Guaanzhuang station
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Guanzhuang, Chaoyang District, Beijing China | ||||||||||
Coordinates | 39°54′33″N 116°35′56″E / 39.9092°N 116.5990°E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Batong line (through operation to Line 1) | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | BT06 | ||||||||||
History | |||||||||||
Opened | December 27, 2003 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Guaanzhuang station[1] (simplified Chinese:
In future, it will be a transfer station with Line 22 (Pinggu line) which is currently under construction.
History
[edit]Guaanzhuang station opened on December 27, 2003. The installation of automatic platform gates started on August 9, 2012,[2] and finished in September 2012.[3]
Name conflict
[edit]This station had the same English name as a station on Line 15, also part of the Beijing Subway system. In Chinese this is not a problem as the station on Line 15 is called 关
In December 2019, the
Station layout
[edit]The station has 2 elevated side platforms.
Exits
[edit]There are 6 exits, lettered A1, A2, A3, A4, B1, and B2. Exits B1 and B2 are accessible.
References
[edit]- ^ a b c "JPG
格式 线路图下载北京 地 铁官方 网站". Archived from the original on 2022-12-31. - ^ (Chinese) 13
号 线、八通线加装屏蔽门工程试点站已于近日开工. Beijing Subway. Archived from the original on September 23, 2012. Retrieved September 15, 2012. - ^ (Chinese)
八 通 线、13号 线试点 站屏蔽门安 装 主体 工程 完工 . Beijing Subway. September 28, 2012. Archived from the original on February 7, 2013. Retrieved November 8, 2012.
External links
[edit]- Media related to Guaanzhuang Station at Wikimedia Commons