Central Cross-Island Highway
You can help expand this article with text translated from the corresponding article in Chinese. (September 2015) Click [show] for important translation instructions.
|
Provincial Highway 8 | ||||
---|---|---|---|---|
Central Cross-Island Highway ( | ||||
Route information | ||||
Maintained by Directorate General of Highways | ||||
Length | 189.8 km (117.9 mi) | |||
Major junctions | ||||
West end | Prov 3 in Dongshi, Taichung | |||
East end | Prov 9 in Xincheng, Hualien | |||
Location | ||||
Country | Taiwan | |||
Highway system | ||||
|
The Central Cross-Island Highway (Chinese:
Construction
The construction of the Central Cross-Island Highway began on July 7, 1956 and was first opened to traffic on May 9, 1960.
Route
The route of the highway begins in the west at Dongshi District in Taichung. The highway originally continued up into the Central Mountain Range following the Dajia River valley through the townships of Guguan (
Highway damage and closure
The highway route runs through exceedingly rugged and unstable terrain. Heavy rain from typhoons often dislodge soil and rocks onto the highway making sections of it impassable. As well, the area is prone to seismic activity which can have disastrous effects on the highway. On September 21, 1999 the Jiji earthquake caused massive damage to the highway and cut the highway in multiple places between Guguan and Lishan.
Following the unprecedented damage to the highway in 1999, there was strong debate on the feasibility and desirability of maintaining and repairing the highway. Extensive and costly repairs proceeded, and earthquake-damaged sections of the highway were due to be re-opened in 2004. However, torrential rains from Typhoon Mindulle caused further damage to the highway, forcing the affected section between Guguan and Lishan to be closed to non-residents indefinitely.[1] While Provincial Highway 8 no longer provides a continuous route across the island, travelers from the west can use Provincial Highway 14 and Provincial Highway 14A to connect with Provincial Highway 8 in the east.
On November 16, 2018, the section between Guguan and Lishan re-opened to limited traffic. 3 medium-sized busses are scheduled to run the route (back and forth) each day but no ordinary private vehicle traffic is allowed.[2]
Gallery
-
Entrance of Central Cross-Island Highway
-
Bicycling uphill at Taroko Gorge
-
Bicyclists share narrow roads with motor vehicles
-
Protection from waterfalls
-
Gorge views
See also
References
- ^ Shan, Shelley (March 9, 2012). "Central Cross-Island Highway travel hours to increase". Taipei Times. Retrieved April 8, 2017.
- ^ RTI English. "Road closed by 921 quake reopens after 19 years". YouTube. Archived from the original on 2021-12-22. Retrieved 22 January 2019.
External links
- Search Taipei Times newspaper archives for references to the highway