Guanzhuang station (Line 15)
Platform | |||||||||||
General information | |||||||||||
Location | North Guanzhuang Road and Beihuqu West Road Datun Subdistrict, Chaoyang District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 15 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 28, 2014 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Guanzhuang station[2] (simplified Chinese: 关庄站; traditional Chinese:
Name conflict[edit]
This station had the same English name as a station on the Batong line, also part of the Beijing Subway system. In Chinese this is not a problem as the station on Line 15 is called 关
In December 2019, the
Station layout[edit]
The station has an underground island platform.
Exits[edit]
There are 3 exits, lettered A, B, and C. Exit B is accessible.
Gallery[edit]
-
Concourse
-
Platform
References[edit]
- ^ a b "JPG
格式 线路图下载北京 地 铁官方 网站". Archived from the original on 2022-12-31. - ^ "JPG
格式 线路图下载". Archived from the original on 2024-01-02. Retrieved 2024-05-11. - ^
北京 朝 阳区关庄站. Retrieved November 8, 2012. - ^
北京 地 铁15号 线开工 明年 10月 可 实现洞 通 . Beijing Times. Archived from the original on December 30, 2014. Retrieved November 8, 2012.
40°00′04″N 116°25′51″E / 40.001134°N 116.430947°E