329.4
万 人 次 】3月 8日 上海 地 铁客流 创历史 新高 (in Chinese). Shanghai Metro. 2019-03-09. Retrieved 2019-03-09. - ^ "International Railway Journal - Rail and Rapid Transit Industry News Worldwide". Archived from the original on 2009-01-22. Retrieved 2008-11-11.
- ^ "沪轨交9
号 线二 期 、11号 线北段 一 期 31日 开通试运营". - ^ 11
号 线支线下周 一 试运营, news.163.com. Retrieved 28 March 2010. - ^ "Metro extension to open next year".
- ^
上海 市 城市 快速 轨道交通 近 期 建 设规划(2010-2020年 )环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06. - ^ "
上海 地 铁迪士 尼 站下周 二 开站末 班 车最晚 22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21. - ^ "24
日 起 上海 轨交11号 线恢复跨省 运营". CCTV. 2020-03-23. Retrieved 2020-03-24. - ^ Yihong, Dong (2020-01-27). "为阻
断 疫情传播,上海 轨交11号 线花桥站至 安 亭 站区段 停 运_新 民社 会 _新 民 网". Xinmin.cn. Retrieved 2020-01-26. - ^ "
上海 轨道交通 11号 线陈翔 公 路 站将于8月 25日 开通". 2020-08-23. - ^ Hui, Liu (2022-02-14). "
上海 轨交11号 线昆山 段 3站暂停运营". eastday.com. Retrieved 2022-04-28. - ^ ""
又 可 以乘地 铁上班 了 !"上海 轨交11号 线昆山 段 今 起 恢复运营". www.yzwb.net. Retrieved 2024-04-16. - ^ Shanghai line 11 warns the "bench family" for the first time: Do not use your own small bench in the carriage. Xinmin Evening News. 2019-02-20
- ^ Xiong Yingqi. Passengers of Shanghai Metro Line 11 board the train with a bench and become a unique warning. Beijing Youth Daily. 2019-02-21.
- ^
乘 车指南 > Station信 息 . Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions:点 击相应线路 ,选择Station,点 击"站层图"可 查看相 应Station的 站台结构。 - ^
上海 地 铁迪士 尼 站下周 二 开站末 班 车最晚 22:30.新 民 网. 2016-04-21. Retrieved 2016-04-21. - ^ 11
号 线迪士 尼 段 正式 命名 地 铁"迪 士 尼 "站亮相 . 东方网. 2014-12-10. - ^
上海 地 铁运管 中心 (2015-12-17). 12月19日 起 11、12、13号 线新延伸 段 建 成 试运营. Shanghai Metro Official Site. Retrieved 2015-12-17. - ^ a b
上海 地 铁运管 中心 (2013-08-29). 11号 线二 期 8月 31日 起 通 车试运营. Retrieved 2013-08-29. - ^ a b c
上海 轨交9号 线2期 11号 线北段 1期 12月31日 开通. Tencent (QQ) News. 2009-12-28. - ^ "
上海 轨道交通 11号 线陈翔 公 路 站将于8月 25日 开通". 2020-08-23. - ^ a b 3月29
日 11号 线支线嘉定 新城 —安 亭 通 车试运营 11号 线"Y型 "线路运营同 步 覆 盖早晚 高峰 . Shanghai Metro Official Site. 2010-03-26. - ^ 11
号 线昌吉 东路站开通 方便 周 边乘客 . Shanghai Metro Official Site. 2011-04-28. - ^
上海 地 铁11号 线今开通花 桥段安 亭 到 花 桥仅10分 钟. 东方网. Retrieved 2013-10-17. - ^ Shanghai Metro (2013-08-29). 11
号 线二 期 8月 31日 起 通 车试运营 (in Chinese). Retrieved 2013-08-29. - ^
途 经5个区可 换乘11条 轨交 11号 线北段 二 期 今年 内 完工 . Eastday (in Chinese (China)). 2012-08-05. - ^
上海 市 轨道交通 11号 线北段 工程 补充环境影 响评价公示 (in Chinese) - ^ "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
- ^
上海 市 轨道交通 十 一号线北段车辆.中 车株洲 电力机 车有限 公司 (in Chinese). 2013-11-24. Retrieved 2020-03-20.