(Translated by https://www.hiragana.jp/)
Line 22 (Shenzhen Metro) - Wikipedia Jump to content

Line 22 (Shenzhen Metro)

From Wikipedia, the free encyclopedia
Line 22
22
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
Stations21 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
History
Planned openingMarch 2029; 4 years' time (2029-03)
Technical
Line length34.2km (Phase 1)
CharacterUnderground
Operating speed100km/h

Line 22 of the Shenzhen Metro is an express line under construction, which will connect the districts of Futian, Longhua and Longgang for 38 kilometers and 23 stations.[1] Construction began on 2 January 2024,[2] and the line is expected to open in March 2029. The first phase of Line 22 will run from Shangsha in Futian District to Liguang in Longhua District, with 21 stations and 34.2 kilometers of track.[3][4] The line is proposed to use 6 car type A trains.[5] It is proposed to extend into Dongguan in long term planning.

Line 22 full alignment (in Chinese)

Stations (Phase 1)

[edit]
Station name Connections Location
English Chinese
Shangsha うえすな 7 Futian
Xiangmihu West こうみつ湖西こせい  14   20 
Hongli West 红荔西にし
Xiangmei North こう梅北うめきた 2 8
Beihuan Middle School きた中学ちゅうがく
Kaifeng 凯丰
Minle みん 4 Longhua
Hengling よこ
Minzhi 民治たみじ 5
Minzhi North 民治たみじきた
Yousong あぶらまつ  25 
Songhe 松和まつわ  27 
Gangtou North 岗头きた Longgang
Fengmen'ao 风门坳
Guanhu 观湖 Longhua
Luhu 鹭湖
Luhu North 鹭湖きた
Songyuanxia 松元まつもと 4
Guihua かつらはな
Kukeng 库坑
Liguang はじむこう

References

[edit]
  1. ^ じょう铁规划涉及宝やすふか圳市城市じょうし轨道交通こうつうだい五期建设规划公示. www.sznews.com. 2022-08-27.
  2. ^ 龙华 (2024-01-03). "ふか圳轨道交どうこうどおり22ごう线一期在龙华开工". www.szlhq.gov.cn.
  3. ^ しんぞう13じょう铁!ふか圳轨道交どうこうどおりだい五期规划环评首次公示,そく. mp.weixin.qq.com. 2022-08-28.
  4. ^ ふか圳地铁五期规划建设13じょう线路 ねんそこ运营里程りていはたやぶ500公里くり. new.qq.com. 2022-09-07.
  5. ^ 13じょう线路规划公布こうふ. www.sz.gov.cn. 2022-09-07.