Guangximen station
Appearance
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Taiyanggong Bridge ( Chaoyang District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 13 | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | At-grade | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 1314 | ||||||||||
History | |||||||||||
Opened | January 28, 2003 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Guangxi Men station[1] (simplified Chinese:
Station layout[edit]
The station has 2 at-grade side platforms.
Exits[edit]
There are 2 exits, lettered A and B. Exit A is accessible.
It will be an interchange station between Line 12 and Line 13 in 2024. Three more exits will be added with Line 12.[2]
Gallery[edit]
-
Concourse
-
Northbound platform
-
Southbound platform
References[edit]
External links[edit]
- Media related to Guangximen Station at Wikimedia Commons
39°58′06″N 116°25′54″E / 39.9684°N 116.4318°E