(Translated by https://www.hiragana.jp/)
Line 21 (Shenzhen Metro) - Wikipedia Jump to content

Line 21 (Shenzhen Metro)

From Wikipedia, the free encyclopedia
Line 21
Overview
StatusUnder planning
LocaleShenzhen, Guangdong
Termini
Stations6 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length12.5km (Phase 1)
CharacterUnderground
Operating speed120km/h

Line 21 of the Shenzhen Metro is an express line under planning, which will connect across Shenzhen through the districts of Nanshan, Longhua and Longgang for 66 kilometers and 26 stations.[1] The first phase of Line 21 originally entered Phase V planning in September 2022, and will run from Aobei to Longyuan in Longgang District, with 6 stations and 12.5 kilometers of track,[2][3] however planning has been put on hold since 31 March 2023. The line is proposed to use 8 car type A trains.[4]

Stations (Phase 1)

[edit]
Station name Connections Location
English Chinese
Aobei 坳背 14 Longgang
Universiade University Town だい运大がくじょう
Universiade North だい运北
Huanggekeng 阁坑  10  16
Longcheng 龙城
Longyuan 龙园 16

References

[edit]
  1. ^ じょう铁规划涉及宝やすふか圳市城市じょうし轨道交通こうつうだい五期建设规划公示. www.sznews.com. 2022-08-27.
  2. ^ しんぞう13じょう铁!ふか圳轨道交どうこうどおりだい五期规划环评首次公示,そく. mp.weixin.qq.com. 2022-08-28.
  3. ^ ふか圳地铁五期规划建设13じょう线路 ねんそこ运营里程りていはたやぶ500公里くり. new.qq.com. 2022-09-07.
  4. ^ 13じょう线路规划公布こうふ. www.sz.gov.cn. 2022-09-07.